Integrating QAD and The Quality Management System

advertisement
QAD Quality Management System Software
QAD and The Quality Management System (QMS)
Bob Herdoiza, President, CEBOS, a division of QAD
Top Five Quality Failures of All Time
•
•
•
•
Three Mile Island
At the time of safety discussions!
Worst disaster in US history
Preventable with controls
 Auxiliary coolant values shut
 Failure resulted in no coolant
 Human error
2
Top Five Quality Failures of All Time
•
•
•
•
•
•
Hubbell Telescope
Great idea until….
Images a bit better than from earth
Most precisely ground mirror…
Negative tests ignored
$$$$
3
Top Five Quality Failures of All Time
•
•
•
•
iPhone 4
Calls dropped
Touching it in a certain spot…
Market dominance at stake
4
Top Five Quality Failures of All Time
•
•
•
•
•
•
Teton Dam
Just completed
Collapsed and flooded 6 miles canyon
Improper materials used
Spillway gates blocked with sheet metal
Routine maintenance scheduled, yet…
5
Top Five Quality Failures of All Time
•
•
•
•
•
Nominate the entire 70s US auto Industry?
Built cars in the 70s that wanted in the 60s
Ford Pinto
Unreliable after 40 – 50k miles
Design flaws made it dangerous
6
QAD and the Quality Management System
Agenda
•
•
•
•
•
QAD and CEBOS
Integration Capabilities
The Effective Enterprise and the QMS
Benefits
Open Discussion
7
QAD and the Quality Management System
Who Is CEBOS?
•
•
•
•
•
18 Year Old Software Company
Approximately 350 Active Deployments
Currently supporting 12 languages
Serve vertical markets of QAD
Registered to ISO 9001:2008
8
QAD and the Quality Management System
What’s CEBOS/QAD Relationship?
•
•
•
•
•
Formerly a CSP Partner Since 2009
Acquired by QAD December 2012
Operating as a Division of QAD
Enhance QAD Enterprise Applications
Effective Enterprise
9
QAD and the Quality Management System
Customers
10
QAD and the Quality Management System
Product Overview
Document Control
Dashboard Reporting
Training Tracking
Corrective Action /
Nonconformance
Audit Management
Project
Management
Gage Calibration
APQP, PPAP, Risk
Management
Maintenance /
Tooling
Quality Data
Collection
Supplier
Management
• Comply with quality standards (ISO, TS, AS, FDA, etc.)
• Integrate related quality processes and QAD
• Automate required business processes
11
QAD and the Quality Management System
CEBOS’ Product MQ1
12
QAD and the Quality Management System
Integration
E-Sync
QXTD
MQ1
XML
E-Sync
Integration
Functional
Functional
Description
Description
• Compare external data source
• Standard
with MQ1 XML
database
web services
• Standard
Add any missing
interface
records
functions
to MQ1
• Verification
Update existing
of receipt
records
between
in MQ1
• services
Library of items to synchronize
Integration
• Push/Pull Data
Toolkit
XML File
Transfer
13
QAD and the Quality Management System
Integration
Best-in-Class manufacturers are creating closed loop quality
management by implementing QMS at an enterprise-wide level and
establishing real-time interoperability with PLM, MOM, and SCM
technology.
- Aberdeen June 2011 “Closed Loop Quality Management”
14
QAD and the Quality Management System
One Way Integration Examples
•
•
•
•
•
•
•
•
•
•
Employee names
Employee positions
Equipment
Part numbers
Customers
Suppliers
Supplied goods
Pieces shipped
Pieces produced
Defect information
15
QAD and the Quality Management System
Integration Points
• Incoming Inspection (QAD  MQ1)
- Receiving triggers inspection
• In-process Inspection (QAD  MQ1)
- Move between operations triggers an inspection
• Defect Log to inventory (MQ1QAD/QADMQ1)
- Recording a defect moves material to MRB in QAD
- Material is moved to MRB, a defect is created
16
QAD and the Quality Management System
Integration Points
• Customer Complaint
- Complaint call logged in QAD, CAPA created in MQ1
• Training Check
- Operator training validation check before work
• Calibration Check
- Gage calibration validation before use in QAD
17
Integrating QAD and the Quality Management System
QAD / Quality Management Integration
• ALT
- QAD  MQ1
• Customers
• Suppliers
• Products
- MQ1  QAD
• Documents  Part
Master (e.g., Dwgs,
SOPs, OI, etc.)
• Lang Mekra /
Endologix (piloting)
- QADMQ1QAD
• Receiving  Incoming
Inspection  CAPA
• Build  In-process
Inspection  CAPA
18
QAD and the Quality Management System
The Effective Enterprise - Why QMS?
19
QAD and the Quality Management System
The Effective Enterprise – Current Challenges
20
QAD and the Quality Management System
The Effective Enterprise – Current Challenges
21
QAD and the Quality Management System
The Effective Enterprise – Current Challenges
22
QAD and the Quality Management System
The Effective Enterprise – Current Challenges
23
QAD and the Quality Management System
The Effective Enterprise – Current Challenges
Quality
Environmental
Health & Safety
Doc’s
Doc’s
Doc’s
Training
Training
Training
CAPA
CAPA
CAPA
Audits
Audits
Audits
Supplier
Supplier
Supplier
24
QAD and the Quality Management System
What enables an Effective Enterprise?
25
QAD and the Quality Management System
Document control
New
Document
Document
Type
Archive
Previous
Approval
Publish
Document
Training
required?
Change
Request
26
QAD and the Quality Management System
Document Control
27
QAD and the Quality Management System
Traceability and SPC
Test 1
Test 2
Test 3
Inspection
Plan
Inspection Event
Failure
(NCR/CAPA)
Result 1
SPC
Result 2
SPC
Result 3
SPC
FMEA
28
QAD and the Quality Management System
Traceability and SPC
29
QAD and the Quality Management System
NC / CAPA
Corrective Action
Step 1
Checklist
Step 2
Step…
Problem
Template
Nonconformance
Step 2
Step 2
RMA, Complaint…
Steps…
Approval
Configurable
Reporting and
Metrics
30
QAD and the Quality Management System
NC/CAPA
31
QAD and the Quality Management System
APQP
Part Information
Specs / Prints
Process Flow
Standard or Custom
Report Formats
Characteristics
FMEA
Part Approval
Control Plan
Other Supporting
Documents
Data
Collection
Plan
Operator
Instructions
/ Check
Sheets
NonConformances
32
QAD and the Quality Management System
APQP / FMEA
33
QAD and the Quality Management System
Benefits
• Linkage between modules
• Time 
Total Expected Savings:
3583
448
hours / year
days / year
• Auto follow up / escalation
• Anticipate less audit findings
• Finding other applications for improvement
- Records
- Gage R&R
- Alerts / Deviations
• Intuitive – people want to use it
34
QAD and the Quality Management System
Questions & Answers
35
Building the
Effective Enterprise
Join us in San Antonio, TX
May 6-9, 2013
Early Bird Ends Soon!
36
QAD and the Quality Management System
Next Steps
•
•
•
•
Contact your account representative
www.cebos.com
810.534.2222
bob@cebos.com
37
QAD and the Quality Management System
www.qad.com
© QAD Inc
38
Download