The impact of BIM: An Architect’s Perspective About Stride Treglown Formed in 1953 10th largest practice in the UK 76th largest practice in the world £14m turnover (2012) 80% retained clients Secured over 50 frameworks throughout the UK 245 members of staff Quality Assured to ISO 9001 / ISO 14001 Environmental Management and BS OHSAS 1800 accredited Investors in People and CHAS accredited We are a ‘Building Top 300’ company What is BIM? BIM is ‘Building Information Modelling’ • A collaborative process of virtual design, construction and management of buildings • The use of BIM unites design phase; construction phase and post construction phases including facility management. • It means understanding and controlling the data flow through these phases, ensuring leanness in its handling and therefore driving efficiency. • If we make the construction process more efficient and eliminate uncertainties before construction, we can drive down cost More dimensions 4D Time (Phasing/Sequencing) 5D Cost. (Measuring/Estimating) 6D Life Cycle. (Building Owner / FM) And the list goes on... 11D? Levels of BIM Collaboration Level 1 • Lonely BIM Architect M+E Structure Contractor Level 2 • Shared BIM Architect M+E Structure Contractor Level 3 • Integrated BIM Architect Structure M+E Contractor Why BIM? Reduce Operation Costs Most of a buildings cost is in it’s operation £1=£10=£100 Design Construct Operate Why from the Government? Digital Leaders Inefficient Industry UK construction costs 20% more than Europe Singapore takes ½ hour to register a planning application All US projects have to be delivered in BIM Zero Change contracts now possible 2016 All Government projects to be Level 2 Shared BIM Access to Information • A shared knowledge resource to support decision-making • Improved coordination • Increased efficiency • Better decisions “A model should provide access to all graphic and non graphic information about a building, as an integrated resource” The Design Process 3D Virtual Design 2D Formation Use Construction More Output for Less Input BIM forces collaboration "BIM is a 21st Century campfire - it gathers people together." David Philp, Cabinet Office What are the challenges? A whole new world The process of change denial resistance commitment exploration New www.ribaplanofwork.com Sub-Structure Super-Structure Mechanical & Electrical Fit-out Shell We have this… … and hope for this… … to produce this But we get this… … and this… … and have to produce this. Twin tracking traditional bim bim Exemplar industry response? Furniture’s Light Bulb Moment Embedded data …driving 100 hits a day When are you having yours? stridetreglown.co.uk