RF Monitoring: 2012-2013 RF Monitoring RF Monitoring will still have its own guidance document for 2012-2013 http://www.tea.state.tx.us/index2.as px?id=2147495560&menu_id=214748 3703&menu_id2=2147483719 Staging Criteria for RF Monitoring 1. Ranking from RF Tracker Data (last year’s data) a) LRE Calculation b) Commensurate School Day c) Related Services 2. Time since last RF Monitoring On-Site Review 3. New Residential Facilities Present in the LEA 4. 2011-2012 PBMAS SPED Stage 5. History of Noncompliance in special education 6. Current Escalated Oversight 7. RF Tracker Data Quality Staging “Levels” • Based on points assigned in matrix of staging criteria (“selection rubric” – Not Staged – Stage 1 – Stage 2 – Stage 3 – Stage 4 – Stage 4A – Stage 4B Submission Window Submission Window (begins when staging is released in ISAM (likely in September) and ends on December 7, 2012* Stage 1 – will complete all documents by December 7, 2012 and retain locally • Subject to submission request by TEA PBMAS: An Evolution Staging for PBMAS • 4 program areas – BE/ESL – CTE – NCLB – SPED Staging for PBMAS (cont) • Each program area has indicators • Each indicator is assigned a performance level (“PL”) of 0, 1, 2, or 3 – PL increases from 0-3 based on variance from state “standard” or “target” • i.e., 0 = within state “standard” or “target”; PL increases as variance increases from state “standard” or “target” Staging for PBMAS (cont) • Based on the numbers of PLs 2 or 3 per program area, staging is assigned • Staging is separate for each program area – Not staged – Stage 1 – Stage 2 – Stage 3 – Stage 4 PBMAS Manual • 2012 Manual Organization – Section I: Introduction – Section II: Components of the 2012 PBMAS – Section III: BE/ESL Indicators – Section IV: CTE Indicators – Section V: NCLB Indicators – Section VI: SPED Indicators – Section VII: Appendices Section VI: SPED Indicators • Pages 82 – 119 • 18 indicators Name & Description of Indicator Indicator Calculation Minimum Size Requirements & Special Analysis Data Source for Indicator Additional Notes Performance Level Assignments/ Determinations Information regarding special analysis, etc. Standards (if applicable to the indicator) Major Changes for 2012-2013 One Guidance Document (regardless of single program or integrated interventions) http://www.tea.state.tx.us/index2.aspx?id=2147504027&men u_id=2147483703&menu_id2=2147483708 District AYP staging District AU status BE/ESL CTE NCLB/ESEA SPED* Texas Accountability Intervention System Changes for 2012-2013 One CIP, One CAP for PBMAS, AU, AYP RF still separate for 2012-2013 Improvement Plan Workbook (district) data analysis needs assessment improvement plan corrective action plan (CAP), if noncompliance is identified Submission Window Submission Window (begins when staging is released in ISAM (likely in September) and ends on December 7, 2012* Submission window is same for all staged LEAs, regardless of staging “levels” or programs Note: Earlier (October 15) “submission window” for districts who are staged for AYP/AU only Staging and Submission • If staged in two or more PBMAS program areas with no stage of intervention higher than a Stage 1, conduct all activities, complete CIP, and retain locally Texas Accountability Intervention System ISAM Updates Hot off the Press… Hot off the Press… Noncompliance Module Hot off the Press… Noncompliance Module Hot off the Press… Noncompliance Module Hot off the Press… Noncompliance Module 2012-2013 SPED Monitoring TETNs September 13, 2012 November 8, 2012 January 29, 2013 March 21, 2013 May 14. 2013 All sessions will be from 1:00-3:00 32