Licensing of Nuclear Power Plants in Pakistan MUHAMMAD RAHMAN Director (Directorate of Nuclear Safety) Pakistan Nuclear Regulatory Authority PNRA Licensing Basis Under section 20 of PNRA Ordinance, PNRA is empowered to grant authorization which states that “The Authority may, on application made to it accompanied by such information and documents, as may be prescribed by regulations, grant an authorization for carrying out of such activities as are specified in the authorization for such period as it may specify. Accordingly PNRA has established its regulatory framework for the licensing/authorization of nuclear installations named as “Regulations for Licensing of Nuclear Installation(s) in PakistanPAK/909”. 2 Regulated Facilities Nuclear Installations and Nuclear Grade Equipment Manufacturer Nuclear Medical Centers & Agriculture Research Centers PNRA X-Ray Machines , Diagnostic Radiology & Irradiators used for sterilization of medical equipment Industrial Radiography & Industrial applications of radiation PNRA Regulations Technical Regulations Regulations on Radiation Protection (PAK/904) Regulations on the Safety in NPP Site Evaluation (PAK/910) Regulations for the Safety of NPP Design (PAK/911) Regulations on the Safety of NPP Quality Assurance (PAK/912) Regulations on the Safety of NPP Operation (PAK/913) Regulations on Management of a Nuclear or Radiological Emergency (PAK/914 ) Regulations on Radioactive Waste Management (PAK/915) Regulations for the Safe Transport of Radioactive Material (PAK/916) PNRA Regulations Administrative Regulations Regulations on Licensing Fee (PAK/900) Regulations for Licensing of Nuclear Installations (PAK/909) Regulations for Licensing of NPP Equipment Manufacturers (PAK/907) Regulations for Licensing of Radiation Facilities other than Nuclear Installations (PAK/908) PNRA Enforcement Regulations (PAK/950) Licensing Stages for Nuclear Power Plants Closure/ Site Removal from Regulatory Control Registration Construction Licence Control Authorization for Decommissioning PNRA Licensing Stages Permission for Commissioning Loading of nuclear material in the system Licence Revalidation Annual Operating Renewal Licence 6 Applicable Nuclear Safety and Security Standards All nuclear installations, for the purposes of siting, design, construction, commissioning, operation and decommissioning/closure, shall conform to the existing PNRA regulations. In areas where the PNRA regulations are not available, relevant latest US Nuclear Regulatory Commission regulations shall be deemed to be applicable. Alternately, the licensee may choose to follow the latest revisions of the applicable IAEA Safety and Security Standards. In case the nuclear safety and security standards of another country are proposed to be followed, the applicant/licensee shall demonstrate to the entire satisfaction of the Authority that the standards, proposed to be followed, offer the same or better standards of safety, security, quality and reliability than would have been offered by the nuclear safety and security standards mentioned above. 7 Design and Safety Criteria The licensee is required to establish design and safety criteria and obtain PNRA approval Comprising a list of standards and practices to be followed such as o Requirements to be followed (Regulations, IAEA Nuclear Safety Standards, 10CFR, etc.) o Regulatory and Safety Guides (PNRA, IAEA, NRC) o Industrial Codes and Standards (International) o Experience Feedback & Practices to be followed 8 Licensing Stages & Submission Requirements Site Registration Application Site Evaluation Report (SER) No Objection Certificates (NOC) from relevant government departments Quality Assurance Program for Siting Construction License Permission for Commissioning Preliminary Safety Analysis Report (PSAR) Commissioning Program Design PSA of full power internal initiating events (for NPPs only) Quality Assurance Program for Commissioning Phase Quality Assurance Program for design and construction phases Licensing Stages & Submission Requirements Permission to Introduce Nuclear Material (FLP) FSAR QAP for Operation Physical protection program Radioactive waste management program Emergency Preparedness Plans Initial decommissioning plan Environmental monitoring program Radiation protection program PSA Level-1 PSI/ISI program Operating License Revalidation of (OL) operating license Result of Commissioning tests Update of all documents submitted for FLP Latest reports of periodic safety review (PSR) Licensing Stages & Submission Requirements Licensing Beyond Design Life Latest Periodic Review reports Update of all sub-missions for OL of Safety licensing required PSA Level 1 Plus based on actual plant data (for NPPs only) Decommissioning Program License for Decommissioning Or Closure Removal from Regulatory Control Final decommissioning Plan Decommissioning completion report Radioactive waste management program Technical specifications during decommissioning Physical protection program Environmental monitoring program Radiation protection program Emergency Preparedness Plan (EPP) Final radiological survey report Licensing Process Submission of Safety Case Safety Regulations Review & Assessment Yes License Conditions Case Acceptable No Inputs from inspections Comments sent Inputs of consultants Responses received Issuance of Authorization Regulatory Position prepared Actions taken and reports submitted Conduct of Review Meetings Actions identified Yes No Issues Resolved Regulatory Oversight During Different Phases PNRA has established a well defined Regulatory Oversight Process which will be effectively used during different phases/stages of nuclear installation. For the assessment and analysis of documents submitted by licensee during different phases of nuclear installation as regulatory requirement are subjected to the process of review and assessment and results of these review & assessment are being followed-up, documented and recorded for regulatory compliance during all phases of nuclear installation. Similarly, inspection & enforcement are carried out to ensure compliance with the national regulations, licence and licensing conditions, and commitments made by the applicant/licensee for the safety of nuclear power plants. 13 Regulatory Inspections Manufacturing Inspectors ensures Construction Inspection Program Commissioning Conformity with the actual conditions Compliance with • PNRA regulations • Licensing submissions • Terms and conditions of the license Operation Includes third party inspections and inspections at manufacturing works Decommissioning Conclusion PNRA Licensing process is quite effective and is in accordance with international standards. PNRA always believe on proven technology and processes. So for PNRA issued Operating Licenses to three operational NPPs. Two construction licenses has been issued to two NPPs. 15 THANK YOU 16