PHILADELPHIA’S I-95 CORRIDORWIDE SOIL MANAGEMENT A Beneficial Use Approach Pennsylvania Department of Transportation Engineering District 6-0 1 PROBLEM STATEMENT • Comply with PA’s Management of Fill Policy • Maximize Beneficial Reuse/Soil Balance • Minimize Soil-Handling Related Change Orders and Costs • Facilitate Health & Safety Planning 2 CONSTRUCTION PHASES • Cottman/Princeton Interchange (CPR) – 1.4 miles – 2 Construction Phases 2009- 3/2020 • Girard Avenue Interchange (GIR) – Ramps, Interchanges, Surface Streets, Trolly – 3 miles, 6 Construction Phases 2009-9/20 – Archeological, Stormwater, Lighting 3 CONSTRUCTION PHASES • Betsy Ross Bridge-Girard Ave. (AFC) – Highway and Bridges; 1.5 miles; 2 Phases 2016-2025 • Betsy Ross Bridge Interchange (BRI) – Bridge/Surface Street Interchange, .8 mile, 3 Phases 20142020 • Levick Street to Bridge Street (BSR) – Bridge & Interchange, 2.1 miles; 3 Phases 2016-2023 4 PROBLEMS AND RESOLUTION • Environmental Due Diligence…Eyes of the Beholder? – Publication 281 – Management of Fill – Receiving Parties Regulatory Historic Use Receiving Facility Analytical Suite 5 OTHER CONSIDERATIONS • • • • Entire Philadelphia Corridor is “Project Site” Underlying Fill Impacted by Historic Operations Consistent Due Diligence Post-Construction Open Space 6 SOIL MANAGEMENT • Considered One-Project Site – Facilitates Onsite Reuse • Consolidated Chemical Data in GIS Database – Statistical Interpretations Between Locations – Color-coded to Soil ‘Standards’ • Tracks Beneficial Reuse • Post-Construction Open Space 7 DATABASE DESIGN ELEMENTS • Consolidate Environmental Data – Multiple Design Sections • Intuitive – Ease of Use • Accessibility – Web-based • Dynamic – Data Input is Ongoing through 2023 8 GIS DATABASE FEATURES • Internet accessible • Unique Login by User/Entity • Graphic Presentation of: – Clean/Regulated Fill – Thickness of Fill – Existing/Finish Grade I-95 Soil Management – Beneficial Reuse – “Borrow” Areas 9 PRIMARY SCREEN 10 GIS DATABASE FEATURES 11 WHAT IS SHOWN POLYGONS ARE STATISTICAL EXTRAPOLATIONS POP-UP SUMMARY 12 GIS DATABASE FEATURES • Data Queries – Hits Above ‘Standards’ – Geographic-basis – Export in Excel 13 TAKE-AWAY • This is a Resource – Facilitates: • Agency Review /Acceptance • Pre- and In-Construction Decisions • This is a Tool – Everyone on the ‘same page’ – Accessible and Updated with Current Data • This is NOT Mandatory or End-All 14 PROJECT TEAM PENNSYLVANIA DEPT. OF TRANSPORTATION • John Clarke, PG 717-787-3085 • Elaine Elbich, PE 610-205-6846 • Charles Davies, Mark Radatti, Bob Eppley URS CORPORATION • Jeffrey Obrecht, PG 610-832-6190 • David Miller 610-832-6192 • Mike Shadle, Rob Miller 15