ITK Car Rental Inc.

advertisement
ITK Car Rental Inc.
Team Members:
Billy Lim (Project Manager)
Jane Doe (System Analyst)
Etc.
Table of Contents
• Milestone 1 ………………………..…..…………………..... p. 1
–
–
–
–
–
–
–
–
Project Charter ………..……………………………….….. p. x
Stakeholder Analysis ……………...……………………... p. x
Summary List of Essential Use Cases …………………. p. x
Use Cases and Preliminary User Interfaces
• Logon …………………………………………………... p. x
• Etc.
Work Breakdown Structure ………………………………. p. x
Project Schedule/Timeline ….……………………………. p. x
Project Risk and Feasibility ………………………………. p. x
Environment ………………….……………………………. p. x
• Milestone 2 …
Milestone 1
Project Charter
•
•
•
•
Need
Objective
Benefits
System Capabilities
Stakeholder Analysis
Summary List of Use Cases
1.
2.
3.
4.
5.
6.
7.
8.
9.
Log onto the System
Involves setting a cookie
Remember User Signon
Make Vehicle Reservation
Release Vehicle
Return Vehicle
Process Customer Feedback
Customer wants to extend rental period
…
Log off the System
Wrong format! Instead, say:
“Adjust Rental Period”
This is the right format and it is more
generic (allows one to extend or cut short
(with penalty perhaps) a rental)
1. Log onto the System
• Summary
–…
•
•
•
•
•
Actors
Preconditions
(“Sunny Day”) Descriptions
(“Rainy Day”) Exceptions
Postconditions
User Interface for
“Log onto the System”
ITK
Logon
2. Remember User Signon
• Summary
–…
•
•
•
•
•
Actors
Preconditions
(“Sunny Day”) Descriptions
(“Rainy Day”) Exceptions
Postconditions
User Interface for
“Remember User Signon”
ITK
If checked,
cookie is set
on this machine.
Work Breakdown Structure
• Refer to Figure 3-10
Project Schedule/Timeline
• Tasks with timeline
Project Risk and Feasibility
• Address all the risk and feasibilities issues
– Risk to project
– Feasibilities
•
•
•
•
•
Organizational and Cultural
Technological
Schedule
Resource
Economic
Environment
• Tools
• Technologies