Define Support
Requirements
Draft Special
Agreement
Agree Special
Agreement
Agree Project
Management
Plan
Sign Special
Agreement
Sign Project
Management
Plan
Draft Project
Management
Plan
Start Work
Agency Support to Stakeholders
3
Selection criteria for DNM (1)
 The generic criteria for DNM are stemming from NM IR:
 In the NM IR in Article 4 "Tasks of the Network Manager" it is stated
that "the Network Manager shall perform the following tasks, with a
view to a continuous improvement of the network .....“
 Article 4. 1 (i) “Support the different operational stakeholders within
the obligations that are put to them, in the deployment of air traffic
management/air navigation services (ATM/ANS) systems and
procedures in accordance with the European ATM Master Plan”
Agency Support to Stakeholders
4
Selection criteria for DNM (2)
 Article 4.3.(b) “Ensure the facilitation and coordination between
operational stakeholders and support to these stakeholders in the
deployment and implementation of the plans and related network
measures following cooperative decision making”
 In addition to these NM IR articles selection is made:
 Based on relevance to the agreed Strategic Objectives (SOs) of the Network
Strategy Plan (NSP) and the Network Operations Plan (NOP),
 Based on specific requests from the Network Management Board (NMB)
stemming from identified Network deficiencies and Network performance
shortfalls.
Agency Support to Stakeholders
5
DNM EIS Agreements evolution
45
40
41
35
33
30
25
34
33 29
30
26
30
26
28
24
21
20
15
20
17
10
2006
2007
2008
2009
2010
2011
2012
11
5
76
4
6
3 3
0
Open
8
Originated
5 5
3 44 5
Finalised
Agency Support to Stakeholders
Total
6
Selection Criteria for DSS
SES Legislation
Implementation Report
Requests from
Member States
Agency Support to Stakeholders
7
DSS support to States and Regulatory
Authorities
 Priority – provide technical support to the development / panEuropean implementation of EU & international Regulations
 Rationale – improve the status of regulatory compliance & SES
implementation amongst Member States’ NSAs / CAAs
 EUROCONTROL technical support is aimed at enhancing &
consolidating NSA / CAA capabilities, and helping them to cope with
demands of RP2 & EASA Inspections
 Benefits:
 Facilitate exchange of information & best practices, and bring harmonised
approach at pan-European level,
 Contribute to defragmentation by rationalising the use of limited regulatory
resources & expertise
 Aim – to provide assistance in five generic technical support areas
Agency Support to Stakeholders
8
DSS – generic technical support areas
1.
Align and streamline regulatory activities: the “single” perspective
•
•
•
2.
De-fragmentation through regional initiatives
•
•
3.
Single European regulatory and standardisation roadmap,
Single ATM Safety inspection system,
Single reporting system on regulatory matters
Joint supervisory mechanisms,
Assist EU in assessing FAB compliance
Developing aviation policies
•
Spectrum, Unmanned Aircraft Systems, Environment, Airports, GNSS,
Security (annexes to HLA)
4.
SESAR Deployment (Level 1)
5.
Reinforce Regulators’ capabilities
•
•
Support to the States through ‘Single Sky Implementation Programme’,
Support the European Regulator as technical support body for
monitoring the performance of the Network
Agency Support to Stakeholders
9
DSS – support principles
1. Maintain principles of EIS Policy,
2. Update criteria for prioritisation,
3. For strategic support, use criteria which make largest
contribution to Performance of the European ATM
Network,
4. Identify sub-criteria to define regulatory contribution to
performance of the ATM Network,
5. Develop a transparent prioritisation process.
Agency Support to Stakeholders
10
DSS Support to CAA/NSA
Supporting
NCP
Providing
Documentation
& Training
Agency Support to Stakeholders
Supporting
CAA/NSA
11
NSA Functions – NSA Business Model
State
(Government)
Nominates
Commission
(EC, SES, EASA)
Inform about
recognitions (*)
Reports on ANSP’s performance,
plans and QE delegations, if applicable
Reports
National Supervisory
Authority (NSA)
Qualified Entities (QEs)
Recognises,
delegates
Designates
Certifies, oversees
on going compliance, elaborates and
develops performance plans and
monitors their implementation
ATSP
METP
c
AISP
Conducts surveys,
inspections,
safety reg. audits
and reviews
CNSP
* : Can be delegated to NSA
Training Organisations
Agency Support to Stakeholders
12
Support activities provided
Agency Support to Stakeholders
13
Current support
Agency Support to Stakeholders
14
Questions…?
Questions…?
Download