UNCLASSIFIED POM-17 Marine Corps Capabilities Analysis • Objective – Identify current and future capability requirements, including tasks along with their associated conditions and performance standards that are necessary to execute Expeditionary Force 21. • Inputs: – Guidance (Expeditionary Force 21) – Marine Corps CBA Wargame (Scenario and CONOPS) – Previous MCCL (POM-16) • Outputs: – Updated MCCL – Capability Requirements (Tasks, Conditions, Standards) • Gap Analysis – Similar to the capabilities review process, a series of Gap Review Working Groups (organized by JCA) will be conducted April-May 2014 to review and update (as required) the Marine Corps Gap List (MCGL). UNCLASSIFIED//For Official Use Only/Pre-Decisional 1 UNCLASSIFIED Top Ten Capabilities With Associated Programs • 3.1 Maneuver Forces (ACV, AAV, MPC, JLTV, Family of Raid/Reconnaissance Equipment) • 1.2 Force Preparation (Ground Based Air Defense - Transformation) • 5.5 Direct Execution (Ground/Air Task Order Radar (G/ATOR), AN/TPS 59/63 mods) • 4.1 Provide Deployment and Distribution Support (MPC, JLTV, MTVR, Family of Trailers) • 5.2 Understand (GCCS-MC, CAC2S, RQ-21A UAS, G/ATOR, MAGTF C2) • 5.1 Organize (G-BOSS, TLDHS, WFVPS, MARCIM, JSTARS) • 5.2 Conduct Planning (MAGTF C2, CAC2S, AFATDS, TBMCS) • 6.1 Transport Information (DDS-M, AIT, LMST, SMART-T, CAC2S, NOTM) • 3.2 Engage Targets (G/ATOR, AFATDS, MCIOC, USMC CREW Systems) • 2.1 Plan and Direct Intelligence Operations (MAGTF C2, GCSS-MC, Special Intelligence Program, UAS Sensor Payloads) UNCLASSIFIED//For Official Use Only/Pre-Decisional 2 UNCLASSIFIED ACV History High Water Speed Possible But at a Cost: $12-14 Million Per Vehicle Initial Operating Capability 2022 New Technology – Program Risk Not Optimized for 90% of Mission • Initial Requirement for High Water Speed 1013 (12 BNs of lift) • 2011 EFV Cancelled...Cost and Operational Effectiveness • Land Operations Force Protection at least 1X Limited Growth Potential • Avg Growth 20-25% • 2012 Established a Cross Functional Project Office to Look at ACV Options High Fuel Consumption at Sea • 26 Years and 3 Billion Dollars Later Less Than Acceptable Reliability Time for a Revised Acquisition Strategy UNCLASSIFIED//For Official Use Only/Pre-Decisional 3 UNCLASSIFIED Littoral Maneuver Threat Assessment • Threat ISR and proliferation have changed standoff requirements. • Crisis response is come as you are w/limited ability to conduct shaping. • Complications of ASBM and CDCM defense place demands on DDG / CG capacity to protect the amphib force • The ability to close amphibious ships to 1-2 nm or even 12 nm in an area denial environment requires defeat of CDCM and escort to defeat leakers. 300 nm + ASBM; Sky Wave Radar 165 nm ASCM; Early Warning Radar 65nm C802 25 nm Coastal Radar <10.8 nm ASCM; AAA, Air Def; Mines; Small Boat; GRAMM UNCLASSIFIED//For Official Use Only/Pre-Decisional UNCLASSIFIED ACV Concept of Employment Protected Mobility (2X) for Infantry and attached Marines and Sailors Lethality to support dismounted infantry and defend the vehicle with precision fires. Maneuver in complex terrain – congested, urban, on/off road River-crossing/shore-to-shore, near-shore launch from connectors C2 to support distributed operations • One ACV-equipped AA Company provides armored lift for one Infantry Battalion. • Two vehicles carry a reinforced rifle squad with full combat load and 2x DOS • Two vehicles can act as a base of fire and maneuver element (over-watch / traveling – over-watch capable) • Crew member tasks: Vehicle command, operation/maintenance, precision gunnery • Mission Role Variants will support C2 and Logistics/Recovery requirements UNCLASSIFIED//For Official Use Only/Pre-Decisional UNCLASSIFIED Amphibious Vehicle Replacement Strategy Key Considerations Proposed Acquisition Objectives • Must acquire a “Family of Systems” to accomplish the mission (IOC FY 19 to ~ 35) AAV Survivability Upgrade and Sustainment Purchase Non-Developmental ACV (Personnel Variant) ACV Mission Role Variants (C2, Log, other) 392 • High Water Speed is achievable in the near term via connectors 204 • No changes to current Amphibious Shipbuilding Plan 490 • No change to currently programmed connectors Potential Competitors BAE/IVECO GDLS SAIC / TERREX UNCLASSIFIED//For Official Use Only/Pre-Decisional • Vehicle Squared is a finite resource (Amphibs, MPSRON, connectors) Lockheed Martin/Patria Connector Strategy Work closely with our Naval partners on the next generation of surface connectors. UNCLASSIFIED Combat & Tactical Vehicle Roadmap 12 Age 13 14 15 16 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 17 1 2 3 4 18 19 20 1 2 3 4 1 2 3 4 1 2 3 4 21 22 1 2 3 4 1 2 3 4 23 24 1 2 3 4 1 2 3 4 25 26 1 2 3 4 1 2 3 4 27 28 29 30 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 31 32 1 2 3 4 1 2 3 4 IOC 1972 AAV (1,058) RAM/RS IOC 1998 FOC 2007 42 AAV Survivability Upgrade IOC 2019 (392 Total) FOC 2023 ACV 1.1 (204) IOC 2020 IOC LAV (925) 1983 ACV 1.2 (490) FOC 2023 ACV Phase 2 2035 LAV: IOC 1983 FOC 1988 / LAVA1/SLEP: 1995-2010 / LAV-A2/SLEP: 2006-2010 LAV-AT Modernization: IOC 2017 FOC 2019 2035 31 IOC 2018 JLTV (5,500) IOC 2018 FOC 2022 2,775 in FYDP 2030 HMMWV A2 / ECV (12,364) 16 7 A2:1998 ECV:2004 HMMWV Sustainment Modification Initiative (1,800 of 6,851in PB-15) MRAP (2,510) 2020 7 UNCLASSIFIED//For Official Use Only/Pre-Decisional 2035 UNCLASSIFIED Connectors Way Ahead • Publish Broad Area Announcement: – Initiate engineering change proposals & solicit white papers – Assess feasibility – Conduct EF-21 ship to shore movement analysis • Near Term Engineering Change Proposals: – LCAC/SSC launch capability for ACV/AAV – Joint High Speed Vessel (JHSV) Sea State 3 ramp – JHSV launch capability for ACV/AAV • Near Term Enhancements: – Lightweight Modular Causeway System – Roll-on Roll-off Discharge Facility/LCAC Interface – Flexible Seabase Force Projection – Improved Navy Lighterage System/Mobile Landing Platform interface – Improved LCAC lashing systems – LCAC/SSC “station” concept • Long Term: – Identify leap-ahead “Connector After Next” ideas, designs & technologies UNCLASSIFIED//For Official Use Only/Pre-Decisional 8 UNCLASSIFIED Connectors - Near Term UNCLASSIFIED//For Official Use Only/Pre-Decisional 9 UNCLASSIFIED UNCLASSIFIED//For Official Use Only/Pre-Decisional 10