1 Reducing THM via Aeration: A Case Study November 21, 2013 by Gary Williams, P.E. Jones & Henry Engineers Southeast AWWA District Meeting Agenda 2 Location History Pilot Implementation Take Away Information Location Map 3 4 Distribution System Map 5 Water Quality 2008 6 Raw Water Total Hardness 285 mg/L as CaCO3 Total Alkalinity 133 mg/L as CaCO3 pH 8.2 Turbidity 3.2 Total Organic Carbon 4.5 mg/L Finished Water Total Hardness 150 mg/L as CaCO3 Total Alkalinity 36 mg/L as CaCO3 pH 9.2 Total Organic Carbon (average) 2.1 mg/L TOC Removal (average) 51% THM 2008 7 Total Trihalomethane & HAA5 2007/2008 Date of Sample Location Sample 5/24/2007 RD002 RD003 MR002 7/10/2007 RD002 RD003 MR002 10/11/2007 RD002 RD003 MR002 1/16/2008 RD002 RD003 MR002 4/2/2008 RD002 RD003 MR002 7/8/2008 RD002 RD003 MR002 10/9/2008 RD002 RD003 MR002 Second Quarter 2007 Average RAA 38.9 40.8 50.2 43.3 47.8 Thrid Quarter 2007 82.3 85.3 102.0 89.9 50.4 Fourth Quarter 2007 54.1 58.3 81.7 64.7 58.1 First Quarter 2008 40.6 40.7 54.9 45.4 60.8 Second Quarter 2008 40.5 40.6 60.3 47.1 61.8 Third Quarter 2008 85.1 85.3 131.0 100.5 64.4 Fourth Quarter 2008 52.0 55.7 80.6 62.8 63.9 MR002 LRAA HAA5 Average RAA 59.3 13.4 14.4 11.8 13.2 17.8 60.6 16.6 15.2 16.7 16.2 14.4 69.3 17.3 16.4 22.0 18.6 15.9 72.2 19.3 20.8 20.4 20.2 17.0 74.7 13.6 13.1 14.2 13.6 17.1 82.0 33.1 32.1 34.7 33.3 21.4 81.7 28.8 28.8 33.3 30.3 24.4 Water History 8 1972 Water Treatment Plant, Low Head Dam, and Reservoir Constructed 1993 Water Treatment Plant Study 1996 Reservoir Study 1999-2000 Water Treatment Plant Expansion $3,000,000 2002 Second Reservoir $2,300,000 2004 Water Distribution System DBP Reduction Study 2005 Chlorine Dioxide Benchtop Study 2005 MIEX Benchtop Study 2006 RSSCT for GAC Benchtop Study 2008 THM Reduction via Aeration Opflow Article 2008 THM Reduction via Aeration Opflow Article 9 Research 10 Limited Research Available for Dynamic System One Company Marketed a System $$$$$$$$ Air : Water Ratios (cfm : gpm) 5 to 60 If A:W = 40 and processing water @ 700 gpm = 28,000 cfm blower Approximately 200 hp Blower Pilot 11 Assumed 20:1 A:W ratio or 14,000 cfm Determined Approximate Area Diffusors for 14,000 cfm in Clearwell 2 Assumed One/half Depth of Clearwell or 7 feet Calculated the Volume over the Diffusors Developed the Detention Times in the Three Celled Clearwell Influent Cell Aeration Cell Effluent Cell 60 minutes 75 minutes 60 minutes Scaled down the flows of air and water to match a 4-inch PVC pipe Pilot 12 Test Pipe Arrangement 13 Pilot Air Requirements Air: Water Ratio Required (cfm) Total Air (cf) 2:1 0.1 9.5 5:1 0.25 23.8 10:1 0.5 47.5 20:1 1.0 95 Pilot Protocol 14 Two Pilot Steps First Step Test Entire A:W Range Second Step Optimize Results of the First Step Goal was to Optimize Air Required Parameters Tested TOC THM HAA5 Chlorine Residual Stability pH Total Alkalinity Total Hardness Calcium Hardness TDS Chlorides Sulphates Pilot Results 15 Air: Water Ratio Control 2:1 5:1 7:1 10:1 20:1 30:1 40:1 50:1 Air Rate (scfm) N/A 0.10 0.25 0.35 0.50 1.00 1.50 2.00 2.50 Trihalomethane Results (ug/L) October 14 November 11 47.1 38.0 16.9 16.7 5.7 9.0 N/A 6.7 2.1 5.7 2.7 2.6 3.0 2.1 Pilot Results Trihalomethanes (ug/L) 16 50.0 45.0 40.0 35.0 30.0 25.0 20.0 15.0 10.0 5.0 0.0 October 14 November 11 0 5 10 15 20 25 30 35 40 45 50 55 Air to Water Ratio Other Pilot Results 17 Temperature October 16 deg C November 12 deg C Control Sample (no aeration) TTHM Initial – 52.6 ug/L Finish – 47.1 ug/L pH Initial – 9.3 Aerated – 7.9 Cl2 Free mg/L Initial – 2.13 Aerated – 1.96 Cl2 Total mg/L Initial – 2.45 Aerated – 1.19 @ A:W ratio > 10:1 CHBrCl2, CHBr2Cl, CHB3 below Detectable Limit Project Costs 18 Aeration System 5:1 A:W ratio 3,500 scfm Blower Stainless Steel Diffusors Caustic Soda Feed System to increase pH to 8.9 12-inch Air Piping to Clearwell Diffusors Electric and Controls Project Cost - $401,700 Annual O&M - $73,000 GAC System Project Cost - $1,225,600 Annual O&M - $145,000 Brand X 19 2011 SolarBee Aeration System Proposal Two 15 HP Blowers 580 scfm Each Three Submersible Mixers 86 Diffusor Assemblies Caustic Soda Feed System to increase pH to 8.9 8-inch Air Piping to Clearwell Diffusors Electric and Controls Project Cost - $571,700 Annual O&M - $21,000 SolarBee Offer Install Clearwell Equipment Provide Temporary Blower and Piping 6-month Trial If Satisfied, Purchase Price $360,000 20 Second Thoughts 21 April 1, 2012 SolarBee Oops Further Testing Showed Spray Aeration Preferable Highly Recommended Spray System One GS-12 Submersible Mixer in Clearwell 1 Two SN-15 Floating 15 HP Pump/Mixer/Spray Systems Two Ventilation 2HP Blowers 750 scfm Each Caustic Soda Feed System to increase pH to 8.9 12-inch Air Piping to Clearwell Electric and Controls Project Cost - $369,900 Annual O&M - $22,000 SolarBee Offer Provide In-Clearwell Equipment and Two Blowers Install Clearwell Equipment 6-month Trial If Satisfied, Purchase Price $168,000 22 Schedule 23 Bid – October 2012 Preconstruction Meeting – November 2012 Substantial Completion – March 2013 Total Completion – June 2013 TTHM Summary 24 (all values TTHM in ppb, except where noted) Sample Date Water Temp Clearwell 1 (deg C) Effluent Clearwell 2 DS202 % Removal In Regrowth in Effluent (Max TTHM) Clearwell #2 System 4/3/2013 7 29.6 18.4 31.8 38% 13.4 5/6/2013 15 47.2 20.4 43.4 57% 23.0 5/20/2013 18 56.2 24.8 64.7 56% 39.9 6/17/2013 22 62.7 21.2 62.3 66% 41.1 7/1/2013 24 63.2 30.7 64.7 51% 34.0 8/13/2013 23 53.3 20.3 52.1 62% 31.8 9/9/2013 20 56.0 20.5 52.6 63% 32.1 Note: Baffle wall opening sealed on 4/12/2013 Maximum Residence Time Running Annual Average 25 100.0 90.0 80.0 70.0 60.0 50.0 TTHM (ppb) HAA5 (ppb) 40.0 30.0 20.0 10.0 0.0 First Second Third 2011 Fourth First Second Third 2012 Fourth First Second Third 2013 Fourth Take Away Information 26 THMs Have to be Formed 1. 2. 3. 4. 5. Aeration Does Not Reduce Formation Potential Chloroform is Typical Target THM Powered Air Supply for Ventilation Probably Required Check pH/Stability Check Chlorine Residual