8. Installation

advertisement
v2a – S&S EaA
External 28-Mar-2006
ROUND THE WORLD ROUND THE CLOCK
www.dma-marine.com
DMA Fuel Change-over
and MGO Cooling System
For Retrofit and Newbuilding
REV2011041001
Engineering –Production –Installation –Commissioning
Specialist in Marine and Offshore HVAC Systems
1
Agenda
1. DMA introduction
2. Background
3. Process of HFO/MGO change over
4. Principle of MGO cooler system
5. Scope of Supply for DMA MGO System
6. Engineering and Design
7. Production and Fabrication
8. Installation
9. Commissioning
2
1. DMA Introduction
• DM Alscott
• Factory established in 2003
• JV established in 2008
Together, we do more.
3
2. Background
IMO have ratified 200 NM of the North American coastline as a SECA area by the Aug. 2012
– 0.1% Sulphur effective from January 1st 2015
4
2. Background
5
3. Process of HFO/MGO change over
Change-over valve
Preferential position for Cooler
Optional position for Cooler
6
3. Process of HFO/MGO change over
1. Regulate the index of engine, around 25~40%.
2. Shut off steam tracing & steam to pre-heater.
3. Monitor viscosity: 2 cSt ~ 20 cSt.
4. ViscoSense (4~20mA) signal
input the control box of DMA cooling system.
5. Start DMA cooling system, the chilled water is available in stand-by.
6. Initiate the change-over on touch screen from HFO to MGO.
Then the MGO will add into circulating line gradually.
7. The rate of temperature drop of fuel inlet to the circulating line is controlled
to not exceed 2℃ per minute.
8. MGO cooler is ready to cool the fuel oil per the viscosity of fuel oil in
circulating line.
7
4. Principle of MGO Cooler System
Basing on P&ID, the 3-way Valve is installed in the cooling water
line, whereas the Temperature Sensor is mounted at the Plate
Heat Exchanger oil outlet.
The temperature of fuel outlet will be controlled by the Controller.
8
5. Scope of Supply for DMA MGO SYS.
5.1. Fuel change-over valve
5.2. Chiller unit
5.3. Pump unit
5.4. Buffer tank
5.5. PHE Cooler unit
5.6. Accessories
9
5. Scope of Supply for DMA MGO SYS.
Fig. 5.1 Change-over Valve
10
5. Scope of Supply for DMA MGO SYS.
Fig. 5.2 Marine Water-Cooled Chiller
11
5. Scope of Supply for DMA MGO SYS.
Fig. 5.3 Water Pump Unit
12
5. Scope of Supply for DMA MGO SYS.
Fig. 5.4 Buffer Tank
13
5. Scope of Supply for DMA MGO SYS.
Fig. 5.5 Fuel Oil Cooler Unit
14
6. Engineering and Design
6.1. Capacity calculation by Software
15
6. Engineering and Design
6.2. P&ID
16
6. Engineering and Design
6.3. Program for MGO change-over
17
7. Production and Fabrication
7.1. Factory
18
7. Production and Fabrication
7.2. Assembly, Painting, Store
19
8. Installation
8.1. Finding place for plants on vessel
20
8. Installation
8.2. Finding place for control box
21
8. Installation
8.3. Finding cooling-water source for chiller sys.
22
8. Installation
8.4. Finding fresh-water source for chiller sys.
23
8. Installation
8.5. Making foundation for plants
24
8. Installation
8.6. Rigging and mounting
25
8. Installation
8.7. Finding cutting points for AE
26
8. Installation
8.8. Finding cutting point for ME
27
8. Installation
8.9. Making isolated and bypass valves for fuel pump
28
8. Installation
8.10. Connecting fuel piping
29
8. Installation
8.11. Connecting water piping
30
8. Installation
8.12. Making insulation for fuel piping
31
8. Installation
8.13. Routing cable for plants
32
8. Installation
8.14. Mounting change-over valve
33
8. Installation
8.15. Mounting change-over valve
34
9. Commissioning
9.1. Checking wiring
35
9. Commissioning
9.2. Signing check list by Owner
36
9. Commissioning
9.3. Signing check list by Owner
37
9. Commissioning
9.4. Signing check list by Owner
38
www.dma-marine.com
Thanks for your interest in DMA.
For more information,
Please visit our Website :
Website: www.dma-marine.com
39