UESC Case Studies

advertisement
Financial
UESC Case
Studies
Laws and Regulations That Influence
Energy Conservation
• Executive Order 13423, “Strengthening Federal
Environmental, Energy, and Transportation
Management” (January 24, 2007)
• The Energy Policy Act (EPAct) 2005
• The Energy Independence and Security Act of 2007
(originally named the CLEAN Energy Act of 2007)
• Agency Specific Regulations
• The President’s $2,000,000,000.00 Challenge
Proprietary Information Of Energy 2013
The UESC Process at SCE
• Energy Efficiency and Renewable Energy Project Development
and Management for Federal Customers
• Free Preliminary Audits
• Investment Grade Audits
• Financing
• Construction Management
• Commissioning
• M&V
• Turn-Key Design/Bid/Build or Design/Build
Proprietary Information Of Energy 2013
Past and Current Projects
•
•
•
•
China Lake: Energy and Water Conservation
GSA West Los Angeles: Parking Lot Lighting
VA Long Beach: Interior and Exterior Lighting
VA West Los Angeles: Lighting, HVAC Retrofits and Replacement,
Steam Line Condensate Return, Energy Management and Building
Automation Controls
• Fort Irwin: Central Plant Upgrades with Chiller Replacements,
Energy Management and Building Automation Controls
• NASA Goldstone: Central Plant Upgrades with Chiller Replacements,
Energy Management and Building Automation Controls for Some
Very Big Antenna Arrays
Proprietary Information Of Energy 2013
That’s a Big Antenna
Proprietary Information Of Energy 2013
Energy Efficiency First
• The Loading Order
– Energy efficiency, demand response, renewables
• First, make the facility as energy efficient as possible
(equipment)
• Second, implement a demand response program
(behavioral)
• Third, install Renewable Energy
• The benefits of doing EE First
• The facility uses less energy and the system can be smaller
• More power can be sold into the market
• This will simplify the facility’s microgrid and allow
interconnection of the microgrid to an energy management
system for total, real-time, control
Proprietary Information Of Energy 2013
What Makes a Project Good
• Building a good team
– Contracting Officer Staff
– Facility Staff
– Utility Staff
– Financing Partner
• Listening to the Customer
– Pain Points
– Making Suggestions not Prescribing Solutions
– Team Concurrence on all ECMs
Proprietary Information Of Energy 2013
What Makes a Great Project
• Building a Great Team
– Contracting Officer Champion
– Facility Staff Champion
– Utility Staff Champion
– Financing Partner Champion
• Listening to the Customer
– Pain Points
– Making Suggestions not Prescribing Solutions
– Concurrence of the Champions
Proprietary Information Of Energy 2013
Performance Contracting
• Measure and Develop a Baseline
• Install the Right Equipment with the Right Contracting
Team
• Commission the Project
• Retro-Commission Everything Else
• Retro-Commission Everything a Year Later
• Performance Verification Through Commissioning and
Retro-Commissioning
• There is No Savings Guarantee but if You Do Everything
Right, the Savings Will be there and the Project will
Perform for the Life of the Measures
Proprietary Information Of Energy 2013
Phill’s Challenge
• Don’t Be Diogenes, with a Lantern, Looking all
Night for a Champion
• Be the Champion
Proprietary Information Of Energy 2013
Questions
Phill Consiglio
Federal Team Manager
Southern California Edison
Phillip.Consiglio@sce.com
(626)633-7190