ANGUS BIOFUELS

PRESENTATION

FORESTRY ENGINEERING GROUP

8

TH

SEPTEMBER 2011

ANGUS BIOFUELS

UNIT 1 – ECO PARK

CARSEVIEW ROAD

FORFAR DD8 3BS

FUEL SUPPLIERS

BILL WATSON

TEL: 01307 466699

FAX: 01307 462278

E-MAIL:- bill@ballindarg.co.uk

ANGUS BIOFUELS

MAIN BUSINESS ACTIVITIES

FORESTRY OWNER

WOODCHIP PRODUCER

BOILER INSTALLATION

HEAT SUPPLY CONTRACTS

BIOMASS PLANT

SITUATED AT DRAGONHALL FARM,

PADANARAM, BY FORFAR

OPENED BY JOHN SWINNEY

PROJECT COSTS: £1.2 MILLION

ISSUES IN SETTING UP PLANT

LOCATION TO TIMBER SUPPLY

LOCATION TO BOILERS

CAPITAL COST

GRANT ASSISTED BY SSBS

QUALITY OF CHIP

MOISTURE CONTENT OF CHIP

SIZE OF CHIP

HANDLING OF WOOD FROM FOREST TO

BOILER

BIOMASS PRODUCTS

WOOD CHIPS – WET - ABOVE 30% M.C.

WOOD CHIPS – DRY – BELOW 25% M.C.

WOODCHIPS DRIED BY –

NATURAL DRYING

ARTIFICIAL DRYING

CHIPPERS

HEIZOHACK 400 SCREEN CHIPPER

JUNKKARI 500 DRUM CHIPPER

JENZ 561 CHIPPER

STORAGE OF TIMBER/CHIP

AIR DRYING

DRY CHIP

= 5000 TONNES

AT ROADSIDE = 3000 TONNES

= 2000 TONNES

WOODCHIP OUTPUT

MAXIMUM OUTPUT =

100 TONNES OF DRY CHIP PER DAY

I.E. 400,000 kWhrs OF HEAT

TYPICAL HOUSE WILL USE APPROX 100 kWhrs

TYPICAL PRIMARY SCHOOL WILL USE APPROX

5000 kWhrs

DELIVERY OF WOODCHIP

 ARTICULATED LORRY

 HI-LIFT TRAILER

 BULK TRAILER

 BLOWER TRAILER

 BULK BAGS

BOILER INSTALLATIONS

CHOICE BETWEEN –

WOODCHIP OR WOOD PELLET

DRY WOODCHIP – LESS THAN 25% MC

GENERALLY LARGER INSTALLATIONS

LARGER FUEL STORAGE FACILITIES

LOWER FUEL COSTS THAN PELLETS

AT PRESENT. AROUND 3.5p/kWhr

LONG SHELF LIFE

WET WOODCHIP- ABOVE 30% M.C.

VERY LARGE BOILERS & POWER

STATIONS

MORE DELIVERIES PER ANNUM

MORE CONTAMINATION

SHORT SHELF LIFE DUE TO

COMPOSTING & MOULDING

PRICE SIMILAR TO DRY WOODCHIP

WOOD PELLETS

IDEAL FOR SMALLER BOILER

INSTALLATIONS

LESS BULKY

MORE EXPENSIVE – AROUND 4.5p/kWhr

CAN BREAK DOWN IF GET DAMP OR

WET

LIMITED SHELF LIFE

BOILERS INSTALLED – 10KW TO 600KW

BINDER

FROELING

VETO

CALIMAX

JANFIRE

SONNYS

GILLIES – Under consideration

CHOOSING A BOILER

WHAT SIZE DO I NEED AND WHEN DO I

NEED HEAT?

HOW SOPHISTICATED DO I NEED?

FUEL STORAGE AND DELIVERY?

BACK-UP SERVICE?

GO AND LOOK AT INSTALLED EXAMPLES

ASK QUESTIONS

DOES IT COMPLY WITH THE LOCAL

ENVIRONMENTAL CRITERIA?

HEAT SUPPLY CONTRACTS

FACTORS TO CONSIDER

COST OF BOILER AND INFRASTRUCTURE

PRICE FOR FUEL

COST OF DELIVERY

COST OF MAINTENANCE

COST OF CLEANING/DE-ASHING

SINKING FUND

PROFIT

THANK YOU.