Implementation of NAVWELD Software to Support Electronic Welding Procedures AWS Shipbuilding Conference May 11, 2011 Paul Hebert Manager, Welding Engineering HUNTINGTON INGALLS INDUSTRIES PRIVATE/PROPRIETARY LEVEL I Overview Strategy/Implementation Objectives Advantages Software Selection 2 Procedure of Tomorrow (POT) HUNTINGTON INGALLS INDUSTRIES PRIVATE/PROPRIETARY LEVEL I Challenges Objectives #1 - Electronic Only #2 - All Inclusive #3 – User Friendly: 3 - Finding Procedure - Navigating - Comprehension HUNTINGTON INGALLS INDUSTRIES PRIVATE/PROPRIETARY LEVEL I Software Selection => Commercial Standards (i.e. ASME) => MIL Standards (i.e. MIL-STD-248) Develop MIL-STD Specific Software 4 HUNTINGTON INGALLS INDUSTRIES PRIVATE/PROPRIETARY LEVEL I Software Selection Development Team Members NGSB-NN GDEB NAVSEA NSWC - Carderock 2003 SBIR Phase I 2004 2005 2006 2007 SBIR - Phase II NMC Weld QC 2008 2009 MANTECH NavWeld Web-based software application & database that assists the user in developing welding procedures according to NAVSEA requirements. 5 HUNTINGTON INGALLS INDUSTRIES PRIVATE/PROPRIETARY LEVEL I Software Selection NavWeld Modules Procedure Qualification Record (PQR) • • • • Essential Elements NDE Tests Destructive Tests & Number of Samples Qualified Ranges • Fabrication Document Requirements Welding/Brazing Procedure Specification (WPS) • Essential Elements • Fabrication Document Requirements Welder/Brazer Performance Qualification (WPQR) 6 • • • • • Essential Elements NDE Tests Destructive Tests & Number of Samples Qualified Ranges Tracks Welder History HUNTINGTON INGALLS INDUSTRIES PRIVATE/PROPRIETARY LEVEL I Software Selection NavWeld – Processes and Documents Process Qualification Documents Fabrication Documents • TP278 Arc • TP248 • TP1688 • ABS/NVR - 2007 • MIL-STD-1689A • ABS/NVR - 2007 Stud Resistance Brazing (Piping) 7 • TP1688 • TP248 • ABS/NVR - 2007 • MIL-STD-1689A • ABS/NVR - 2007 • AWS D17.2 • AWS D17.2 • 0900-LP-001-7000 • 0900-LP-001-7000 HUNTINGTON INGALLS INDUSTRIES PRIVATE/PROPRIETARY LEVEL I Strategy / Implementation NAVSEAs Engineer Engineers Historian Evolution of Legacy Procedures Fortune Teller Clean Up for POT All Inclusive Review = Specifications / PQR’s / History 8 Document for Each WPS HUNTINGTON INGALLS INDUSTRIES PRIVATE/PROPRIETARY LEVEL I Preheat Strategy / Implementation Welding Parameters Specification Legacy Procedures – Information in Multiple Locations Consolidate for POT Procedure = Handful of Pages = All Requirements = Certified = Approved 9 Hand to the welder to use HUNTINGTON INGALLS INDUSTRIES PRIVATE/PROPRIETARY LEVEL I Strategy / Implementation Generic Legacy Procedures – Given Material / Process Multiple Filler Metals Special Exceptions Subtle Differences Multiple Joint Designs Make POT More Specific One filler = limited joint designs = minimal notes / exceptions One Technique in Legacy Procedure = 3 or 4 or 5 in POT (dbase – who cares?) 10 HUNTINGTON INGALLS INDUSTRIES PRIVATE/PROPRIETARY LEVEL I Strategy / Implementation Legacy Procedure Revisions User to ID Changes => 800+ Pg. Procedure POT Revisions – Clear and Visible 11 Revision Record - First Page of Each WTN = What + When + Why Changed HUNTINGTON INGALLS INDUSTRIES PRIVATE/PROPRIETARY LEVEL I Advantages Creating PQR / WPS Once PQR created - Print Qualified Range Report to ID procedure ranges 12 HUNTINGTON INGALLS INDUSTRIES PRIVATE/PROPRIETARY LEVEL I Advantages Creating PQR / WPS Enables and Disables Fields Based on Inputs ***If you select ceramic backing you have to enter manufacturer and type*** 13 HUNTINGTON INGALLS INDUSTRIES PRIVATE/PROPRIETARY LEVEL I Advantages Creating PQR / WPS Bounces input against the spec and flags incomplete info ***Missing Minimum Travel Speed*** 14 HUNTINGTON INGALLS INDUSTRIES PRIVATE/PROPRIETARY LEVEL I Advantages Creating PQR / WPS Prompts user where to go in spec for rule 15 HUNTINGTON INGALLS INDUSTRIES PRIVATE/PROPRIETARY LEVEL I Advantages Real Time Revisions Old System: Make change in MS Word + send to QA + QA send to repro + QA make distribution + recipients make changes to paper copy = Weeks NAVWELD System: Make Change in Dbase + Validate electronically + Revised Procedure ready for use = Minutes Caution Real Time Revision = Double Edged Sword Person looks at procedure – we make change afterwards – he is using an outdated procedure. Solution: Adding something no big deal – anytime Taking something away – we need to take the action to let user know. 16 HUNTINGTON INGALLS INDUSTRIES PRIVATE/PROPRIETARY LEVEL I Advantages Procedures Easy To Find 17 HUNTINGTON INGALLS INDUSTRIES PRIVATE/PROPRIETARY LEVEL I Advantages Consistent Format 18 HUNTINGTON INGALLS INDUSTRIES PRIVATE/PROPRIETARY LEVEL I Advantages Procedure Stand-Alone Printed Out 19 HUNTINGTON INGALLS INDUSTRIES PRIVATE/PROPRIETARY LEVEL I Advantages Green SSPs = 16 Proc X 500 pgs each X 50 copies = 400,000 pages (not counting revisions) SOPs = 91 Proc X 20 pgs each X 5 copies = 9100 pages (not counting revisions) Not counting electricity to create and copy + fuel to distribute Paper = .0038” thk. X 409,100 pgs. = 130 feet high stack 20 HUNTINGTON INGALLS INDUSTRIES PRIVATE/PROPRIETARY LEVEL I Advantages Electronic Data Kiosk on shop floor / ship PDA – Foremen to carry procedure with them Weld Procedure Data Welder Qual data Eng Data User 21 Job Assignment HUNTINGTON INGALLS INDUSTRIES PRIVATE/PROPRIETARY LEVEL I Challenges ABC Computer Literacy – What about those who aren’t proficient with computers? - Ease of Use - Training Reliability - What happens if the computer crashes? - Back-Up Paper Copy - Back-Up PDF Copy 22 Resistance to Change – Why can’t you leave the procedures the way they’ve always been? - Involve users in the process - Stress the advantages - Listen - Tenacity HUNTINGTON INGALLS INDUSTRIES PRIVATE/PROPRIETARY LEVEL I ??????