LEAN COMMISSIONING: MAKING YOUR COMPANY’S PROCESS MORE EFFICIENT & EFFECTIVE ACG 9th Annual Conference April 18, 2013 Chicago, IL Derek De Jesús, CxA, LEED AP BD+C National Commissioning Manager KJWW Engineering Introduction Introduction SHARE, SUPPORT, LEARN 1. 2. “Lean” – What, Why and How Applying “Lean” ideas to Commissioning What does “lean” mean? • Webster • to incline, deviate, or bend from a vertical position • Weight Watchers • Reduce weight through healthy eating and exercise • Toyota • The two focal points of the principles are continuous improvement and respect for people • Motorola • aimed at minimizing variability in manufacturing through the standardization of product defect measurement….optimizing customer value and reducing waste Why do we get “lean”? • Cut waste • Get to our goal quicker • Save money, Increase profit http://www.lean.rit.edu/about.aspx How do we get “lean” • Identify waste • Listen to your client • Integrate and adapt http://www.lean.org/WhatsLean/Principles.cfm Apply “lean” thinking to Commissioning http://www.novaces.com/lean-six-sigma-implementation.php Apply “lean” thinking to Commissioning Programming Occupancy Design Project Acceptance Construction Programming Phase • Earlier the better…but why? • Integrate, Collaborate, Document • Owner’s Project Requirements • How effective is this tool? • Who is really driving the project? • Establish Commissioning Process Design Phase • Design Reviews • Don’t be afraid to talk, converse • How do you do this on a D/B/B vs D/B? • Specifications • Purpose….contract for the contractors • Get rid of the duplicative redundant duplication Design Phase • Commissioning Plan • What is your definition? • What do you use this tool for? • Living document…hardly • Use it, preach it, enforce it • Incorporate spec language to reduce duplication • How do people learn? Design Phase • Actions Log • Change the nomenclature • The MOST IMPORTANT TOOL! • Document EVERYTHING! • Database vs Excel vs text file • Relationships, macros, filters, reports, etc… Construction Phase • Submittal reviews • Does a concurrent review really work? • Process is completely different for D/B vs D/B/B • Site Observations, Meetings • Get to the point already • Invite only those needed Construction Phase • Actions Log • Demand action • Pre-Functional Checklist • The 2nd worse document in Commissioning History • What is your goal with this? • Who is doing it and how? • Manage, document • Extract the right information • Require only the requisite information Acceptance Phase • Scheduling • Pull method • IPD and D/B are easiest • Not static but not rocket science either • Be productive by making known your goals Acceptance Phase • Functional Performance Test • When are these documents developed? • How is it developed? • Collaboration is required • Get the contractor to perform as part of the PFC Occupancy Phase and Beyond • O&M Manuals • Electronic…duh, but what about interactive…? • How will the owner use them? • Does the staff have laptops, tablets? • Building have wifi for access online documents? • Sale to the Owner early O&Ms that are more than pdfs • Create a true Systems Manual as a standard, your building will thank you Occupancy Phase and Beyond http://www.deloitte.com, 2012 Study, page 8 Wrap Up