ANGUS BIOFUELS

UNIT 1 – ECO PARK
CARSEVIEW ROAD
FORFAR DD8 3BS

FUEL SUPPLIERS






BILL WATSON
TEL: 01307 466699
FAX: 01307 462278
E-MAIL:- [email protected]
ANGUS BIOFUELS
MAIN BUSINESS ACTIVITIES
 FORESTRY OWNER

WOODCHIP PRODUCER

BOILER INSTALLATION

HEAT SUPPLY CONTRACTS
BIOMASS PLANT

SITUATED AT DRAGONHALL FARM,
PADANARAM, BY FORFAR

OPENED BY JOHN SWINNEY

PROJECT COSTS: £1.2 MILLION
ISSUES IN SETTING UP PLANT








LOCATION TO TIMBER SUPPLY
LOCATION TO BOILERS
CAPITAL COST
GRANT ASSISTED BY SSBS
QUALITY OF CHIP
MOISTURE CONTENT OF CHIP
SIZE OF CHIP
HANDLING OF WOOD FROM FOREST TO
BOILER
BIOMASS PRODUCTS

WOOD CHIPS – WET - ABOVE 30% M.C.

WOOD CHIPS – DRY – BELOW 25% M.C.

WOODCHIPS DRIED BY –
NATURAL DRYING
ARTIFICIAL DRYING
CHIPPERS

HEIZOHACK 400 SCREEN CHIPPER

JUNKKARI 500 DRUM CHIPPER

JENZ 561 CHIPPER
STORAGE OF TIMBER/CHIP

AIR DRYING
= 5000 TONNES

AT ROADSIDE
= 3000 TONNES

DRY CHIP
= 2000 TONNES
WOODCHIP OUTPUT
MAXIMUM OUTPUT =
100 TONNES OF DRY CHIP PER DAY
I.E. 400,000 kWhrs OF HEAT
TYPICAL HOUSE WILL USE APPROX 100 kWhrs
TYPICAL PRIMARY SCHOOL WILL USE APPROX
5000 kWhrs
DELIVERY OF WOODCHIP





ARTICULATED LORRY
HI-LIFT TRAILER
BULK TRAILER
BLOWER TRAILER
BULK BAGS
BOILER INSTALLATIONS
CHOICE BETWEEN –
WOODCHIP OR WOOD PELLET
DRY WOODCHIP – LESS THAN 25% MC
 GENERALLY LARGER INSTALLATIONS
 LARGER FUEL STORAGE FACILITIES
 LOWER FUEL COSTS THAN PELLETS
AT PRESENT. AROUND 3.5p/kWhr
 LONG SHELF LIFE
WET WOODCHIP- ABOVE 30% M.C.
 VERY LARGE BOILERS & POWER
STATIONS
 MORE DELIVERIES PER ANNUM
 MORE CONTAMINATION
 SHORT SHELF LIFE DUE TO
COMPOSTING & MOULDING
 PRICE SIMILAR TO DRY WOODCHIP
WOOD PELLETS





IDEAL FOR SMALLER BOILER
INSTALLATIONS
LESS BULKY
MORE EXPENSIVE – AROUND 4.5p/kWhr
CAN BREAK DOWN IF GET DAMP OR
WET
LIMITED SHELF LIFE
BOILERS INSTALLED – 10KW TO 600KW







BINDER
FROELING
VETO
CALIMAX
JANFIRE
SONNYS
GILLIES – Under consideration
CHOOSING A BOILER







WHAT SIZE DO I NEED AND WHEN DO I
NEED HEAT?
HOW SOPHISTICATED DO I NEED?
FUEL STORAGE AND DELIVERY?
BACK-UP SERVICE?
GO AND LOOK AT INSTALLED EXAMPLES
ASK QUESTIONS
DOES IT COMPLY WITH THE LOCAL
ENVIRONMENTAL CRITERIA?
HEAT SUPPLY CONTRACTS
FACTORS TO CONSIDER
 COST OF BOILER AND INFRASTRUCTURE
 PRICE FOR FUEL
 COST OF DELIVERY
 COST OF MAINTENANCE
 COST OF CLEANING/DE-ASHING
 SINKING FUND
 PROFIT
THANK YOU.
