TPDDL - DSM_EE_initiatives___TPDDL_24012012

advertisement
DSM & Energy Efficiency Initiatives at
Tata Power Delhi Distribution Limited
(formerly: NDPL)
Date: 24/01/2012
Climate Change @ TPDDL
…Carbon footprint
mapping and
abatement strategy
…Tata approach,
aspirations and
internal stance
…Capability building
and communications
• Carbon footprint mapping for TPDDL done
• Abatement levers identified- focus on procurement of Power from low emission
factor Plants
• TPDDL Climate Change Policy rolled out
• Combat Climate Change team formed to oversee risks and opportunities
and implement initiatives
• CC Initiatives introduced as part of the BSC and cascaded to functional score
cards
• 7 Climate Change Champions trained, 31 Officers exposed to National
seminars + 4 Climate Change Assessors
• Over 2000 TPDDL employees touched in last one year
• Participated in CII exhibition on Climate Change
• Climate change newsletter started, carbon calculator on TPDDL website.
• Energy booklet for Schools & Consumers. State level Climate Change Quiz
& Debate organized.
2
Climate Change Initiatives
• Under its Climate Change policy, TPDDL is committed to introduce energy
efficient and greener technologies and identification of the mitigation &
offset opportunities in a cost effective manner.
Various Initiatives taken under Combat Climate
Change :-






Energy Club for school students
Tree Plantation
Use of Battery operated vehicles
Solar Power (Installed capacity: 1.272 MW)
E Bill to consumers
Water Harvesting
3
• Load Research
• DJB Peak Shifting
• LED Hoardings
• Temperature setting of Airconditioning Unit Of Bank
ATMs
• LED street lights
• LED indoor applications
• Appliance
Replacement
Program for Refrigerators &
ACs
Ongoing Projects
Completed Projects
DSM & EE-Journey So Far
• Bachat Lamp Yojana
• DFID
(Department
For
International Development)
supported
Appliance
Replacement Program for
Refrigerators & ACs
4
Energy Efficiency Initiatives-Completed Projects
Load Research
•
Load research carried out for residential consumers
(10,000) in 2010
•
Objective: To understand the end energy use &
penetration of various brands, appliances among
consumers
•
Based on the findings, identified following DSM program
: Policy advocacy of Gas water Heaters
 Appliance Replacement Program for Refrigerators &
Air Conditioners
 Awareness on star rated appliances
5
Energy Efficiency Initiatives-Completed Projects
DJB Peak Shifting
•
First of its kind peak shifting project in consortium with
water utility of Delhi, Delhi Jal Board (DJB).
•
After load profiling of TPDDL & DJB, suggested DJB to
shift its morning operating hours (water pumping
stations) by 1.5 hours, to minimize coincidence with
TPDDL peak
•
Shift in the operation time was initiated from Aug ’09.
•
Continuous monitoring & verification in progress.
•
Key Benefits:
 Shift of 2 MW load from TPDDL peak
6
Energy Efficiency Initiatives-Completed Projects
LED for Advertising Hoardings
•
Metal halide Lamps (150 W) replaced with LED fixtures
(40 W) at 10 TPDDL locations
•
Key Findings
 75% reduction achieved in energy load
System
Parameters
Power
Consumption
(W)
Lux Level
Metal Halide
LED
750
200
52
79
THD (I)
22.7%
12.5%
7
Energy Efficiency Initiatives-Completed Projects
Policy Advocacy Bank ATMs
•
Energy saving potential identified at Banks ATMs -ACs
running 24 hours at 16-17°C throughout summer
•
Dialogues held with Ministry of Environment & Forest
(MoEF) ;resulted in MOEF issuing guidelines to all the major
banks in Delhi to ensure the optimal temperature setting of
the ACs of their ATMs
•
Observed savings of 0.16 MUs during summer
•
Regular Monitoring &Verification in progress
8
Energy Efficiency Initiatives-Completed Projects
LED Streetlights
•
•
250 W HPSV lamps replaced with 100 W LED lamps for 18
street light fixtures on pilot basis.
Key Findings
 Load reduction to the tune of 65%
System
Parameters
•
Unit
Metal Halide
LED
Load
W
250
100
Lux level
Lux
6
21
THD
%
33
11
In Discussion with Govt. Agencies to extend the initiative pan
Delhi
9
Energy Efficiency Initiatives-Completed Projects
LEDs-Indoor Applications
•
T12& T8 tube lights replaced with LED Tube lights (Number:
351) at corporate office
•
Key Findings
 Load Reduction to the tune of 65%
10
Energy Efficiency Initiatives-Completed Projects
Promotion of Star Rated Appliances
•
•
•
•
•
Appliance Replacement Program launched in association
with LG, Voltas & Godrej
Offered Exchange Scheme, under which existing old
Refrigerators and Air Conditioners can be replaced with
new Energy Efficient BEE Star Rated Refrigerators &
ACs
Consumers benefit-Reduction in energy bills, special
discounts on market prices, good salvage value for old
appliance
Scheme was available from 1st Aug, 2011 to 31st Oct,
2011
Over 4000 star rated Appliances sold under the scheme
11
Energy Efficiency Initiatives-Ongoing Projects
Bachat Lamp Yojana
•
•
•
•
•
•
Bachat Lamp Yojana (BLY) : CDM based scheme developed
by BEE
Aims at large scale replacement of incandescent bulbs in
households by CFLs
Under BLY, CFLs offered at Rs. 15 in exchange of working
ICL bulbs (for residential consumers)
Tripartite agreement signed with BEE & C-Quest Capital to
implement scheme in TPDDL area
Scheme launched in October,2011. Distribution completed
at Motinagar & Mongolpuri Districts and commenced at
Shalimar Bagh & Model Town on 16-01-2012.
CFL distribution under progress (over 4.5 lakh CFLs
distributed so far)
12
Energy Efficiency Initiatives-Ongoing Projects
DFID supported Appliance Replacement
Program
•
•
•
•
•
TPDDL in association with BEE and ICF (consultant)
developed
an Appliance Replacement program for
Refrigerators and Air conditioners
DFID (A UK grant agency) agreed to fund the expenses for
Market Research, Stakeholder Workshops and Final report,
for replication across India.
Expected to be launched in March ‘12.
Under the scheme, star rated refrigerators and ACs would be
offered at the discounted rates (against the prevailing Market
Operating Prices) & existing appliances would be bought back
for the safe disposal
Target: 10,000 Refrigerators and 5,000 ACs
13
For more details, kindly contact :Jayanta.chatterjee@Tatapower-ddl.com
14
Download