SESAR Deployment

advertisement
SESAR
Deployment
2014 CEF Transport Info Day
Brussels, 10 October 2014
Presented by Marco De Sciscio
European Commission's Single European Sky Unit
First CEF-Transport call for proposals
Priority – "Single European Sky – SESAR"
 Overview of the Single European Sky (SES)
 Main aspects of the SESAR Project
 Recent developments – SESAR Deployment
2
The Single European Sky
Enhancing European ATM performance
Increase current capacity X 3
Increase safety by a factor of 10
Reduce the environmental impact
by 10% per flight
Reduce ATM costs by 50%
The Single European Sky
& its implementing instruments
Industry Consultation Body
Performance
Safety
Single Sky Committee
Technology
Airports
Human factor
Airport observatory
Performance scheme
EASA
Crisis coord. cell
SESAR
Performance Review Body
Functional Airspace Blocks
Network Manager
National Supervisory Authorities
ATM Master plan
SESAR Joint Undertaking
Common projects
Deployment governance
Deployment Programme
Specific sectoral
dialogue Committee
Consultative expert group
on social dimension
of the SES
SESAR cycle
SESAR definition
ATM Master plan
Development &
validation
Deployment
SESAR deployment framework
SESAR definition
The European ATM Master plan is SESAR's roadmap
for driving European ATM modernisation
6
SESAR development
7
SESAR development
SESAR Solutions
• Operational & technological improvements developed by the
SESAR partnership in six key operational improvement areas
• Solutions are validated through the SESAR Release process,
demonstrated through Large scale demonstrations &
documented in "Solution packs"
SESAR benefits
Deployed according to
ATM Master plan
Unsynchronised
deployment
10 year
delay
The Pilot Common Project
Cumulative
impact on EU GDP
Jobs created
EUR 419 billion
328 000
-28%
- 30%
-22%
CO2 saved
50 million tons
- 58%
-70%
Source: Study on the macro-economic impact of SESAR, SESAR Joint Undertaking, June 2011
- 110%
SESAR deployment
SESAR Deployment framework
 Common Projects
 Deployment Governance
o
o
o
Policy: European Commission
Management: Deployment Manager
Implementation: SESAR Framework partnership
 Deployment Programme
 Implementation Projects
 Targeted incentives
Regulation (EU) No 409/2013
SESAR deployment
Common Projects
“what, where, who & when”
Identify & mandate deployment of ATM functionalities that:
•
Contribute to achieving the
ATM Master plan's essential operational changes
•
Are mature enough for implementation
•
Require a synchronised deployment
SESAR deployment
SESAR Deployment governance (& Partnership)
European Commission
Common Projects
INEA
Eurocae & ESOs
Deployment Manager
Coordinating partners
Implementing partners
SESAR Deployment
framework partnership
SESAR deployment
Deployment Programme
& Implementation Projects
Detailed & structured planning
of all deployment activities (implementation projects)
necessary to implement Common Projects
ATM Master Plan
Planning view
Common Project
Business view
Deployment Programme
Project view
P1
P2
…
Pn
Implementation Projects
13
SESAR deployment
Incentives
EU financial support (CEF) for SESAR deployment
shall focus on Implementation Projects
Other incentives will be defined or activated
through the relevant instruments
14
SESAR deployment
SESAR deployment
sequence
CEF incentives
SESAR deployment
Activating deployment instruments
The Pilot Common Project
An initial set of 6 essential
ATM functionalities demonstrating
readiness for synchronised
deployment
Regulation (EU) No 716/2014
The Pilot Common Project
PCP ATM functionalities (SESAR solutions)
1
Critical network
performance
deficiencies
Building future
ATM infrastructure
2
Extended AMAN &
PBN in high density TMAs
Airport
Airport Integration
Integration &
&
Throughput
Throughput Functionalities
Functionalities
3
Flexible Airspace
Airspace Management
Management &
& Free
Flexible
Route
Free Route
4
Network Collaborative Management
5
Initial (i)SWIM
6
Initial Trajectory Information
Sharing
ATM Master Plan
key improvement areas
The Pilot Common Project
Expected PCP benefits
EUR 4.9 Billion in performance gains
(ex. 5 % delay cost savings)
66% reduction of fuel burn
EUR 0.8 billion (6%) CO2 credit savings
23% Air navigation services productivity
SESAR deployment
Activating deployment instruments
Setting up the
SESAR Deployment framework partnership
• Select initial implementation partners that will constitute the
Implementation level
• Designate the coordinating partners that will constitute the
Deployment Manager & the Framework Partnership coordinator
• Develop an initial deployment programme for the most "mature"
implementation projects to implement the Pilot Common project
Activation of the call's category (a) Implementation projects
19
Conclusions
Single European Sky
Reform ATM to enhance performance
(3x Capacity, 10x Safety, -10% impact on environment, -50% ATM costs)
Institutional (EASA, ECTL, NSA, NM, FAB, etc.)
Technological pillar
SESAR
ATM Master Plan defines
H2020
SESAR Concept
SESAR Joint Undertaking
develops/validates/demonstrates
SESAR solutions
(essential/mature/synchro)
Common Projects
SESAR Deployment
framework
Deployment Manager
Deployment Programme
Implementation projects
CEF
Call ctg. (a)
CEF
Call ctg. (b)
Moving the Single European Sky forward
More information at:
► www.ec.europa.eu/transport/modes/air/sesar/deployment_en.htm
► www.eurocontrol.int/sesar-research
► www.sesarju.eu