STAFF BRAND BRIEF 04th May 2012 Marketing & Sales Department TELECOMMUNICATION SITE BUILD (Briefing Session) INF/TEN/0191 13 March 2014 1 Agenda items 1. Supply Chain Management presentation STAFF BRAND BRIEF 2. Facilities Management presentation 04th May 2012 Marketing & Sales Department 3. 4. SHEQ presentation Project Management presentation 5. Closing 2 1. Supply Chain Management Presentation 3 SCM presentation Key dates • RFP issue date is 28 February 2014 • Briefing session date is 13 March 2014 • Closing date for questions is 18 March 2014 • Closing date for Bid submission is 27 March 2014 @ 12h00 Key Required documents • Valid BBBEE Certificate • Valid and Original Tax clearance certificate • Confidentiality Agreement – Annexure E • SBD 4 Declaration of Interest – Annexure F • Bill of material - Annexure H • No late bids will be accepted • Supplier Development Value Summary – Annexure J • Compliance Sheet – Annexure K S D Committement • A 35% is a pre-requisite before evaluation, service provider will need to committee on this %, which will be a monitoring tool during implementation and will further form part of the resulting contract. Appointment of a panel of services providers for 3 years framework agreement Type: The appropriate FA: National A Area Regional Single B Number of suppliers Multiple Approach: • Depending on the business requirement Infraco may need a supplier/s with a national footprint • There are different variables that could regulate a national contract including but not limited to region and availability • Regional FA’s are in support of Infraco’s procurement policy regarding supplier development initiatives • Regional FA’s support local businesses and have benefits ranging from lower logistics costs and regional improvements • Single appointment will be based on minimum site . The normal procurement process will be followed when awarding to a single or multiple suppliers • Where the requirement/s is /are urgent and there is a number of sites that need to be build, Infraco will appoint a number of service providers to speed-up the build program. Business approach Framework Agreements Single Supplier: Multiple Suppliers: • Some of the key components of a single supplier FA are: ‒ An agreed upon fixed price list prior to entering into the agreement ‒ If there is an agreed upon volume to the agreement, Infraco need to ensure that the appropriate exist clauses are included in the contract ‒ Due to the risk Infraco take when contracting with a single supplier, the relevant penalty clauses need to be included in the contract and enforced where necessary ‒ The FA creates a faster turn around time for procurement but does not limit Infraco to procuring from the sole supplier • Some of the key components of a multiple supplier FA are: ‒ Business will be awarded on a rotational basis in order to support the notion of developing and entrenching Infraco’s supply chain ‒ Infraco need to ensure agreed rates with the multiple suppliers (preferably where the rates are the same) ‒ If the rates differ, Infraco needs to: 1. Enter into negotiations and/or; 2. Distribute the business on a percentage basis to ensure that they are not subject to a premium ‒ The core benefit of a FA is the ability to call-off as and when required INF/TEN/0191 – SITE BUILD Facilities Management National Site (network) Coverage 154 operational sites: National coverage; 10m x 15m (7x4) & 10m x 10m (4x4); Types: containers, Transnet/Neotel/3rd Party building to Data Centre Broadband Infraco’s National Long Distance Network covers most major cities and towns and all nine provinces. Slide 8 Covered in the Framework 1. Establish a completely new site (container & building where needed) 2. Renovation/improvement of current sites: replacement of mesh fence, etc 3. Attend to any repairs/maintenance issues: stolen earth system, etc Slide 9 Areas to Cover 1. 2. 3. 4. 5. 6. Demolition, excavation & trenching Install sleeves, pole/s, drawboxes, electrical cables Electrify site between municipality/Eskom/3rd Party & container Install a complete earthing system Design, manufacture, transport & install galvanised palisade/rebar Build concrete structures like ramps, retainer wall, plinth, drainage system, etc Slide 10 Expected to (before & after Implementation): 1. Travel nationally in order to: Conduct detail survey Establish site specific conditions (soil, need for EIA, etc) Design site & get drawings approved Generate quotation 2. Acquire permission from munic/owner/etc for: To remove/demolition/cut trees, etc Use/connect to certain facilities or resume work, etc 3. Rectify any outstanding issues raised at site acceptance meeting including the rehabilitation of the site. 4. Develop & submit an As-Built file with the ff. minimum items: Test results – soil compaction, plinth strength, earthing, galvanising Updated drawing Acquired approvals Other project & SHEQ related requirements Slide 11 Changes to Spec No kerb stones Perimeter fence foundation 32mm sleeve Vegetation clearance beyond site Ripper razor – diamond mesh Slide 12 Site & Area Condition Slide 13 National Facility Sites Slide 14 Thank You. Slide 15 3. Project Management Presentation 16 Introduction A project management plan is the planning document, capturing the entire project end-to-end, covering all project phases, from initiation through planning, execution and closure. Slide 17 Body of Knowledge • Overview: Why the project is being conducted and its primary objectives • Scope Management: Business needs, requirements, deliverables, constraints and work breakdown structure • Schedule Management: Activities schedule and project milestones • Costs Management: Project budget and its funding approach • Quality Management: Quality measurement and control approach • HR Management: The people working on the project, their roles and responsibilities • Communication Management: Communication type, channels and the reporting approach Slide 18 Body of Knowledge Conti… • Risks Management: Risk index, methods to identify and evaluate risks, risk mitigation and contingency planning • Procurements Management: Required procurements and purchase processes • Change Management: Procedures used to track changes in the project • Project Closure: Closure approach, including the deliverables hand-off protocol Slide 19 Thank you Slide 20 4. SHEQ Presentation 21 SHEQ Requirements S.H.E Plans 1. Safety Plan 2. Health Plan 3. Environmental Plan Slide 22 S.H.E Appointments Signed Appointment Letters: 1. 16.1 Appointment 2. 16.2 Appointments 3. 17.2 Appointments 4. GAR 7 Appointments(valid certificate to be attached) 5. All Relevant CR Appointments. Slide 23 COIDA Valid Certificate of Good Standing(s 89)-Compensation Fund Slide 24 Risk/ Aspect Impact Assessment A site specific Aspect Impact/ Risk assessment is required, outlining specific Risks and hazard, taking into account BBI work environment. Slide 25 S.H.E Procedure Documented SHE procedures(ISO 1400/OHASAS 18001) At least 3. Slide 26 Quality Management System-ISO 9001 Quality Manual – Requirement. Slide 27