The ecar Ireland Project Smart Grid Technology Watch Event September 18th 2014 John Whelan, ESB ecars Agenda • The ecar Ireland Project – Conception • Electric Vehicles in Ireland • Charge Point Infrastructure • Charge Point Management System • Grid Impacts www.esb.ie/ecars 2 Agenda • The ecar Ireland Project – Conception • Electric Vehicles in Ireland • Charge Point Infrastructure • Charge Point Management System • Grid Impacts www.esb.ie/ecars 3 Ecar Ireland Program • • • • Government targets 2020 - 10% of all vehicles electric - 10% of all road energy transport will be renewable Early supply of electric cars - MOU signed with Mitsubishi, Renault-Nissan and Toyota Government incentives - €5000 grant - Zero VRT - Lowest road tax band - Accelerated Capital Allowance (Businesses) - Government taskforce to deliver other incentives ESB is rolling out the infrastructure www.esb.ie/ecars 4 Ireland as a Test Bed for Electric Vehicles • Large wind penetration • Limited range between cities • Type of homes • Good climate for batteries • Single network company www.esb.ie/ecars 5 CO2 Emissions Internal Combustion Engine End of chain emissions 2010 150 g/km 2015 130 g/km Electricity Generation COAL 130 g/km GAS 50 g/km WIND 0 g/km www.esb.ie/ecars 6 Agenda • The ecar Ireland Project – Conception • Electric Vehicles in Ireland • Charge Point Infrastructure • Charge Point Management System • Grid Impacts www.esb.ie/ecars 7 Electric Vehicles in ESB’s Fleet Old Electric Vehicles from 1950 - 1970 Current Electric Vehicles – Allied Peugeot / Micro-vett Fiat Fiorino / Smiths Edison www.esb.ie/ecars 8 Electric Vehicles Available in Ireland Mitsubishi iMiEV Nissan Leaf Mitsubishi Outlander Renault Kangoo Renault Zoe BMW i3 www.esb.ie/ecars 9 Other Electric Vehicles in Ireland Smiths Newton (Celtic Linen) Smiths Newton (Grange Builders Providers) Smiths Newton (OPW) www.esb.ie/ecars 10 All Major Car Manufacturers Have EV Programs www.esb.ie/ecars 11 EV Components Battery Pack Inverter Charger + DC-DC Converter AC Motor www.esb.ie/ecars 12 Agenda • The ecar Ireland Project – Conception • Electric Vehicles in Ireland • Charge Point Infrastructure • Charge Point Management System • Grid Impacts www.esb.ie/ecars 13 Charging Infrastructure HOME / WORK 6 – 8 hours PUBLIC 1 – 2 hours FAST 80% in 20 minutes www.esb.ie/ecars 14 Home Charge Points First 2000 installed for free 16/32 amps, single-phase Fed from customer distribution board www.esb.ie/ecars 15 Public AC Charge Points 22kW double socket (three-phase 32 amps) RFID card reader GPRS communications with back office Internal MID metering www.esb.ie/ecars 16 Fast Charge Points DC – CHAdeMO 50kW DC/AC – CCS 50kW Fast AC – 44kW www.esb.ie/ecars 17 Ireland’s Current Charge Point Network 851 – Domestic and Commercial Charge Points 805 – AC Public Charge Points 61 – Fast Charge Points 1717 - Total www.esb.ie/ecars 18 Agenda • The ecar Ireland Project – Conception • Electric Vehicles in Ireland • Charge Point Infrastructure • Charge Point Management System • Grid Impacts www.esb.ie/ecars 19 Back Office www.esb.ie/ecars 20 Agenda • The ecar Ireland Project – Conception • Electric Vehicles in Ireland • Charge Point Infrastructure • Charge Point Management System • Grid Impacts www.esb.ie/ecars 21 Power Quality Measurements www.esb.ie/ecars 22 Charging Profiles (Slow AC) – Nissan Leaf Voltage Harmonics Profile 20 2 16 1.8 Voltage THD (%) Current (A) Current Profile 12 8 4 0 10:30 11:56 13:22 14:49 16:15 1.6 1.4 1.2 1 10:30 17:42 11:56 13:22 Time 0.98 12 Current THD (%) 16 0.96 0.94 0.92 13:22 14:49 Time 17:42 16:15 17:42 Current Harmonics Profile 1 11:56 16:15 Time Power Factor Profile 0.9 10:30 14:49 16:15 17:42 8 4 0 -4 10:30 11:56 13:22 14:49 Time www.esb.ie/ecars 23 Charging Profiles (Fast DC) – Nissan Leaf – DBT FCP Current Profile Power Factor Profile 70 1 0.8 50 Power Factor Current (A) 60 40 30 20 10 0 15:12 0.6 0.4 0.2 15:23 15:35 Time I1 15:46 15:58 0 15:12 I2 15:46 15:58 Reactive Power Profile 30 0 25 20 15 10 5 15:23 15:35 Time I1 I2 15:46 15:58 Reactive Power (Var) Current THD (%) 15:35 Time I3 Current Harmonics Profile 0 15:12 15:23 -5000 -10000 15:12 15:23 15:35 Time 15:46 15:58 I3 www.esb.ie/ecars 24 Macro Level Grid Impacts www.esb.ie/ecars 25 Thank You