feasibility and review of housing plan for Tsomo Amathole District Municipality INTSIKA YETHU LOCAL MUNICIPALITY March 2014 Ext 4 (700) Tsomo Ext 4 (700) Feasibility and Review of Housing Plan prepared for INTSIKA YETHU LOCAL MUNICIPALITY EASTERN CAPE DEPARTMENT OF HUMAN SETTLEMENTS PO Box 11, Cofimvaba, 5380 Tel: (047) 874-0061 Fax: (047) 874-0010 31-33 Phillip Frame Road Chiselhurst Tel: +27 (0) 43 711 9735 by Kantey & Templer PO Box ....., East London Tel; 041 373-0738 CNdV africa (Pty) Ltd environmental planning, urban design, landscape architecture 17 New Church Street Cape Town 8000 Tel; 021 424-5022 Fax: 021 424-6837 IQ Vision 110 Sarel Cillier Street Strand 7140 Tel; 021 853-3902 March 2014 CONTENTS 2.1 INTRODUCTION LIST OF ANNEXURES 2.1.2 Purpose of the Report 2.1.2 Background of this Report 2.1.3 Terms of Reference Annexure 1: Ownership Annexure 2: Title Deed Annexure 3: S.G. Diagram 2.1.4 Background to Settlement 2.2 Status of Housing Project and Waiting List 2.3 Land Identification and Ownership 2.4 Engineering 2.5 Environment 2.6 Geo-tech 2.7 Distribution of Social Facilities 2.8 Current Spatial Development Framework 2.9 Future plans of other Sector Departments 2.10 Approval by Council 2.11 Summary and Recommendations LIST OF FIGURES Figure 2.1 .1 Locality Plan Figure 2.1.2 Aerial Photograph Figure 2.1.3 Visual Survey Figure 2.2.1 Statistical Background Figure 2.3.1 Cadastral Layout Figure 2.4.1 Engineering Figure 2.5 .1 Environment Figure 2.6.1 Geo-tech Figure 2.7.1 Distribution of Social Facilities Figure 2.8.1 Current Spatial Development Framework TSOMO EXT 4 (700) FEASIBILITY STUDY CNdV africa (Pty) Ltd 13 April 2015 page 5 CONTENTS GLOSSARY ACRONYMS Informal Site: A Site occupied by a household or to which a household has customary rights, e.g. Permission to occupy (PTO, no longer formally in use) or community agreement via a meeting of elders including headman or chief. BLMC CBA CRU ECBCP ECDHS EIA GP HSP LM MHSP SA SANBI SDF Formal Site: A site occupied by a household or to which a household is entitled to have a registered right recorded at the Deeds Registry with a title deed and surveyors diagram and/or registered General Plan. However, in many instances title deeds have not been issued nor ownership registered. In-Situ upgrade project: Formalising of tenure and installation of services and possibly also construction of a subsidised dwelling on land on which people are already living. Generally refers to a project larger than one unit. Biodiversity Land Management Class Critical Biodiversity Area Community Residential Unit Eastern Cape Biodiversity Conservation Plan Eastern Cape Department of Human Settlement Environmental Impact Assessment General Plan Human Settlement Plan Local Municipality Municipal Human Settlement Plan South Africa South African National Biodiversity Institute Spatial Development Framework Greenfields project: New project site which there has been no formal or informal settlement, industry, infrastructure to date. Project sites are often outside of existing urban development. Infill Project: New project site within existing urban development usually on under utilised or vacant land and which often can help to promote physical integration between spatially isolated parts of the settlement. Rectification projects: Repair or rebuilding of defective existing houses built through one or other government housing program. Erven: The plural of ‘erf’ meaning plots of land each registered as an ‘erf’ in a deeds registry and forming part of a registered General Plan. Plots: The plural of ‘plot’ meaning unregistered pieces of land informally laid out. Portion: A plot of land forming part of a proposed or approved (by LM Council) subdivision layout but which has not yet been registered by the Surveyor General as a general plan and for which erf numbers have not yet been registered. TSOMO EXT 4 (700) FEASIBILITY STUDY CNdV africa (Pty) Ltd 13 April 2015 page 6 INTRODUCTION 2.1.1 PURPOSE OF THE REPORT The purpose of this report is to describe the key elements to be taken into account when assessing the feasibility of Tsomo Ext 4 as a Human Settlement Project and to recommend whether it should be approved or not. 2.1.2 BACKGROUND TO THIS REPORT This report is one of six Human Settlement Project feasibility reports for Ntsika Yethu Municipality. It is designed so that it can be part of a single document that includes the other five projects. 2.1.3 2.1.4 Intsika Yethu Municipality Property Description: Portion of Erf 79, Tsomo Title Deed Number: T663/1998 Servitudes: None (See Annexure 3) Site Size: 30 Ha • The Tsomo Ext 4 (700) project is an urban project in Tsomo within Intsika Yethu Municipality. • Tsomo is one of 2 urban centres in Intsika Yethu Municipality. It is classified a rural town with the role of being a primary service centre to the adjacent rural hinterland. • Tsomo is located south – east of the municipality along the R409 route connecting the N2 national road between East London and Butterworth with the R61 between Cofimvaba and Engcobo. • Tsomo Ext 4 is a settlement situated within the Tsomo commonage, west of the town and takes access from the main gravel route through Tsomo Ext 3. • The site has been invaded by low income earners and is envisaged to become an integrated community with low and middle income dwellers residing in the area. The project terms of reference for the feasibility report are summarised as follows: 1.Determination of housing demand and potential beneficiary status 2.Land identification and ownership 3.Availability of bulk services and confirmation of capacity 4.Environmental conditions; 5.Geo-technical conditions 6.Alignment with Municipal Spatial Planning 7.Visual survey (area visits) 8.Future development plans of other sector departments 9.Provision of recommendation and proposals to ECDHS BACKGROUND TO SETTLEMENT Registered Owner: TERMS OF REFERENCE (Part C.3 Scope of work Tender No. SCMU11-12/13-A0240) Ascertain the feasibility of the project within each MHSP. The study shall reveal the developmental opportunities and constraints in relation to: TSOMO EXT 4 (700) FEASIBILITY STUDY CNdV africa (Pty) Ltd 13 April 2015 2.1 page 8 Locality Plan TSOMO EXT 4 (700) FEASIBILITY STUDY CNdV africa (Pty) Ltd 13 April 2015 Figure 2.1.1 page 9 Aerial Photograph TSOMO EXT 4 (700) FEASIBILITY STUDY CNdV africa (Pty) Ltd 13 April 2015 Figure 2.1.2 page 10 Visual Survey a. Along the R352 road towards Tsomo with Ext 3 and 4 to the east. b. Tsomo Ext. 4 from the R352 c. Tsomo Ext 4 on eastern edge. TSOMO EXT 4 (700) FEASIBILITY STUDY CNdV africa (Pty) Ltd 13 April 2015 Figure 2.1.3 page 11 STATUS OF HOUSING PROJECTS AND WAITING LISTS • 700 subsidies have been proposed for Tsomo Ext 3. These units will comprise a project linked subsidy onto existing Greenfield. TSOMO EXT 4 (700) The site has not been surveyed however it has been invaded by low and middle income dwellers. Population (IYLM SDF 2013) Not Specified Population (2011 Census) Not Specified • The site is envisaged to become an integrated community with both middle and low income groups residing in the area. Ex. Units (IYLM SDF 20...) Not Specified No. Households (2011 Census) Not Specified • The waiting list has been requested and is still awaited for this project. • 2.2 Proposed Units (EC DHS) Waiting List (IYLM LM) 700 Awaited Figure 2.2.1 Statistical Background TSOMO EXT 4 (700) FEASIBILITY STUDY CNdV africa (Pty) Ltd 13 April 2015 page 12 LAND IDENTIFICATION AND OWNERSHIP TSOMO EXT 4 (700) FEASIBILITY STUDY CNdV africa (Pty) Ltd 13 April 2015 2.3 page 13 Cadastral Layout TSOMO EXT 4 (700) FEASIBILITY STUDY CNdV africa (Pty) Ltd 13 April 2015 Figure 2.3.1 page 14 ENGINEERING (Kantey & Templer) BULK SERVICES Existing Services .... 2.4 TOP STRUCTURE .... TRAFFIC IMPACT ASSESSMENT ... INTERNAL SERVICES Existing Services .... ROADS AND ACCESSIBILITY ... GEOTECHNICAL CONDITIONS .... THE PROJECT IS FEASIBLE FOR DEVELOPMENT OF HUMAN SETTLEMENTS. EXISTING INTERNAL SERVICES ARE ADEQUATE AND REQUIRE NO UPGRADING Await K&T TSOMO EXT 4 (700) FEASIBILITY STUDY CNdV africa (Pty) Ltd 13 April 2015 page 15 Engineering (Kantey & Templer) TSOMO EXT 4 (700) FEASIBILITY STUDY CNdV africa (Pty) Ltd 13 April 2015 Figure 2.4.1 page 16 ENVIRONMENT • The site is situated on a gradual slope. • There are no formerly cultivated fields. • The Eastern Cape Biodiversity Plan (ECBCP), 2007 has developed four terrestrial Biodiversity Land Management Classes (BLMCs) according to the terrestrial Critical Biodiversity Areas (CBAs). Each BLMC sets out the desired ecological state that the area should be kept in to ensure biodiversity persistence. • The site falls within CBA 3 as per SANBI data (2007) and therefore is subject to BLMC 3 guidelines according to the ECBCP. This must be ground-truthed by a botanist, prior to undertaking the Human Settlement Project. • BLMC 3 permits the land to be used for Conservation, Game Farming and Communal Livestock. Settlements are permitted with conditions. • However, it can be seen on Fig. 2.5.1 that CBA 3 is shown as extending over most of the urban areas of Tsomo. This is clearly incorrect and the mapping of CBA 3 in this vicinity has not been ground-truthed and amended. • The Mlolwana river flows north east of the site, see Figure 2.5.1. • Housing development would need to ensure that it remains 32m from the River or watercourse so as to avoid triggering NEMA EIA Regulations, namely Listing No. 40 as identified in the Government Notice R. 344 (Listing Notice 1). In which a basic assessment would be required for the following activities. 2.5 The expansion of: (i) jetties by more than 50 square metres; (ii) slipways by more than 50 square metres; or (iii) buildings by more than 50 square metres (iv) infrastructure by more than 50 square metres within a watercourse or within 32 metres of a watercourse, measured from the edge of a watercourse, but excluding where such expansion will occur behind the development setback line. TSOMO EXT 4 (700) FEASIBILITY STUDY CNdV africa (Pty) Ltd 13 April 2015 page 17 Environment TSOMO EXT 4 (700) FEASIBILITY STUDY CNdV africa (Pty) Ltd 13 April 2015 Figure 2.5.1 page 18 GEO-TECH • Preliminary and Phase 1 geotechnical site investigations are required to obtain a more accurate evaluation of the development potential of each site, but the initial indications are that the geology is suitable for further development of these areas. • Some potential geotechnical constraints have been identified for further investigation which may have an impact on the extent of the developable land and/or the development costs. • The recommended typical foundations for subsidy housing are conventional strip foundations or light rafts to cater for variations in soil profile and minor soil movements. • On sloping terrain, some earthworks and retaining walls may be required to create level platforms for houses and this can have significant cost implications. • Foundations should be placed on well compacted natural soil, engineered fill or rock. Founding conditions will have to be inspected by the engineer to confirm suitable soil conditions with adequate bearing capacity and to check for any seepage or groundwater problems. • In terms of the geotechnical information available, the proposed housing projects appear to be feasible and planning should proceed with further investigations on individual sites. (Outeniqua Geotechnical Services cc, 2013) TSOMO EXT 4 (700) FEASIBILITY STUDY CNdV africa (Pty) Ltd 13 April 2015 2.6 page 19 Geo-tech TSOMO EXT 4 (700) FEASIBILITY STUDY CNdV africa (Pty) Ltd 13 April 2015 Figure 2.6.1 page 20 DISTRIBUTION OF SOCIAL FACILITIES • Tsomo has only one existing combined school which is less than the 1 km walking distance. • There is one existing clinic located in town less than 1 km walking distance from the site. • The police station is located in town on the main road. • This proposed Human Settlement Project will not require provision of additional facilities. TSOMO EXT 4 (700) FEASIBILITY STUDY CNdV africa (Pty) Ltd 13 April 2015 2.7 page 21 Distribution of Social Facilities TSOMO EXT 4 (700) FEASIBILITY STUDY CNdV africa (Pty) Ltd 13 April 2015 Figure 2.7.1 page 22 CURRENT SPATIAL DEVELOPMENT FRAMEWORK • The SDF does not make specific proposals for Tsomo, however it recognises the 2010 Small Town Development Plan undertaken for Tsomo, see Fig. 2.8.1.1. The plan proposes extensions for future residential growth extend north west. (Intsika Yethu SDF 2013, 43). • The Project is in line with the SDF. 2.8 Figure 2.8.1.1 Tsomo town development plan (Source: IYLM SDF 2013) TSOMO EXT 4 (700) FEASIBILITY STUDY CNdV africa (Pty) Ltd 13 April 2015 page 23 Current Spatial Development Framework TSOMO EXT 4 (700) FEASIBILITY STUDY CNdV africa (Pty) Ltd 13 April 2015 Figure 2.8.1 page 24 FUTURE PLANS OF OTHER SECTOR DEPARTMENTS 2.9 • The following table indicates the future plans of other sector departments proposed in the various settlements as contained in the IDP 2013-2014. Tsomo Ext 4 300 (Ward 8) Tsomo Ext 3 250 (Ward 8) Mahlubini 348 (Ward 14) Government Dep./ Other CHDM CHDM CHDM CHDM CHDM MIG OPEX Eskom DR&PW MIG MIG MIG DoEA Joe Slovo 587 (Ward 14) Project Bulk Sewer Sanitation Bucket Eradication Bulk Water Backlog Sewerage Treatment Plant Stormwater Equipping and Repairing of boreholes Electricty Connection Flood Damages Project Construction of Sport Field Construction of Community Hall Upgrading of Roads Greening and Beautification project Ekuphumleni 820 (Ward 14) No. 1 2 3 4 5 6 7 8 9 10 11 12 13 Nyanisweni 431 (Ward 14) Future Plans of other Sector Departments for Intsika Yethu Municipality 2013/2014 & 2014/2015 Budget '13/'14 R 2 000 000 R 500 000 Budget '14/'15 R 5 000 000 R 100 000 R 1 300 000 R 2 000 000 R 497 799 R 524 238 R1 700 000 R 3 000 000 • The Sanitation and Bulk Water backlog projects are envisaged to occur in Ward 8 and will impact the Tsomo Ext 4 project. TSOMO EXT 4 (700) FEASIBILITY STUDY CNdV africa (Pty) Ltd 13 April 2015 page 25 APPROVAL BY COUNCIL 2.10 • The Council Resolution is awaited from the municipality. TSOMO EXT 4 (700) FEASIBILITY STUDY CNdV africa (Pty) Ltd 13 April 2015 page 26 SUMMARY AND RECOMMENDATIONS 2.10.1 SUMMARY 2.10.2 2.11 RECOMMENDATIONS • The site was inspected on 28/10/2013 and the conclusions below ground-truthed. • The project is feasible, pending an assessment by a botanist is required to ground truth the extent of CBA 3 in Tsomo Ext 4. • There are adequate engineering services. (K&T to confirm) • Depending on the outcome it is recommended that the award of subsidies can proceed in Tsomo Ext 4. • In Terms of ECBCP BLMCs that apply to CBA 3, settlements are not recommended. However, the extent of the CBA 3 in and around Tsomo is clearly inaccurate as it is indicated as covering all of the developed areas. It is recommended that the site be assessed by a Botanist to ground-truth the extent of CBA 3 on the site prior to the commencement of the Human Settlement Project. It is unlikely that an EIA will be required. • A detailed geo-technical site visit inspection and, if necessary, survey will be required prior to the project commencing. • The waiting list has been requested from the municipality and is still awaited from this municipality. • There are no new social facilities required to support the proposed human settlements project. • The Human Settlement Project is in line with the SDF. • The Council Resolution is still awaited from the municipality. TSOMO EXT 4 (700) FEASIBILITY STUDY CNdV africa (Pty) Ltd 13 April 2015 page 27