Brigadier General William F. Mullen III

advertisement
UNCLASSIFIED
POM-17 Marine Corps
Capabilities Analysis
• Objective
– Identify current and future capability requirements, including tasks along with their
associated conditions and performance standards that are necessary to execute
Expeditionary Force 21.
• Inputs:
– Guidance (Expeditionary Force 21)
– Marine Corps CBA Wargame (Scenario and CONOPS)
– Previous MCCL (POM-16)
• Outputs:
– Updated MCCL
– Capability Requirements (Tasks, Conditions, Standards)
• Gap Analysis
– Similar to the capabilities review process, a series of Gap Review Working
Groups (organized by JCA) will be conducted April-May 2014 to review and
update (as required) the Marine Corps Gap List (MCGL).
UNCLASSIFIED//For Official Use Only/Pre-Decisional
1
UNCLASSIFIED
Top Ten Capabilities With
Associated Programs
•
3.1 Maneuver Forces (ACV, AAV, MPC, JLTV, Family of Raid/Reconnaissance
Equipment)
•
1.2 Force Preparation (Ground Based Air Defense - Transformation)
•
5.5 Direct Execution (Ground/Air Task Order Radar (G/ATOR), AN/TPS 59/63 mods)
•
4.1 Provide Deployment and Distribution Support (MPC, JLTV, MTVR, Family of Trailers)
•
5.2 Understand (GCCS-MC, CAC2S, RQ-21A UAS, G/ATOR, MAGTF C2)
•
5.1 Organize (G-BOSS, TLDHS, WFVPS, MARCIM, JSTARS)
•
5.2 Conduct Planning (MAGTF C2, CAC2S, AFATDS, TBMCS)
•
6.1 Transport Information (DDS-M, AIT, LMST, SMART-T, CAC2S, NOTM)
•
3.2 Engage Targets (G/ATOR, AFATDS, MCIOC, USMC CREW Systems)
•
2.1 Plan and Direct Intelligence Operations (MAGTF C2, GCSS-MC, Special Intelligence
Program, UAS Sensor Payloads)
UNCLASSIFIED//For Official Use Only/Pre-Decisional
2
UNCLASSIFIED
ACV History
High Water Speed Possible
But at a Cost:
 $12-14 Million Per Vehicle
 Initial Operating Capability
2022
 New Technology – Program Risk
 Not Optimized for 90% of Mission
•
Initial Requirement for High Water
Speed 1013 (12 BNs of lift)
• 2011 EFV Cancelled...Cost and
Operational Effectiveness
• Land Operations
 Force Protection at least 1X
 Limited Growth Potential
• Avg Growth 20-25%
• 2012 Established a Cross Functional
Project Office to Look at ACV Options
 High Fuel Consumption at Sea
• 26 Years and 3 Billion Dollars Later
 Less Than Acceptable Reliability
Time for a Revised Acquisition Strategy
UNCLASSIFIED//For Official Use Only/Pre-Decisional
3
UNCLASSIFIED
Littoral Maneuver
Threat Assessment
• Threat ISR and
proliferation have changed
standoff requirements.
• Crisis response is come
as you are w/limited ability
to conduct shaping.
• Complications of ASBM
and CDCM defense place
demands on DDG / CG
capacity to protect the
amphib force
• The ability to close
amphibious ships to 1-2
nm or even 12 nm in an
area denial environment
requires defeat of CDCM
and escort to defeat
leakers.
300 nm + ASBM;
Sky Wave Radar
165 nm ASCM;
Early Warning Radar
65nm C802
25 nm
Coastal Radar
<10.8 nm
ASCM; AAA, Air Def;
Mines; Small Boat;
GRAMM
UNCLASSIFIED//For Official Use Only/Pre-Decisional
UNCLASSIFIED
ACV Concept of Employment
 Protected Mobility (2X) for Infantry
and attached Marines and Sailors
 Lethality to support dismounted
infantry and defend the vehicle with
precision fires.
 Maneuver in complex terrain –
congested, urban, on/off road
 River-crossing/shore-to-shore,
near-shore launch from connectors
 C2 to support distributed operations
• One ACV-equipped AA Company provides armored lift for one Infantry Battalion.
• Two vehicles carry a reinforced rifle squad with full combat load and 2x DOS
• Two vehicles can act as a base of fire and maneuver element (over-watch / traveling
– over-watch capable)
• Crew member tasks: Vehicle command, operation/maintenance, precision gunnery
• Mission Role Variants will support C2 and Logistics/Recovery requirements
UNCLASSIFIED//For Official Use Only/Pre-Decisional
UNCLASSIFIED
Amphibious Vehicle
Replacement Strategy
Key Considerations
Proposed Acquisition Objectives
• Must acquire a “Family of
Systems” to accomplish the mission
(IOC FY 19 to ~ 35)
AAV Survivability Upgrade
and Sustainment
Purchase Non-Developmental
ACV (Personnel Variant)
ACV Mission Role Variants
(C2, Log, other)
392
• High Water Speed is achievable in
the near term via connectors
204
• No changes to current Amphibious
Shipbuilding Plan
490
• No change to currently
programmed connectors
Potential Competitors
BAE/IVECO
GDLS
SAIC /
TERREX
UNCLASSIFIED//For Official Use Only/Pre-Decisional
• Vehicle Squared is a finite resource
(Amphibs, MPSRON, connectors)
Lockheed
Martin/Patria
Connector Strategy
Work closely with our
Naval partners on the
next generation of
surface connectors.
UNCLASSIFIED
Combat & Tactical Vehicle Roadmap
12
Age
13
14
15
16
1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4
17
1 2 3 4
18
19
20
1 2 3 4 1 2 3 4 1 2 3 4
21
22
1 2 3 4
1 2 3 4
23
24
1 2 3 4 1 2 3 4
25
26
1 2 3 4
1 2 3 4
27
28
29
30
1 2 3 4 1 2 3 4 1 2 3 4
1 2 3 4
31
32
1 2 3 4 1 2 3 4
IOC
1972 AAV (1,058)
RAM/RS IOC 1998 FOC 2007
42
AAV
Survivability Upgrade
IOC 2019
(392 Total)
FOC 2023
ACV 1.1 (204)
IOC 2020
IOC LAV (925)
1983
ACV 1.2
(490)
FOC 2023
ACV
Phase 2
2035
LAV: IOC 1983 FOC 1988 / LAVA1/SLEP: 1995-2010 / LAV-A2/SLEP: 2006-2010
LAV-AT Modernization: IOC 2017 FOC 2019
2035
31
IOC
2018
JLTV (5,500)
IOC 2018 FOC 2022
2,775 in FYDP
2030
HMMWV A2 / ECV (12,364)
16
7
A2:1998
ECV:2004
HMMWV Sustainment Modification Initiative (1,800 of 6,851in PB-15)
MRAP (2,510)
2020
7
UNCLASSIFIED//For Official Use Only/Pre-Decisional
2035
UNCLASSIFIED
Connectors Way Ahead
•
Publish Broad Area Announcement:
– Initiate engineering change proposals & solicit white
papers
– Assess feasibility
– Conduct EF-21 ship to shore movement analysis
•
Near Term Engineering Change Proposals:
– LCAC/SSC launch capability for ACV/AAV
– Joint High Speed Vessel (JHSV) Sea State 3 ramp
– JHSV launch capability for ACV/AAV
•
Near Term Enhancements:
– Lightweight Modular Causeway System
– Roll-on Roll-off Discharge Facility/LCAC Interface
– Flexible Seabase Force Projection
– Improved Navy Lighterage System/Mobile Landing
Platform interface
– Improved LCAC lashing systems
– LCAC/SSC “station” concept
•
Long Term:
– Identify leap-ahead “Connector After Next” ideas,
designs & technologies
UNCLASSIFIED//For Official Use Only/Pre-Decisional
8
UNCLASSIFIED
Connectors - Near Term
UNCLASSIFIED//For Official Use Only/Pre-Decisional
9
UNCLASSIFIED
UNCLASSIFIED//For Official Use Only/Pre-Decisional
10
Download