The Overall Classification of this Briefing is: UNCLASSIFIED Global Theater Security Cooperation Management Information System (G-TSCMIS) COI WG / RMIPT / TWG 11 July 2013 The Overall Classification of this Briefing is: UNCLASSIFIED Agenda • Roll Call • COI WG o o o o o o DSCA Welcome & DSCA Update Program Office Update J5 Update OSD (Policy) Update Master Schedule Open Forum DSCA PMW 150 Joint Staff J5 OSD (PSO) DSCA All • RMIPT o Requirements Update Joint Staff J6 • TWG o Training Working Group UNCLASSIFIED PMW 150 2 DSCA UNCLASSIFIED 3 Welcome & DSCA Update • C/S/A Reach back • COI Collaboration Site • Event Planning Process Meeting UNCLASSIFIED 4 C/S/A Reach Back • C/S/A G-TSCMIS POCs must be speak on behalf of all G-TSCMIS-related issues for the C/S/A • Current and upcoming discussions require a comprehensive understanding of how different aspects of G-TSCMIS will be used/needed by different communities at C/S/As • It’s the responsibility of the C/S/A G-TSCMIS POCs to reach back to those different communities with the C/S/A UNCLASSIFIED 5 C/S/A Reach Back Example 1 Information needs – what do C/S/As need from DSAMS/SAN or OHASIS? C/S/A G-TSCMIS POC Reach Back C/S/A FMS POC(s) The G-TSCMIS POC must reach back within his/her organization to the FMS and HA POC(s) to understand the information needed. This requirement needs to be articulated to J6 NLT July 30. UNCLASSIFIED 6 C/S/A Reach Back Example 2 • Event Planning Process Discussion • C/S/A G-TSCMIS POC Reach Back C/S/A Planning POC(s) • The G-TSCMIS POC must reach back within his/her organization to the Planning POC(s) to understand the need. Then they need to articulate that need to J6. The planning discussion will take place August 1. UNCLASSIFIED 7 COI Collaboration Site The COI collaboration site will be a one-stop-shop for the G-TSCMIS COI. • Provides a secure location to store, manage and collaborate internal working material (meeting slides, minutes) • Master calendar with notification capabilities • News/updates section with notifications • Collaboration site selection in work • Target date for usage – September 2013 UNCLASSIFIED 8 Event Planning Process Meeting • Objective: Develop a common event planning process for G-TSCMIS • Implemented as a business process • Automated by Release 2 • Request for input regarding each C/S/A’s process milestones NLT July 19. • Using the input submitted, we will compile and present at the meeting. Will discuss the commonalities and differences in processes and determine the best common process for the system. Meeting details: • August 1st from 1300-1500 at DSCA (VTC will be available for non-NCR organizations) • Two representatives per C/S/A. It is imperative that whomever represents your C/S/A be able to fully represent your C/S/A’s planning processes. UNCLASSIFIED 9 PMW 150 UNCLASSIFIED 10 Program Office Update • TEM Update: – Last meeting held 18 June – Need to develop way to showcase how community feedback is incorporated – Next Meeting: 15 October • XWG Update: – Last meeting held 26 June – Transition procedure validation, with C/S/A testing, will occur with subset of operational data from each C/S/A after OT – Next Meeting: 10 July UNCLASSIFIED 11 Joint Staff (J5) UNCLASSIFIED 12 G-TSCMIS Business Rules • Request C/S/As begin thinking about next version of Business Rules (i.e. v1.1) • Issues identified during the G-TSCMIS transition (January 2014) may add to, or modify, Release 1 Business Rules • Please forward change recommendations for existing Business Rules, or addition of new Business Rules to Col Bill Whittenberger • Change recommendations per Release 1 Business Rules (Section 2) processes UNCLASSIFIED 13 OSD (PSO) UNCLASSIFIED 12 G-TSCMIS Policy • Drafting USD (P) G-TSCMIS implementation directive • Engaging with OSD (Strategy) Office on Security Cooperation taxonomy UNCLASSIFIED 13 Master Schedule WG Meetings DATE DESCRIPTION Lead July 10 Transition WG (XWG) PMW 150 July 11 COI/RIPT/TWG DSCA/J6/PMW 150 July 24 Transition WG (XWG) PMW 150 October 15 Technical Exchange Meeting (TEM) PMW 150 Notes COI Events/Activities DATE DESCRIPTION Lead July 8-22 Integration Testing (IT) PMW 150 July 31 XWG Concurrence on Transition Schedule PMW 150 August 1 Face-to-Face Mtg (Event Planning) DSCA September TBD Governance Council Meeting DSCA November Operational Testing (OT) PMW 150 January 15 G-TSCMIS R1 Field Decision Review PMW 150 UNCLASSIFIED Notes - Extended from 19 to 22 July due to Furlough -COTF emailing RE: COI Testing -goal date in order to have schedule ready for prebriefs - Replaces Aug 1 COI/RIPT/TWG - GO/FO representation - COTF emailing RE: COI Testing 14 Requirements Management IPT (RMIPT) Joint Staff J6 UNCLASSIFIED 15 JS J6 Admin Note: • For planning purposes – the furlough day for JS J6 CCD is Fridays UNCLASSIFIED 16 NRID Item 1072 • NGB requested their own instance of I-TSCMIS so they can move NG SPP records out of ARGOS and into their own instance of I-TSCMIS. • No non-concurs received • Next Step: HPT discussion/decision UNCLASSIFIED 17 R2 Requirements Assistance • On 5 June, we requested your input on three requirements (71, 72, 49) - Format for a “Fact Sheet” - Reports that have required formatting - format for standard visual presentation documents (e.g., Power Point) • On 27 June we requested a final review of example formats received and submitted to PMO. Also, requested additional input on ADS data requirements for R2 (OHASIS, DSAMS, JCRM, GFM-DI, JTIMS). • Next step: Working with PMO/DSCA/SE Team to work through the details and provide updated OV-7 and additional sample reports per recommendations received beyond requirements 71, 72, 49. UNCLASSIFIED 18 G-TSCMIS Release 3 CP Projected start date: September 2013 1st Draft: November 2013 Staffing: January 2014 Release 4-5 CP Development Projected start: April 2014 UNCLASSIFIED 19 Training Working Group (TWG) PMW 150 UNCLASSIFIED 20 Agenda • R1 Interactive Courseware (ICW) Prototype • R1 Integrated Test (IT) Training Events • R1 IT Participant List UNCLASSIFIED 21 R1 ICW Prototype Purpose • To achieve TWG “buy-in” for the proposed conceptual design; If the TWG disagrees with the proposed conceptual design, it is better to find out and make adjustments early in the process Review was conducted 14 – 28 June 2013 • Responses received from: USMC NORTHCOM CENTCOM Joint Staff Army UNCLASSIFIED 22 R1 IT Training Events Training events scheduled 8 Jul: View Only and Event Owner 0800-1400 EDT 9 Jul: View Only and Event Owner 0800-1400 EDT 10 Jul: Org Data Manager 0800-1400 EDT 11 Jul: Org Data Manager 0800-1400 EDT IT Participants IT participants have been identified by the C/S/As and roles have been assigned by the PMO UNCLASSIFIED 23 R1 IT Participant List UNCLASSIFIED 24 R1 IT Participant List UNCLASSIFIED 25