Frankfurt (Germany), 6-9 June 2011 Grid Operational Efficiency Project HIFFI (WfM implementation) Kosice, May 2011 VSE a.s., Košice, Slovakia Marian Mester, head of Grid operation Juraj Sabol , head of IT and telco mamagement section Frankfurt (Germany), 6-9 June 2011 Company Profile energy utility company member of the RWE Group since 2003 more than 605 000 points of delivery mission = provide reliable and complex services which correspond to the needs of customers sold more than 3,2 TWh in 2010 Distribution area: 16 221 km2 average number of employees = 1,575 HV Lines: 1 274 km Shareholders National Property Fund: 51 % RWE: 49 % HV & MV substations: 56 MV Lines & Cables: 8 207 km MV/LV Distribution stations: 4 974 LV Lines & Cables: 10 986 km Frankfurt (Germany), 6-9 June 2011 Implementation of workforce management system with several aims (Part 1): Efficiency / Productivity Operational excellence / Reduction of operational costs / Cost transparency Implementation of workflow-system for systematic, fully standardized and asset condition oriented maintenance Optimal allocation of human and production capacities Optimal distribution of working orders related to priorities, geographical location, optimal time reaction in case of outage / failure 3 Frankfurt (Germany), 6-9 June 2011 Implementation of workforce management system with several aims (Part 2): Regulation / Grid Quality / Renewal of Grid Assets Grid quality: improve SAIFI and SAIDI Reduction of critical assets (asset in bad technical conditions) by condition and riskbased maintenance Asset operational safety High quality and actual data of asset conditions support short and mid-term CAPEX / OPEX planning Reasonable allocation of financial means for asset renewal (CAPEX / OPEX) Reduction of numbers of used IT systems (registers of asset conditions, planning of maintenance activities, ...) Standardization of IT landscape (unified integration platform) Frankfurt (Germany), 6-9 June 2011 Long term preparation for WfM project Grid Organization One grid unit (aprox 250 people) fully responsible for HV/LV : - HV/LV grid maintenance - Power failure HV/LV repairs - Off take management - 24 x 7 emergency service Solid IT background Implemented GIS containing detailed technical records of electricity distribution devices (VHV, HV and LV devices) SAP as a source of grid economic data GIS fully integrated with SAP (GIS is master) Frankfurt (Germany), 6-9 June 2011 Workforce management as tool for efficient grid services being implemented Grid services operation without IT support, workforce coordination done by daily orders Status 2008 Necessity to optimize and increase efficiency has led to implementation of work force management as of 2009 Content Pilot project finalization (in one region) Target asset: distribution transformer stations (MV/LV) 2nd phase 2011 Lessons learned / Expectation Basic processes setting Mobile devices experiences Project roll-out to all regions Target assets: MV-grid Interconnection WfM system with SCADA Standardization of MVmaintenance activities Higher data quality and actual data of MV-asset condition 3rd phase 2012 Project finalization Target assets: LVgrid + Metering Full operation of WfM system (all voltage levels) Systematic and fully standardized asset condition maintenance Reasonable allocation of financial means full operation of WfM at all voltage levels 1st phase 2009 - 2010 6 Frankfurt (Germany), 6-9 June 2011 Implementation of workforce management system as single system for grid operation and maintenance : IT platform - Primary systems SAP- ISU Off – takes management Grid operation and maintenance WfM based on IBM Maximo SCADA Outage management Real time operated Real time integrated with other systems IBM MAXIMO Grid Maintenance Despite complex IT implementation, go-live expected in 3Q 2011 VSE as innovative first mover in CEE 7 Frankfurt (Germany), 6-9 June 2011 Workforce management system as a top decision support system for MV/LV based on other systems in VSE IT pool 8 Frankfurt (Germany), 6-9 June 2011 WfM is integrated with important IT systems in real time SCADA (OMS) GIS GPS Archive server IBM Maximo Forms server SAP- PI SAP- PI HIFFI SYSTEM GSM networ k Mobile clients (tablets) SAP PM (ERP) SAP HR Attend. system implemented planned 9 Frankfurt (Germany), 6-9 June 2011 HIFFI project - status quo (31.05.2011) 2008 2009 2010 2011 2012 Time schedule of HIFFI project 1Q 2Q 3Q 4Q 1Q 2Q 3Q 4Q 1Q 2Q 3Q 4Q 1Q 2Q 3Q 4Q 1Q 2Q 3Q 4Q Project preparation: detail process analysis, definition of project goals, technical specification, tendering documentation etc. Procurement process Business Blueprint Business Blueprint approval 1st phase: Pilot project implementation (Region Humenné) 2nd phase: Testing of system funcionality (MV-grid+DTs) 2nd phase: Roll-out (MV-grid+DTs) 2nd phase: full operation (MV grid+DTs) 3rd phase: Business Blueprint (LV-grid+Metering) 3rd phase: Implementation (LV-grid+Metering) 3rd phase: Testing (LV-grid+Metering) 3rd phase: Go Live (LV-grid+Metering) 10 Frankfurt (Germany), 6-9 June 2011 Project HIFFI – example of benefits The grid operation organization before HIFFI Region „B“ Region „A“ Region „D“ Regions / 4 The organization having HIFFI Region „C“ x Regions / 1 Sub-Regions / 12x Operational Service Points / 26 x Sub-Regions / 8 x x Operational Service Points / 24 x