2012 Corporate Scorecard – Final Proposal KPI MAX TARGE SCOR T E ASSETS SCORING & COMMENTS Scoring: 5.5% per asset Safety Critical Elements (SCE) Asset 4 register verification complete and Assets implemented 22 Bahja, Yibal Oil, Qarn Comments: This exercise will ensure that all the SCEs have been Alam Gas & identified in the Asset register for all hardware barriers and are Fahud identified against their SCE group. It will also ensure that performance standards are established. Number of interior ops staff to complete role related AI-PSM 840 competences as defined by PR-1029 (60%) (Competence Assessment & Assurance) 22 SCORING: <560=0, 560=16, 630=17, 700=18, 770=19, 840=20, OND, OSD, 910=21, ≥980=22 GD & UID COMMENTS: As per minimum requirement of competency matrix Assets within PR-1029 (including electrical and instrument). Total population 1404. 22 Marmul, Fahud, Comments: This is meant to asess the adequacy & effectiveness Yibal, of the implementation of AI-PSM requirements. The audit will be SNGP, MOL/SOGL conducted using the PDO HSE Audit methodology (independently Scoring: 4.4% per asset Completion of Level 2 self assessments and cross-directorate audits 5 Assets led or supported). Scoring: ≥16=0%, 15=5%,14=10%, 13=15%, 12=20%, 11=20.5%, 10=21%, 9=21.5%, ≤8=22% High risk well integrity issues in eWIMS across PDO by year-end Assessment of RED anomalies in PACER/CIRRAS & corrective work orders established for those related to SCE. Deviations to be raised in FSR (as per PR-1983) TOTAL (Target:100) <12 22 PDO wells 0 22 All PDO 110 Comments: Any well with Action Code 9 or 10 or any Type 1 well not in compliance with the WFM or with approved deviation from standard in place. Scoring (outstanding and non-deviated reds): >10=0%, 610=14%, 1-5=18%, 0=22% Comments: Process Containment is one of the key control hardware barriers. This KPI is designed to drive behaviors in the organization not to accept RED anomalies without assessment and SAP corrective work orders and reflection in FSR. Deviation to be raised where required. TDG10th of December 2011 2012 AI-PSM KPI No. Type Scorecard KPI short Description 1 Lagging No 2 Lagging No 3 Journey Yes 4 Journey Yes 5 Leading No 6 Leading No 7 Journey Yes 8 Journey Yes KPI long description Tracking method Reporting Level Accountable Supporting Party Party Tier 1 Process Safety Count of API RP 754 Record maintained by TBC and below GD, OND, OSD, MSEM Event (PSE) Tier 1 Process Safety AIPSALT, based on UID, UWD, XD Events (PSEs) analysis of reported AIPS incidents in FIM Days since last Tier 1 Time since last API RP Record maintained by TDG and below GD, OND, OSD, MSEM Process Safety Event 754 Tier 1 Process AIPSALT, based on UID, UWD, XD Safety Events analysis of reported AIPS incidents in FIM High Risk Wells Number of high risk eWIMS reporting TBC and below GD, OND, OSD, UPD well integrity issues in UID, XD eWIMS Red Anomalies in Number of RED PACER/CIRRAS TBC and below GD, OND, OSD, UEOD PACER anomalies in download UID PACER/CIRRAS. SCE PM Compliance Technical Integrity Existing KPI TDG and below GD, OND, OSD, UEOD Planned Maintenance UID Compliance (% completed against plan) SCE CM Compliance Technical Integrity Existing KPI TDG and below GD, OND, OSD, UEOD Corrective UID Maintenance Compliance (% completed against plan) SCE Asset Register % completion of asset UOIM asset register TDG and below GD, OND, OSD, UEOD Verification register verification verification project UID project (by asset) status report AI-PS As Built Drawing % completion of asProject status TDG and below GD, OND, OSD, UEOD Updates built drawing update reported by asset UID project (by asset) operations support team Minimum Frequency Quarterly AI-PS Element Quarterly Incident Reporting & Investigation Quarterly Technical Integrity Quarterly Technical Integrity Quarterly Technical Integrity Quarterly Technical Integrity Quarterly Process Safety Knowledge Quarterly Process Safety Knowledge Incident Reporting & Investigation TDG10th of December 2011 2 2012 AI-PSM KPI (Continue) 9 Journey No 10 Journey No 11 Leading Yes 12 Leading Yes 13 Leading No 14 Leading No 15 Leading No Record maintained by TDG and below % overdue AI-PS actions of open AI-PS AIPSALT, based on analysis of open PSBR actions actions in AI-PS Action Tracking Tool TDG and below Project status % completion of Ex EX Equipment reported by UIE Equipment Verification and support team Verification and Restoration Restoration project (by asset) Record maintained by TBC and below % of interior AI-PS Training operations staff with AIPSALT, based on Compliance analysis of training completed role records & plan related AI-PSM competences as defined by PR-1029 TBC and below Milestone completion Operations: Record AI-PS Level 2 Assurance Compliance of AI-PS Level 2 Cross- maintained by Directorate Audit (by AIPSALT, based on compliance to asset AIasset) PS assurance plan TDG and below TR-MIE IA Calculative TR-MIE IA Calculative Operations: Record Assessment result (by maintained by Assessment AIPSALT, based on asset) compliance to asset AIPS assurance plan TDG and below Process Safety Review Milestone completion Operations: Record maintained by of Process Safety Compliance AIPSALT, based on Review (by asset) compliance to asset AIPS assurance plan TDG and below Statement of Fitness Milestone sign-off of Operations: Record Statement of Fitness maintained by Compliance AIPSALT, based on (by asset) compliance to asset AIPS assurance plan PSBR Action Closure (including Alarm Rationalisation) GD, OND, OSD, UEOD UID Quarterly Process Safety Knowledge GD, OND, OSD, UEOD UID Quarterly Process Safety Knowledge GD, OND, OSD, UEOD UID Quarterly Technical Integrity GD, OND, OSD, MSEM, UEOD UID Quarterly Assurance GD, OND, OSD, UEOD UID Quarterly Technical Integrity GD, OND, OSD, MSEM, UEOD UID Quarterly HEMP GD, OND, OSD, MSEM, UEOD UID Quarterly HEMP TDG10th of December 2011 3