BRIDGES ON THE MOVE Sean Poynter, LEED-AP Senior ABC Estimator nothing too heavy, nothing too high A LITTLE ABOUT SARENS… nothing too heavy, nothing too high BRIDGES ON THE MOVE… • • • • FIRST BRIDGE MOVE COMPLETED IN 1980 SINCE THEN WE COMPLETE ON AVERAGE 70 BRIDGES EVERY YEAR BRIDGE MOVES VARY FROM CONCRETE DECK ON STEEL, CONCRETE DECK ON CONCRETE GIRDERS, STEEL TRUSS BRIDGES, ETC. HEAVIEST BRIDGE MOVED IN U.S.- SAM WHITE BRIDGE IN LEHI, UT 354 FEEL LONG AND WEIGHING 4,200 KIPS nothing too heavy, nothing too high SELF-PROPELLED MODULAR TRANSPORTERS (SPMT’s) • USUALLY SEE 4 KINDS OF SPMT’S USED IN THE US. – – – – KAMAG (SARENS CHOICE) GOLDHOFER SCHEURLE NICOLAS nothing too heavy, nothing too high nothing too heavy, nothing too high WHAT THE DESIGNER SHOULD KEEP IN MIND • SPMTS (KAMAG) COME IN CONFIGURATIONS OF 4 AND 6 AXLES. • EACH AXLE HAS A MAXIMUM CAPACITY OF ROUGHLY 79 KIPS • MUST CONSIDER SUPPORT STRUCTURE WHEN DETERMINING SPMT QUANTITY (WEIGHT). • SPACE CONFINEMENTS…..DO THE SPMT’S WORK WITH THE SPACE PROVIDED. • GROUND BEARING CONCERNS. nothing too heavy, nothing too high SPMT BENFITS INCLUDE: • COUPLING SIDE BY SIDE OR END ON END. • FLEXIBLE STEERING. • ACCURATE ALIGNMENT. • CENTRAL CONTROL UNIT. • DIAGONAL/CRAB DRIVE FROM 0°TO 110° • CIRCLE DRIVE “CAROUSEL” AROUND THE CENTER OF THE CONFIGURATION. nothing too heavy, nothing too high WHY SPMT’s OR ABC • • • • • • REDUCE USER COST ALLOW BRIDGE ERECTOR TO BUILD OFF SITE AND OUT OF TRAFFIC. MINIMIZE TRAFFIC IMPACT. FASTER COMPLETION TIME. INCLEMENT WEATHER HAS LESS IMPACT ON CONSTRUCTION SCHEDULE. GOOD INVESTMENT • EVERY $1 SPENT ON ABC THER IS A $5 SAVINGS ON USER COSTS. nothing too heavy, nothing too high HOW SARENS MOVES BRIDGES SUPPORT BEAMS CROSS-BRACING FOR LATERAL SUPPORT 610mm SUPPORT SPOOLS 12-AXLE LINES nothing too heavy, nothing too high EXAMPLE PROJECTS: • ABERDEEN AVENUE – HAMILTON, ONTARIO • SAM WHITE – LEHI, UT • WELLESLEY – WELLESLEY, MA • TORRENCE AVENUE – CHICAGO, IL nothing too heavy, nothing too high EXAMPLE PROJECTS ABERDEEN AVENUE • • • • • • LOCATION: HAMILTON, ON MAJOR THOROUGHFARE: HIGHWAY 403. JOB: REMOVE TWO (2) EXISITING SIMPLE SPANS AND REPLACE WITH TWO (2) NEW SPANS. WEIGHT: ~1,200 KIP CONSTRUCTION: STEEL GIRDER WITH CONCRETE DECK. TIMELINE: 12 HOURS nothing too heavy, nothing too high EXAMPLE PROJECTS SAM WHITE • • • • • • • LOCATION: LEHI, MA MAJOR THOROUGHFARE: I-15. JOB: SET ONE (1) TWOSPAN BRIDGE SECTION. WEIGHT: ~4,200 KIP CONSTRUCTION: STEEL GIRDER WITH CONCRETE DECK. TIMELINE: 12 HOURS EQUIPMENT: 96-AXLE LINES KAMAG SPMT’s nothing too heavy, nothing too high EXAMPLE PROJECTS WELLESLY • • • • • • • LOCATION: WELLESLEY, MA MAJOR THOROUGHFARE: STATE HIGHWAY 9 JOB: SET ONE (1) TWOSPAN BRIDGE SECTION. WEIGHT: ~1,000 KIP CONSTRUCTION: STEEL GIRDER WITH CONCRETE DECK. TIMELINE: 6 HOURS EQUIPMENT: 24-AXLE LINES KAMAG SPMT’s ABUTMENT PREPARATION nothing too heavy, nothing too high EXAMPLE PROJECTS WELLESLY • • • • • • • LOCATION: WELLESLEY, MA MAJOR THOROUGHFARE: STATE HIGHWAY 9 JOB: SET ONE (1) TWOSPAN BRIDGE SECTION. WEIGHT: ~1,000 KIP CONSTRUCTION: STEEL GIRDER WITH CONCRETE DECK. TIMELINE: 6 HOURS EQUIPMENT: 24-AXLE LINES KAMAG SPMT’s ROLLING OUR FROM TEMPORARY CONSTRUCTION ABUTMENTS nothing too heavy, nothing too high EXAMPLE PROJECTS WELLESLY • • • • • • • LOCATION: WELLESLEY, MA MAJOR THOROUGHFARE: STATE HIGHWAY 9 JOB: SET ONE (1) TWOSPAN BRIDGE SECTION. WEIGHT: ~1,000 KIP CONSTRUCTION: STEEL GIRDER WITH CONCRETE DECK. TIMELINE: 6 HOURS EQUIPMENT: 24-AXLE LINES KAMAG SPMT’s ROLLING OUT nothing too heavy, nothing too high EXAMPLE PROJECTS WELLESLY • • • • • • • LOCATION: WELLESLEY, MA MAJOR THOROUGHFARE: STATE HIGHWAY 9 JOB: SET ONE (1) TWOSPAN BRIDGE SECTION. WEIGHT: ~1,000 KIP CONSTRUCTION: STEEL GIRDER WITH CONCRETE DECK. TIMELINE: 6 HOURS EQUIPMENT: 24-AXLE LINES KAMAG SPMT’s USE OF CS250 FOR ADDITIONAL JACKING CAPABILITIES nothing too heavy, nothing too high EXAMPLE PROJECTS WELLESLY • • • • • • • LOCATION: WELLESLEY, MA MAJOR THOROUGHFARE: STATE HIGHWAY 9 JOB: SET ONE (1) TWOSPAN BRIDGE SECTION. WEIGHT: ~1,000 KIP CONSTRUCTION: STEEL GIRDER WITH CONCRETE DECK. TIMELINE: 6 HOURS EQUIPMENT: 24-AXLE LINES KAMAG SPMT’s OPERATION OF THE SPMT’s nothing too heavy, nothing too high EXAMPLE PROJECTS WELLESLY • • • • • • • LOCATION: WELLESLEY, MA MAJOR THOROUGHFARE: STATE HIGHWAY 9 JOB: SET ONE (1) TWOSPAN BRIDGE SECTION. WEIGHT: ~1,000 KIP CONSTRUCTION: STEEL GIRDER WITH CONCRETE DECK. TIMELINE: 6 HOURS EQUIPMENT: 24-AXLE LINES KAMAG SPMT’s AXLES ROTATED TO CRAB nothing too heavy, nothing too high EXAMPLE PROJECTS WELLESLY • • • • • • • LOCATION: WELLESLEY, MA MAJOR THOROUGHFARE: STATE HIGHWAY 9 JOB: SET ONE (1) TWOSPAN BRIDGE SECTION. WEIGHT: ~1,000 KIP CONSTRUCTION: STEEL GIRDER WITH CONCRETE DECK. TIMELINE: 6 HOURS EQUIPMENT: 24-AXLE LINES KAMAG SPMT’s KEEPING THE DECK LEVEL ON UN-LEVEL TERRAIN nothing too heavy, nothing too high EXAMPLE PROJECTS WELLESLY • • • • • • • LOCATION: WELLESLEY, MA MAJOR THOROUGHFARE: STATE HIGHWAY 9 JOB: SET ONE (1) TWOSPAN BRIDGE SECTION. WEIGHT: ~1,000 KIP CONSTRUCTION: STEEL GIRDER WITH CONCRETE DECK. TIMELINE: 6 HOURS EQUIPMENT: 24-AXLE LINES KAMAG SPMT’s PROJECT ENGINNER MONITORING DEFLECTION nothing too heavy, nothing too high EXAMPLE PROJECTS WELLESLY • • • • • • • LOCATION: WELLESLEY, MA MAJOR THOROUGHFARE: STATE HIGHWAY 9 JOB: SET ONE (1) TWOSPAN BRIDGE SECTION. WEIGHT: ~1,000 KIP CONSTRUCTION: STEEL GIRDER WITH CONCRETE DECK. TIMELINE: 6 HOURS EQUIPMENT: 24-AXLE LINES KAMAG SPMT’s SETTING THE BRIDGE! nothing too heavy, nothing too high EXAMPLE PROJECTS TORRENCE AVE. • • • • • • • LOCATION: CHICAGO, IL MAJOR THOROUGHFARE: CHICAGO COMMUTER TRANSIT JOB: SET ONE STEEL TRUSS BRIDGE WEIGHT: ~4,400 KIP CONSTRUCTION: STEEL. TIMELINE: 6 HOURS EQUIPMENT: 96-AXLE LINES KAMAG SPMT’s nothing too heavy, nothing too high THE END THANK YOU nothing too heavy, nothing too high