Financial UESC Case Studies Laws and Regulations That Influence Energy Conservation • Executive Order 13423, “Strengthening Federal Environmental, Energy, and Transportation Management” (January 24, 2007) • The Energy Policy Act (EPAct) 2005 • The Energy Independence and Security Act of 2007 (originally named the CLEAN Energy Act of 2007) • Agency Specific Regulations • The President’s $2,000,000,000.00 Challenge Proprietary Information Of Energy 2013 The UESC Process at SCE • Energy Efficiency and Renewable Energy Project Development and Management for Federal Customers • Free Preliminary Audits • Investment Grade Audits • Financing • Construction Management • Commissioning • M&V • Turn-Key Design/Bid/Build or Design/Build Proprietary Information Of Energy 2013 Past and Current Projects • • • • China Lake: Energy and Water Conservation GSA West Los Angeles: Parking Lot Lighting VA Long Beach: Interior and Exterior Lighting VA West Los Angeles: Lighting, HVAC Retrofits and Replacement, Steam Line Condensate Return, Energy Management and Building Automation Controls • Fort Irwin: Central Plant Upgrades with Chiller Replacements, Energy Management and Building Automation Controls • NASA Goldstone: Central Plant Upgrades with Chiller Replacements, Energy Management and Building Automation Controls for Some Very Big Antenna Arrays Proprietary Information Of Energy 2013 That’s a Big Antenna Proprietary Information Of Energy 2013 Energy Efficiency First • The Loading Order – Energy efficiency, demand response, renewables • First, make the facility as energy efficient as possible (equipment) • Second, implement a demand response program (behavioral) • Third, install Renewable Energy • The benefits of doing EE First • The facility uses less energy and the system can be smaller • More power can be sold into the market • This will simplify the facility’s microgrid and allow interconnection of the microgrid to an energy management system for total, real-time, control Proprietary Information Of Energy 2013 What Makes a Project Good • Building a good team – Contracting Officer Staff – Facility Staff – Utility Staff – Financing Partner • Listening to the Customer – Pain Points – Making Suggestions not Prescribing Solutions – Team Concurrence on all ECMs Proprietary Information Of Energy 2013 What Makes a Great Project • Building a Great Team – Contracting Officer Champion – Facility Staff Champion – Utility Staff Champion – Financing Partner Champion • Listening to the Customer – Pain Points – Making Suggestions not Prescribing Solutions – Concurrence of the Champions Proprietary Information Of Energy 2013 Performance Contracting • Measure and Develop a Baseline • Install the Right Equipment with the Right Contracting Team • Commission the Project • Retro-Commission Everything Else • Retro-Commission Everything a Year Later • Performance Verification Through Commissioning and Retro-Commissioning • There is No Savings Guarantee but if You Do Everything Right, the Savings Will be there and the Project will Perform for the Life of the Measures Proprietary Information Of Energy 2013 Phill’s Challenge • Don’t Be Diogenes, with a Lantern, Looking all Night for a Champion • Be the Champion Proprietary Information Of Energy 2013 Questions Phill Consiglio Federal Team Manager Southern California Edison Phillip.Consiglio@sce.com (626)633-7190 Proprietary Information Of Energy 2013