“Why you don’t need to learn Japanese to become Lean” Kan Ban Kaizen Six Sigma Kan Ban Kaizen Six Sigma Custom Shop Lean Kan Ban Kaizen Six Sigma Custom Shop Lean Company Mindset, not “Rules” Kan Ban Kaizen Six Sigma Custom Shop Lean Company Mindset, not “Rules” “How Can We Do This Better?” Every Employee Every Task Every Day Sort through each work station. Sort through each work station. Set things in order. Sort through each work station. Set things in order. Shine and inspect. Sort through each work station. Set things in order. Shine and inspect. Standardize as much as practical. Sort through each work station. Set things in order. Shine and inspect. Standardize as much as practical. Sustain through inspection. A goal of 50% increase in production A goal of 50% increase in production Applying the 5S’s A goal of 50% increase in production Applying the 5S’s Low hanging fruit A goal of 50% increase in production Applying the 5S’s Low hanging fruit Central Tool room – Work station storage A goal of 50% increase in production Applying the 5S’s Low hanging fruit Central Tool room – Work station storage Repetitive task set-ups Change is frightening Change is frightening Be honest and clear Change is frightening Be honest and clear Engage key team members Change is frightening Be honest and clear Engage key team members Spread engagement to the entire staff Equipment condition Equipment condition Operator training Equipment condition Operator training Floor plan Equipment condition Operator training Floor plan Common tasks Equipment condition Operator training Floor plan Common tasks Follow the work flow No More Tape Measures! CNC programming changes No More Tape Measures! CNC programming changes Standardize hardware and construction No More Tape Measures! CNC programming changes Standardize hardware and construction Assembly receives “kits” No More Tape Measures! CNC programming changes Standardize hardware and construction Assembly receives “kits” Single unit batching Assembly begins immediately Assembly begins immediately Errors detected very early Assembly begins immediately Errors detected very early Material handling drastically reduced Assembly begins immediately Errors detected very early Material handling drastically reduced Maximize time flexibility Custom means being flexible Custom means being flexible Fast changes Custom means being flexible Fast changes Machines as well as work stations Constant review Constant review Use savings for capital equipment Constant review Use savings for capital equipment Due diligence- will it work with your evolving system? Feedback is needed to review changes Feedback is needed to review changes Honesty from top- down Feedback is needed to review changes Honesty from top- down Build confidence and trust among the team Feedback is needed to review changes Honesty from top- down Build confidence and trust among the team Confident team members feed back accurately Feedback is needed to review changes Honesty from top- down Build confidence and trust among the team Confident team members feed back accurately Communicate with EVERYONE Delegate tasks to the team Delegate tasks to the team Permission to “fail fast and cheap” Delegate tasks to the team Permission to “fail fast and cheap” Your office should be lean too Track Progress 1. What was prospected today? 2. What was conceptualized to move a project forward? 3. What was produced to move a project forward? 4. What was done that can be invoiced? 5. What distractions occurred today? Keep it Simple Search out waste: Wasted materials Wasted money Wasted time Ralph Bagnall www.consultingwoodworker.com