ElectraLink Update on DCUSA Activities Charging Methodology CP Summary Status CDCM EDCM CCCM WG: Pre Consultation 10 (DCP 133, 159, 160, 161, 165, 178, 179) 1 (DCP 138) 1 (DCP 172) WG: Consultation 1 (DCP 158) WG: Post Consultation 5 ( DCP 137, 123, 117, 168, 169, 173, 174, 180) Billing 3 (DCP 162, 166, 167) Change Report Voting Awaiting Consent Approved: Awaiting Implementation 1 (DCP 118) 5 (DCP 142, 144, 146, 147, 148) Approved: Implemented 10 (DCP 130, 126, 131, 132, 134, 136, 150, 163, 128, 129) 1(DCP 152) Rejected 1 (DCP 164) 1 (DCP 139) Total 28 3 1 (DCP 140) 4 (DCP 141, 145, 143, 149) 5 9 Charging Methodology CPs: Definition Stage DCP Title Status DCP 117 Treatment of ‘Load related new connections & reinforcement (net of contributions)’ in the Price Control Working Group considering progression routes for the CP DCP 123 Revenue Matching Methodology Change Awaiting consultancy support DCP 133 500 MW network common model for CDCM input Impact analysis to be completed in January 2014 DCP 137 Introduction of locational tariffs for the export from HV generators in areas identified as generation dominated. Awaiting consultancy support DCP 138 Implementation of alternative network use factor (NUF) calculation method in EDCM Awaiting Ofgem decision on Network Use Factor proposals DCP 158 DNO DUoS re EDNOs Consultation responses due 7 October 2013 DCP 159 Volumes data in the CDCM Awaiting consultancy support Charging Methodology CPs: Definition Stage DCP Title Status DCP 160 Non-Half Hourly (NHH) Notional Capacity Awaiting outcome of DCP 165 before progressing DCP 161 Excess Capacity Charges DCP 162 Working Group is drafting a consultation which will be issued shortly Non-Secure Connections in the Common Connections Charging Consultation closes 4 October 2013 Methodology DCP 165 Voltage Level Approach to Unit Charges in the CDCM Awaiting outcome of DCP 179 before determining how to progress DCP 166 Additional text for the DNO Common Connection Charging Methodology to provide clarity where a customer requests a supply voltage in excess of the ‘minimum scheme’ for the capacity requested. Additional examples for the Common Connection Charging Methodology to illustrate ‘remote reinforcement and remote reconfiguration’ Consultation closes 4 October 2013 The Administration of Use of System charges relating to connections from Embedded Distribution Network Operator (EDNO) systems to Unmetered Supplies (UMS) for LA customers. Working Group is reviewing the consultation responses and determining how to progress DCP 167 DCP 168 Consultation closes 4 October 2013 Charging Methodology CPs: Definition Stage DCP Title Status DCP 169 Seasonal Time of Day (SToD) HH Metered Tariffs in the CDCM Awaiting the progression of DCP 123 DCP 172 Clarification of way in which voltage rise is used in determining Working Group drafting consultation the New Network Capacity document DCP 173 Retrospective changes of Tariff (LLFC / Unique Identifier) The Working Group will issue a second consultation on legal text and progression routes in due course Change Report to be issued to the October Panel DCP 174 Qualification and application of LV sub-station tariffs DCP 178 Notification period for change to use of system charges Working Group drafting consultation document DCP 179 Amending the CDCM tariff structure Awaiting consultancy support DCP 180 Further reduction in the volatility of Use of System Charges Consultation closed on 25 September 2013 Charging Methodology CPs: Implemented DCP Title Status DCP 142 Using D2021 for all invoices/credit notes if it is used at all Implemented 1 October 2013 DCP 144 Prohibiting rounding of HH data Implemented 1 October 2013 DCP 146 HH invoice runs Implemented 1 October 2013 DCP 147 Preventing UoS invoices containing non-UoS elements Implemented 1 October 2013 DCP 148 Rebilling to be done via credit/rebill Implemented 1 October 2013 DCP 171 Housekeeping re Black Yellow Green Implemented 1 October 2013 DCP 177 Housekeeping change relating to DCP 127 to allow Gas Suppliers accession to DCUSA Implemented 1 October 2013 DCP 184 Housekeeping change following implementation of DCP127 Implemented 1 October 2013 Charging Methodology CPs: Approved DCP Title Status DCP 118 Allocation of EHV Costs in the CDCM Price Disaggregation Model Approved for 1 April 2014 Implementation Charging Methodology CPs: Rejected DCP Title Status DCP 164 Review of the change process for Use of System methodology changes Voting closed 8 August 2013 DCUSA Deadlines Consultations: – DCP 158 - DNO DUoS re EDNOs – closes 7 October 2013 – DCP 162 - Non-Secure Connections in the Common Connections Charging Methodology – closes 3 October 2013 – DCP 166 - Additional text for the DNO Common Connection Charging Methodology to provide clarity where a customer requests a supply voltage in excess of the ‘minimum scheme’ for the capacity requested – closes 3 October 2013 – DCP 167 - Additional examples for the Common Connection Charging Methodology to illustrate ‘remote reinforcement and remote reconfiguration – closes 3 October 2013 New Change Proposals: – October DCUSA Panel paper deadline: 9 October 2013 DCUSA Contacts Charging Methodology CPs and DCMF/DCMF MIG – Michael Walls michael.walls@electralink.co.uk – Roz Timperley rosalind.timperley@electralink.co.uk DCUSA CPs, CCCM CPs and DCUSA SIG – Claire Hynes claire.hynes@electralink.co.uk Telephone – 0207 432 3011