SINGLE EUROPEAN SKY versus NEXTGEN (US) FROM A REGULATORY PERSPECTIVE Ian Middleton, Deputy Director EUROCONTROL - Directorate Single Sky Amsterdam, 27 April 2012 The European Organisation for the Safety of Air Navigation Agenda • The challenges driving R&D • Airports and the Network • Meeting the challenges - R&D within a Regulatory Framework – NEXTGEN versus SESAR • Conclusion EUROCONTROL 39 Member States UAC Maastricht Central Flow Management Unit EUROCONTROL & EU EUROCONTROL but not EU Central Route Charges Office Institute of Air Navigation Services Experimental Centre Headquarters – SES Support Network Manager General Presentation 3 Challenges Driving R&D The European Organisation for the Safety of Air Navigation 25 IFR traffic in Europe 1960-2010 historical figures 2011-2030 forecast 20 Long-Term Trend 15 Actual Traffic 10 Annual Growth Forecast Trafic 5 Long-Term Average Growth 0 5% 0% -5% -5 -10% 1960 1965 1970 1975 1980 1985 1990 1995 2000 2005 2010 2015 2020 2025 2030 Annual Growth Flights in Europe (Million) Traffic in Europe USA Traffic Growth US air traffic will increase by the equivalent of two major hub airports each year through 2020. 2010 2009 2008 2007 2004 2003 2002 2001 2000 2006 Europe US 2005 130 125 120 115 110 105 100 95 90 85 80 1999 Index (1999=100) • Source: EUROCONTROL PRC/ FAA How Robust is the Growth? Global Recession 2008 Traffic Kosovo Crisis 1999 9/11 2001 SARS 2002 Gulf War 1991 Oil Price Rises 2005+ Oil Crisis 1980 IT Boom 1997-98 Economic Boom 1987-88 1974 1979 1984 IRAQ War 2003 Time 1989 1994 1999 2004 2009 2012 Capacity . 2000 2033 . 8.0 Million Flights 16.0 Million Flights Traffic tripled over last 25 years Traffic will double over next 20 years 1.5 million flights will go un-accommodated if extra capacity is not provided Delays 27.7 million minutes of delays (2010) costing €2.0 Bn. 20% of flights will be delayed by 2020 if system is not modernised Primary Delay Distribution for 2011 Airlines Weather Airports Security Misc En-Route Environment • Top of political agenda • Aviation must continue to make significant effort to reduce its impact on environment Airports and the Network Airports and the Network • Runway and Airport capacity limitations can block growth • Need to make more efficient use of existing capacity – Efficient surface management – Connectivity with ATM Network • • Airports are a key component of ATM Network Must integrate airports into the Network Airport constraints Flights in Europe - 2030 • In most-likely scenario (C), 2 million flights not accommodated Airports are a small but persistent source of primary delay Breakdown average delay per flight 2007-2011 16 Average departure delay per flight in minutes 14 14,7 13,4 12,6 12 10,7 10,0 10 8 6 4 2 0 2007 Airport Primary 2008 Other Primary 2009 2010 En-Route Primary 2011 Reactionary Source: www.eurocontrol.int/coda Meeting the Challenges R&D within a Framework The European Organisation for the Safety of Air Navigation SESAR The European Organisation for the Safety of Air Navigation Single European Sky (SES) Framework • • To address defragmentation Legislation adopted by EU Council and Parliament – 20 April 2004, amended November 2009. • 4 SES Regulations Interoperability Airspace Service Provision Framework Performance-driven Single European Sky ATM Research (SESAR) A new ATM System is required Needs: SESAR • • Turn off fragmented approach • Technical/operational change, supported by Single European Sky legislation • Synchronise plans and actions • • Public Private Partnership • Address European needs and Global interoperability Accelerate evolution in response to challenges – from research to operations Direct involvement of aviation industry in all phases SESAR Joint Undertaking • Public-private partnership to manage the SESAR Development Phase – Execute the European ATM Master Plan – One single ATM R&D programme in Europe • Innovation from private sector • Public financial stability & enforcement power • • 2 founding members: • SJU Budget: ~2.1 B€, till 31 Dec 2016 15 industry members: 19 NEXTGEN The European Organisation for the Safety of Air Navigation NEXTGEN ARRANGEMENTS • • Strong regulatory basis – FAA is Regulator and manages NextGen programme Funding – Lacks a permanent spending bill – FAA Reauthorisation and Reform Act of 2011 passed in the U.S. House of Representatives on April 1, 2011 included a critical amendment authorising a public-private partnership (PPP) • FAA governance supported by the NextGen Advisory Committee (NAC) – FAA can solicit a consensus-based set of recommendations – Forum to obtain a commitment of resources and/or synchronised planning between government and industry – Identify opportunities for industry participation in NextGen implementation. SESAR/NEXTGEN COOPERATION • European and US authorities agreement on the cooperation of SESAR and NextGen. – Agreement is technical annex to European Commission and US Federal Aviation Administration memorandum of co-operation for civil aviation research and development. – Contributes to essential standardisation of ATM systems, to be pursued through the International Civil Aviation Organisation. – Interoperability essential for airspace users operating in US and EU airspaces. Regulatory Impact of SESAR and NextGen on Airports • • • Through SESAR and Next Gen, EC and FAA will define areas in which Airports need to focus their investments The SESAR and NextGen Standardisation and Regulatory Roadmaps will provide the basis for a more global approach EC and FAA will work with ICAO in attempt to establish a global Regulatory Roadmap – On ANC12 Agenda – Airports will be consulted through normal EASA/EC Rulemaking processes • Total estimated cost for SESAR deployment in Europe is 30 Billion Euro – Covers aircraft, ATM Airport and military equipage costs SESAR versus NEXTGEN (1) • • Both benefit from established regulatory frameworks • • Programmes share similar aims Europe more fragmented but USA and FAA face same issues of buy-in and governance complications SESAR – stable funding – EUROCONTROL’s expertise at its core • NEXTGEN – unstable funding to date – PPP? SESAR versus NEXTGEN (2) • SESAR – stable funding – time limited – what happens post-2016? – EUROCONTROL’s expertise at its core • NEXTGEN – unstable funding to date – greater longevity Conclusions • • • Capacity requires ATM network-wide actions Airports can impede traffic growth SESAR and NEXTGEN will facilitate the definition of global and regional regulatory requirements for airports – regulatory roadmaps • • Airports to be integrated in the overall network Europe and FAA both pro-active in achieving a common set of equipment and procedures