• Project Description
> Mixed-use project.
 128 Rental Apartments.
 5,000 square feet of commercial space.
 203 parking spaces.
» 134 spaces in one level of subterranean parking.
» Accessed from Walnut Street.
> Two buildings.
 West: 15 units in three stories.
 East: 113 units in four stories.
> Meridith Avenue to be vacated.
2
Allen-Walnut TOD Project
Planning & Community Development Department
E Corson St
N Allen Ave
800 feet
Locust St
Project
Site
E Walnut St
3
Allen-Walnut TOD Project
Planning & Community Development Department
• Vicinity
4
Allen-Walnut TOD Project
Planning & Community Development Department
Locust St
Permitted
“By Right”
N Allen Ave
CG
N Meridith
Ave
RM-16
Conditional Use
Permit For Housing
ECSP-CG-3
E Walnut St
Meridith Ave.
Street Vacation
5
Allen-Walnut TOD Project
Planning & Community Development Department
Permitted
“By Right”
N. Allen Ave.
Conditional Use
Permit For Housing
Meridith Ave.E. Walnut St.
Street Vacation
6
Allen-Walnut TOD Project
Planning & Community Development Department
Conditional Use
Permit For Housing
• South Elevation
Permitted
“By Right”
Meridith Ave.
Street Vacation
• East Elevation
7
Allen-Walnut TOD Project
Planning & Community Development Department
• Looking northeast across Walnut Street
8
Allen-Walnut TOD Project
Planning & Community Development Department
• Looking northwest across Allen Avenue
9
Allen-Walnut TOD Project
Planning & Community Development Department
• Entitlements:
> Conditional Use Permit to construct housing on the CGzoned portion of the site;
> Street Vacation of Meridith Avenue; and
> Design Review.
10
Allen-Walnut TOD Project
Planning & Community Development Department
• Review Authorities:
> Planning Commission made recommendation on Street
Vacation, Conditional Use Permit, and environmental
review to City Council.
> City Council makes final decision.
> Design Commission will conduct design review.
 Tentatively scheduled for December 10.
> Arts & Culture Commission will conduct public art
component review.
 Preliminary review occurred on October 9.
11
Allen-Walnut TOD Project
Planning & Community Development Department
• Public Art Ordinance.
> 1% of the building permit valuation shall be allocated by
a developer for a public art component.
 Design Commission cannot approve Concept Design Review
for the project until submittal of a Public Art Application.
 Concept Art Plan must be submitted within 45 days of Concept
Design Review.
 Final Design Review cannot occur until the Concept Art Plan is
approved.
 Final Art Plan must be submitted within 45 days of Final Design
Review.
> 20% of 1% is due upon submittal for building permit
plan check.
12
Allen-Walnut TOD Project
Planning & Community Development Department
• Review Authorities:
> Arts & Culture Commission reviewed Preliminary
Concept Art Plan on October 9, 2013.
 Commission directed applicant to return for Concept Art Plan
review prior to submittal of Final Art Plan:
» More fully develop art concept to, “…provide complexity and
layered meanings beyond aesthetic design…”
 Staff is recommending a revised condition of approval #20:
» “The project shall meet all requirements of the Public Art Process.
The applicant shall submit a formal application for Concept Art
Plan for review and approval by the Pasadena Arts and Culture
Commission within 90 days of the effective date of this approval.”
 Cultural Affairs staff will continue to work with applicant, art
consultant, and artist to evolve public art component.
13
Allen-Walnut TOD Project
Planning & Community Development Department
• Planning Commission.
> Public Hearing held October 23, 2013.
> Voted 8-0 to recommend approval of project and
environmental documents.
> An addendum was prepared in response to questions
about traffic study methodology.
> Two speakers voiced opposition to project:
 Increased traffic congestion; and
 Inadequate on-site parking.
14
Conditional Use Permit #6036
Planning & Community Development Department
• Density Bonus
> State Law
 Senate Bill 1818
> Section 17.43 of Zoning Code
 Multi-family or mixed-use project with five or more units (before
the bonus).
 Affordable categories:
» Very Low Income;
» Low Income; and
» Moderate Income.
 Permitted “by-right”.
 Comply with all applicable codes and requirements.
 Environmental review required.
15
Conditional Use Permit #6036
Planning & Community Development Department
• Density Bonus
> Maximum density bonus allowed varies:
% of housing
(before bonus)
% of bonus
(over max)
Very low
income
housing
5%
10%
11%
20%
27.5%
35%
Low income
housing
10%
15%
20%
20%
27.5%
35%
Moderate
income
housing
10%
20%
30%
40%
5%
15%
25%
35%
16
Conditional Use Permit #6036
Planning & Community Development Department
• Density Bonus
> Developers may request concessions or waivers from
development standards in order to provide affordable
units.
> No deviations from any development standards
proposed as part of this project.
17
Conditional Use Permit #6036
Planning & Community Development Department
• Zoning Code Compliance:
> Residential Density/Density Bonus:
 Nine ‘very low income’ units; and
 One ‘moderate income’ unit.
> Permitted density bonus:
 30 percent, or 33 more units.
 16 percent, or 18 unit proposed.
18
Conditional Use Permit #6036
Planning & Community Development Department
• Zoning Code Compliance:
> The project is in compliance with other applicable
development standards of the Zoning Code including:
 Setbacks; Encroachment plane; Height; and Floor Area Ratio.
> All applicable development standards will be verified
during review of plans submitted for building permit.
19
Conditional Use Permit #6036
Planning & Community Development Department
• Zoning Code Compliance: (continued)
> Parking for TOD projects:
Land Use
Residential
Guests
Commercial (restaurant)
Commercial (retail) or
Commercial (office)
Zoning Code Requirement (TOD)
1.0-1.25 / unit < 650 s.f.
1.5-1.75 / unit ≥ 650 s.f.
1.0 per every 10 units
9.0 per 1,000 s.f.
2.7 per 1,000 s.f.
2.25 per 1,000 s.f.
20
64 units
64 units
128 units
2,500 s.f.
2,500 s.f.
2,500 s.f.
Total
Minimum
Spaces
Required
64 (80 max.)
96 (112 max.)
13
23
7
6
202 or 203
Spaces
Proposed
64
96
13
23
7
6
202 or 203
Street Vacation
Planning & Community Development Department
• Portion of Meridith Avenue to be vacated:
> Dead-end terminus.
> 80 feet wide and 120 feet from Walnut Street north.
> Located between 1727 &1757 E. Walnut St.
• Vacated area to be used for:
> Occupied by portion of new construction; and
> Private driveway to access the site.
• Letters of support from adjacent property owners.
21
Street Vacation
Planning & Community Development Department
• Current Condition of Meridith Avenue:
> 17-foot wide sidewalk on both sides; and
> 46-foot wide roadway.
> Terminates at north end:
 Does not comply with Pasadena standards for cul-de-sacs.
 Not sufficient turn-around space for public and street
maintenance vehicles
> Curb ramps at corners do not comply with Pasadena
standards for ramps.
• 46-foot wide crossing will be replaced private
driveway, reducing its width by half.
22
Street Vacation
Planning & Community Development Department
• Department of Public Works has determined:
> No need, present or future, to retain this area for its
intended public purpose.
> Relinquishing all rights to vacated area will relieve the
City from future maintenance responsibilities and any
liability associated with the vacated area.
23
Street Vacation
Planning & Community Development Department
• Department & Agency Comments:
> Notice (March 2013) sent to various utilities, other City
departments, and County agencies.
> Comments received:




Pasadena Water and Power;
Pasadena Public Works;
AT&T; and
Charter Communications.
24
General Plan & Specific Plan Consistency
Planning & Community Development Department
• General Plan Land Use Element:
> Project is consistent with following Objectives and
Policies:
 Targeted Development (1.1 and 10.1: Targeted Development
Areas, 1.2: Specific Plans, 1.3 and 10.2: Transit-Oriented and
Pedestrian-Oriented Development, 1.4: Mixed-use);
 Affordable Housing (3.1: Exemption for Affordable Housing, 3.2
Density);
 Character and Scale of Pasadena (5.7: Enhanced Environment
and 5.10 Spatial Attributes);
 Job Opportunities (11.2: Employment Diversity and 11.7:
Increase Jobs).
25
General Plan & Specific Plan Consistency
Planning & Community Development Department
• General Plan Land Use Element: (continued)
> Project is consistent with following Objectives and
Policies:
 Housing Conditions (15.1: Sizes and Types, 15.2 Increase
Supply, 15.3: Equitable Distribution);
 Transit/Pedestrian Coordination (22.1: Urban Design, 22.3:
Pedestrian Access); and
 Participation (27.4: Consultation)
» Neighborhood Meetings hosted at site:
» March 23, 2013
» October 12, 2013
26
General Plan & Specific Plan Consistency
Planning & Community Development Department
• East Colorado Specific Plan:
> Specific Plan supports:




Beautifying streetscape;
Increasing supply of multi-family and affordable housing;
Improving multi-modal mobility;
Creating focus areas, or “nodes”, to help establish a sense of
place.
> Gold Line Sub-area:
 Higher density residential projects along Allen Avenue.
 Mix of uses, including ground-floor retail/commercial and
residential and/or office uses above.
27
Environmental Review
Planning & Community Development Department
• Initial Environmental Study:
> Topic areas with less than significant impacts include:






Aesthetics;
Air Quality;
Geology and Soils;
Greenhouse Gas Emissions;
Noise; and
Transportation/Traffic.
> Topic areas with potentially significant impacts:
 Cultural Resources; and
 Hazards and Hazardous Materials.
28
Environmental Review
Planning & Community Development Department
• Cultural Resources:
 Excavation may reveal archeological / paleontological resources.
 Mitigation Measures:
» Qualified archaeologist and/or paleontologist retained in order to
investigate the resources.
• Hazards and Hazardous Materials:
 Soils have contamination from previous uses.
 Mitigation Measures:
» Remediation and disposal of any contaminated soil, asbestos, and
lead-based paint on the site, as well as the disposal of the hydraulic
hoists from former auto repair use.
• Impacts Mitigated to Less Than Significant Level.
29
Environmental Review
Planning & Community Development Department
• Transportation and Traffic:
> Traffic Study.
 7 street intersections:
» No intersections would be impacted.
 4 street segments:
» Threshold of impact:
» 5.0%.
» Street segment impacts:
» 0.5% to 2.2%.
• Less than Significant Impact.
30
Environmental Review
Planning & Community Development Department
• Transportation and Traffic:
> Addendum prepared at Planning Commission’s
request:
 Methodology used in selecting intersections and street
segments to be analyzed;
 Explanation of trip generation adjustments (e.g., internal
capture of trips between land uses in a mixed-use
development, proximity to transit, etc.); and
 Increase in street segment impacts to not account for trip
adjustments:
» Range with adjustments: 0.5% to 2.2%
» Range without adjustments: 0.6% to 2.4%
31
Conclusion
Planning & Community Development Department
• Compatibility Analysis:
> Project is compatible with surrounding mix of commercial
and residential uses.
 Greatest mass of project is located along Walnut Street and at
the corner of Allen Avenue and Walnut Street, a prominent
intersection in the city.
 Lowest mass of project is located adjacent to the existing
residences to the northwest of the site:
» 40 foot separation.
32
Conclusion
Planning & Community Development Department
• Compatibility Analysis:
> Surrounding area is one in transition:
 Away from commercial/industrial uses
 Towards a vibrant mix of commercial, retail, and residential uses,
as envisioned by the East Colorado Specific Plan.
> Project is a part of this transition
 Will set high standard to positively influence future development
in the years to come.
33
Recommendation
Planning & Community Development Department
• Staff recommends that the City Council:
1) Adopt a Mitigated Negative Declaration and Mitigation
Monitoring and Reporting Program;
2) Adopt Findings in Attachment A and Conditions of
Approval in Attachment B to:
 Approve Conditional Use Permit: to construct housing on a CGzoned site as part of a TOD project.
» Revised condition of approval #20:
» “The project shall meet all requirements of the Public Art
Process. The applicant shall submit a formal application for
Concept Art Plan for review and approval by the Pasadena
Arts and Culture Commission within 90 days of the effective
date of this approval.”
34
Recommendation
Planning & Community Development Department
• Staff recommends that the City Council:
3) Find that the vacation is consistent with the General
Plan Mobility Element and is unnecessary for public
use for street purposes;
4) Declare that the City's interest in the vacation is in
easement only for public street purposes; and that the
land is not owned by the City as fee title;
5) Adopt a resolution vacating the subject portion of land,
in accordance with conditions and recommendations;
35
Recommendation
Planning & Community Development Department
• Staff recommends that the City Council:
6) Authorize the City Manager to execute a Condition
Satisfaction Contract between the City and the
applicants.
7) Direct staff to file a Notice of Determination within five
days.
36
Planning & Community Development Department
Conditional Use Permit #6036 &
Street Vacation
1727-1787 East Walnut Street and
235 North Allen Avenue
“Allen-Walnut TOD Project”
City Council Meeting
November 18, 2013
Environmental Review
Planning & Community Development Department
• Transportation and Traffic:
> Addendum:
 Identification of intersections and segments in Traffic Impact
Study Area:
A. Immediately adjacent or in close proximity to the project site;
B. In the vicinity of the project site that are documented to have
current or projected future adverse operational issues; and
C. In the vicinity of the project site that are forecast to experience a
relatively greater percentage of project-related vehicular turning
movements.
38
General Plan & Specific Plan Consistency
Planning & Community Development Department
• Draft Land Use Element Map:
N Allen Ave
Locust St
E Walnut St
 CG portion: 19,166 s.f.
 ECSP portion = 64,469 s.f.
» 1.0 FAR = 19,166 s.f.
» Project = 15,100 s.f.
» 2.25 FAR = 145,055 s.f.
» Project = 114,940 s.f.
39
Allen-Walnut TOD Project
Planning & Community Development Department
• City’s Inclusionary Housing Ordinance
> Multi-family or mixed-use project with 10 or more units.
> Minimum 15% of total units shall be affordable
(low or moderate income units):
 % can be reduced for very low income units.
 Certain City fees reduced for on-site affordable units.
 Option of an in-lieu fee.
> 1994-2012 – a total of 993 affordable units were built
Citywide:
 15% of all units constructed.
40
Allen-Walnut TOD Project
Planning & Community Development Department
• Density Bonus Law (SB 1818)
> Multi-family or mixed-use project with 5 or more units
(before the bonus).
> Affordable categories (based on total housing cost):
 Very Low – total housing cost is 30% of 50% of the Los
Angeles County median income.
 Low Income – 30% of 80%.
 Moderate Income for sale – 40% of 110%.
 Moderate Income for rent – 30% of 120%.
> Permitted “by-right”.
> Comply with all applicable codes and requirements.
> Environmental review required.
41
Allen-Walnut TOD Project
Planning & Community Development Department
• Density Bonus Law (SB 1818)
> Maximum density bonus allowed varies:
% of housing
(before bonus)
% of bonus
(over max)
Very low
income
housing
5%
10%
11%
20%
27.5%
35%
Low income
housing
10%
15%
20%
20%
27.5%
35%
Moderate
income
housing
10%
20%
30%
40%
5%
15%
25%
35%
42
Allen-Walnut TOD Project
Planning & Community Development Department
• Concessions & incentives (SB1818)
> Multi-family or mixed-use project with a density bonus.
> Includes a reduction in a development standard or
modification of another Zoning Code requirement:
 Results in an identifiable, financially sufficient & actual cost
reduction.
 Does not include additional density beyond the density bonus.
> Number of concessions or incentives vary:
Very Low
Low
Moderate (sale)
One
5%
10%
10%
Two
10%
20%
20%
Three
15%
30%
30%
43
Allen-Walnut TOD Project
Planning & Community Development Department
• Concessions & incentives (SB1818)
> Affordable Housing Concession Permit:
 Public Hearing before the Hearing Officer; appealable to BZA.
 Processed like a Minor Variance.
 Design review required; environmental review completed.
> Specific Findings:
 Required in order for the units to be affordable.
» Staff hires a consultant to complete a fiscal study to verify
concessions are necessary.
 Will not have a negative impact on public health, safety, the
environment or a historic resource.
> Waivers to Development Standards
44
Allen-Walnut TOD Project
Planning & Community Development Department
• Density Bonus Law (SB1818)
> Concessions approved:
 Five total:
» Floor area (2), floor area & height (1), commercial depth (1)
and street setbacks (1)
 Locations:
» Central District Specific Plan (4)
» Fair Oaks/Orange Specific Plan (1)
 Number of units in a project:
» Total of 25 bonus units, or 22% over density.
» Range from one bonus unit to 13 bonus units per project.
> No waivers approved