Add:Che Guo Dong Rd. Che Fang Town, SIP Tel:0512-62386800 Fax:0512-62386800 Mobile:18261705090 Company Introduction Company Briefing Established in:April,2009 Registered Capital: RMB 8,200 million Main Business:Sludge Disposal Waste Treatment Industrial Waste Water Treatment Environment Protection eg.Urban Waste Mgt. Shareholder:CS Public Utilities Development Co.,Ltd SINO FRENCH Water Co,Ltd Powerful Parent Company WATER GAS Thermal Power 核心 业务 Environment Tech. Energy Services Municipal Engineering Property Development Powerful Parent Company SINO FRENCH WATER China, two of which involve sludge 25 JVs in 18 cities across Company Culture Values Pragmatic, Creative, Cooperative, Win-win Our Mission Committed to sustainable development of China’s Environment Social Responsibility low carbon ,harmony and public welfare Project Introduction Event • Place • Date • Your Name Project Introduction Project:Phase I of Sludge Disposal and Recycling Project of Suzhou SIP Location:East Che Guo Rd., SIP Main Business: sludge treatment from plant in SIP Capacity:300 tons of dewatered sludge per day Total Investment:216 million RMB Technology :2 phase drying process(Innodry 2E) 3 independent production line (100 ton per) Performance:solid content from 20% to 70-90% Final usage:fuel for power plant mixed with coal Features and advantages of Sludge Drying Hazard-free and stabilization reducing quantity to max extent energy recycling of dried sludge as biomass 3300 kcal / ton useful thermal 0 20% Dry content 40% 60% 80% 90% saving large piece of land Advanced Technology and Idea (I) Industry Synergy and Recycling wastewater SIP wastewater Wastewater treatment plant wet sludge recycled water steam Sludge drying plant Dry sludge hot water steam Centralized heating/cooling Cogeneration Plant Advanced Technology and Idea (II) Energy saving, low consumption, safe and reliable Low consumpiton Saving 30%heat by reusing heat from process 1 in process 2 0.8 ton steam consumption / ton water evaporation Low temperature Sludge contact temperature ≤105℃ Dust free formation of sludge takes place at 55% solids Result of Energy Conservation and Emission Reduction 3,844,800 t/year Water Saving Coal Saving recycled water as cooling medium Carbon Reduction 15,030 t/ year 29,543 t CO -eq/year 2 Emission Reduction Solid waste 10,000 ton per year Take dry sludge as fuel Hot Water recycling at thermal plant Bottom ash reused as building material 90,000 ton desalinated water per saving year … Honor Awarded Suzhou High-quality Structures Award , December 2010 Suzhou Recycling Economy Demonstration Projects , December 2010 Urban Demonstration Project of Jiangsu Province, July 2010 Major Project of Taihu Lake Watershed Suzhou industry Park Eco Optimized Major Project Event • Place • Date • Your Name Authorities Involvement Visited by Mr. Zhu Guangyao, former vice chief of state bureau of Environmental Protedtion Visited by Mr.He Quan, vice governor of Jiangsu Province Visited by Mr. Zhou Lan, chief of Housing Construction Office of Jiangsu Province Visited by Chief of Environmental Protection Office Visited by Mr.Wan Bentai, general engineer of National Environmental Protection Dept. Group photo of Completion Ceremony OPERATION Standardized Production Comprehensive labelling Production Capacity June 24th:Max. daily treatment capacity 350 tons June 15th:cumulative capacity 10000 tons May 26th:daily treatment capacity stabilized over 250 tons May 19th:daily treatment capacity exceed 200 tons May 6th:Trial operation of three lines April 15th: Construction Completion Ceremony SINO FRENCH ENVIRONMENT Practitioner of Circular Economy in China Looking Forward to Your Visit Thank You