NR - ULDC SCHEME POINTS OF CONCERN POINTS OF CONCERN 1. LACK OF REDUNDANCY 2. FREQUENT BUGS IN SCADA SOFTWARE 3. INCOMPLETE REPORTING SYSTEM 4. EMS – INCOMPATIBLE PACKAGES 5. PROLONGED DATA INTERRUPTIONS DUE TO POWER SUPPLY PROBLEMS 6. SOME IMPORTANT PROJECT SPECIFIC WORKS STILL PENDING Data flow in ULDC scheme SLDC RSCC OPERATOR CONSOLE SLDC OPERATOR CONSOLE OPERATOR CONSOLE RTUs REPORTING TO RSCC RTUs SLDC DS RTUs REPORTING TO SLDC SUBLDC DS RTUs SLDC ICCP RTUs RTUS REPORTING TO SLDC DATA OF CS & OTHER SLDCs RSCC ICCP CPCC RTUs SLDC DS RSCC DS DATA OF CS & OTHER SLDCs RTUs SLDC ICCP CS RTUs REPORTING TO RSCC SUBLDC DS RTUs J & K, PUNJAB, BBMB, HPSEB DELHI MAIN DATA J & K, PUNJAB,BBMB,HPSEB MAIN DATA S/B DATA UP SEB MAIN DATA S/B DATA SONEPAT KANJHAWALA NAJAFGARH UPSEB S/B DATA PANIPAT BAWANA MURADNAGAR NARELA-JHANGIRPURI- GOPALPUR-WAZIRABAD - DADRI HVDC BAMNAULI A PATPARGANJ DELHI STD BY BALLABGARH IP EXT OKHLA SARITA VIHAR BADARPUR MALVIYANAGAR RSCC VASANT KUNJ RAJESTHAN MAIN MEHRAULI CRITICAL STATION AFFECTING COMMUNICATION LINK FROM SLDCs TO RSCC MOST CRITICAL STATION AFFECTING ALL MAIN & STANDBY DATA OF ALL SLDCs : BADARPUR SECOND MOST CRITICAL STATION AFFECTING MAIN DATA OF ALL SLDCs : MURADNAGAR-I : DADRI HVDC :BALLABGARH OUTAGE OF PANIPAT & DHULKOTE WILL ALSO AFFECT main and standby of ALL SLDCs EXCEPT UP & RAJASTHAN SCADA Problems CFE hanging frequently at many locations resulting into loss of RTU Frequent failure of Applications resulting into failure of DATA SERVERS. Interruption of data and loss of HIM data. In HDR different values at the same time point with change of sample rate In HIM Frequent crashing of Oracle, reset of juke box,long term storage of Data Reports for MIN,MAX,Avg still not available SCADA Problems (continued) LAN problem Shortcoming in trending functions ( scale , tabular etc.) Frequent tripping of UPS especially at SUBLDC level. EMS PROBLEMSRESOURCE SCHEDULING & COMMITMENT (RSC) Scheduling Philosophy 15 minutes block instead of hourly. Regional and Inter-regional bi-lateral not covered Desired treatment of Hydro station not provided Share/Entitlement not provided as per requirement Unit wise scheduling instead of Plant wise No provision of Regional and inter-regional losses. EMS NETWORK APPLICATIONS (State Estimation,Contingency Analysis,Security Enhancement) Non-Availability of Complete Status of CBs and Isolators through Telemetry. Non-Availability of complete Generator data such as capability curve etc. Database modelled with typical generators. DTS -Application DTS –PROBLEM UNABLE TO INITIALISE FROM REAL TIME Recent Problem Data is being interrupted in case of outage of standby Links in spite of availabIlity of Main links. E.g Outage of sarita Vihar (07.11.03) and Wazirabad (12.11.03) Testing was carried out on 11.11.03 by manualy switching of MCB at Sarita Vihar. RTU Reporting Status 1. Total RTUs-366 2. RTUs Integrated-333 3. RTUs Reporting- 275 BEMINA SUBLDC HAVING 8 RTUs NOT INTEGRATED. Pending important Analog points 1 Gross unit generation data for Badarpur,Singrauli, Unchahar not available. 2 Unit generation data of Dadri-Gas, Anta ,Chamera and Auriya not available. 3 Few line/ICT flows not available. Pending important Digital points 1. NTPC- AURIYA, BADARPUR,DADRI-GAS 2. POWERGRID- SOME POINTS PENDING. 3. DTL- 50 % PENDING 4. UPPCL- 30 % PENDING 5. RVPNL- 20 % PENDING PLCC LINK PROBLEM 1. EITHER MAIN OR STAND BY LINK FOR AGRA, ALLAHABAD, FARIDABAD –PP, MEERUT, VINDHYACHAL,ABDULLAPUR, MALERKOTLA, NALLAGARH AND SRINAGAR NOT WORKING. 2. EITHER MAIN OR STANDBY LINK FOR SALAL, BAIRASUIL, CHAMERA, URI, ANTA,AURIYA, UNCHAHAR, NARORA AND RAPP NOT WORKING.