Generation Capacity Addition in Electricity Sector in India 1 1 Presentation by NTPC at FOIR Workshop - October 20, 2013 29 MARCH 2010 Agenda Overview of NTPC Installed Generation Capacity in India Plan wise Growth Power Supply Scenario Demand Forecast Capacity Addition Target Capacity Addition Achieved 2 NTPC Limited An overview 3 Journey so far Coal Gas Total 11333 11333 20249 20249 200 9900 1433 1982 1992 16294 3955 2002 1975 1997 2004 NTPC incorporated (100% GoI) Became a Navratna Company Listed on Indian Stock Exchanges (89.5% GoI) 41684 + 10 5895 MW Solar 35279 35779 Growth of Capacity - MW Today 2013 2010 • Maharatna status • GOI further divested 5% 4 Well Diversified Power Maharatna Power Generation Power Trading Total installed capacity of 41,684 MW including 5364 MW through JVs 20,079 MW under construction First hydro capacity to be commissioned in this fiscal 10 MW solar plant has been already commissioned. Also developing other renewable energy projects, such as wind and solar. Global footprint in Bangladesh and Srilanka through JVs Also appointed for power supply to Bangladesh and nodal agency for trading power with Bhutan 5 Well Diversified Power Maharatna Power Equipment JVs for manufacturing power equipments, castings, forgings, high voltage equipment and Balance of Plant (BoP) equipment for Indian and International markets Electricity distribution business through NESCL Consultancy services to SEBs, State Generating Companies and other private companies 5 MTPA LNG Terminal at Dabhol through JV Others Mining & Oil Exploration 10 coal mining blocks awarded to NTPC by GoI 95 MTPA coal will be mined from these blocks. Awarded oil exploration blocks 6 National /Global Ranking The largest Power Generator in India Third largest Power Generator in Asia Tenth largest power generator in the world No.1 IPP in world (Platts-250 ranking–2012) 337th largest company in the world (FORBES – 2012) Ranked 3rd Best Company to Work For in India (Economic Times and Great Places to Work Institute2012) Source: Platts, Forbes, International Consultant, CEA 7 Group NTPC Power Generation NTPC Limited Power Trading Power Distribution Power Equipment Manufacturing Power Services Coal Mining 21 Joint Ventures and 5 Subsidiaries For Synergistic Business Diversification 8 Power Generation Services Equipment Manufacturing NTPC Hydro Ltd. (100%) NTPC Electric Supply Company Ltd. (100%) NTPC BHEL Power Projects Pvt. Ltd. (50%) Kanti Bijlee Utpadan Nigam Ltd. (64.57%) Utility Powertech Ltd. (50%) BF NTPC Energy Systems Ltd. (49%) NTPC Alstom Power Services Pvt. Ltd. (50%) National High Power Test Laboratory Pvt. Ltd. (25%) Transformers and Electricals Kerala Ltd. (44.6%) Bhartiya Rail Bijlee Company Ltd. (74%) Aravali Power Company Pvt. Ltd. (50%) NTPC Tamil Nadu Energy Company Ltd. (50%) Nabinagar Power Generating Company Pvt. Ltd. (50%) Energy Efficiency Service Limited (25%) 5 Subsidiaries Coal Acquisition International Coal Ventures Pvt. Ltd. (14.28%) NTPC SCCL Global Ventures Pvt. Ltd. (50%) Power Trading NTPC Vidyut Vyapar Nigam Ltd. (100%) National Power Exchange Ltd. (16.67%) CIL NTPC Urja Private Ltd. (50%) 21 Joint Ventures Meja Urja Nigam Pvt. Ltd. (50%) NTPC SAIL Power Company Pvt. Ltd. (50%) Ratnagiri Gas and Power Pvt. Ltd. (30.17%) Anushakti Vidhyut Nigam Ltd. (49%) Trincomalee Power Company Ltd. (50%) Pan Asian Renewables Pvt. Ltd. (50%) Bangladesh India Friendship Power Company (Pvt.) Ltd. (50%) NTPC has set up subsidiaries and JVs to pursue its growth objectives 9 Turnaround of acquired from SEBs 199 2 199 5 200 0 ASIAN POWER PLANT OF THE YEAR AWARD 2006 BY ASIAN POWER MAGAZINE TO FEROZE GANDHI UNCHAHAR TPS Talcher power station has an average life of ~38 years 10 Robust project management translating to record capacity addition Unit Commissioning (Achieving Full Load) Time in Months from investment approval Commissioned 2490 MW in FY11-12 Commissioned 4160 MW in FY 12-13 JICA President’s award and IPMA award for Simhadri project IPMA award for Dadri Project Stage-II (2011), Vindhyachal-III (2008) IPMA award finalist – Talcher-II (2006) and Ramagundam-III (2006) 11 NTPC’s growth through the years 1 Capacity (NTPC Group) Generation (NTPC Standalone) MW Units in Billions Profit after Tax Total Revenue1 Rs. Crore Rs Crore 12 12 Human Capital – Continuously Improving Productivity Ranked 3rd in the Aon Hewitt Best Employers in India 2012 Sales Per Employee PAT Per Employee 2012 Generation Per Employee FY07 FY12 Rs.1.38 Crs Rs. 2.30 Crs Up 67% Rs 0.29 Crs Rs. 0.38 Crs Up 31% 7.99 MUs 9.27 MUs Up 16% 10% Talent pool of ~25,000 employees Planned interventions at various stages of career Power Management Institute (PMI) – Playing a pivotal role in individual and organizational learning. Leadership Development Centre to identify and groom potential leaders. 13 Training Simulators for 660 MW / 500 MW / 200 MW coal and gas based plants 2012-13: The year of records 4,170 MW capacity added 4,830 MW declared commercial 8,576 MW awarded Rs. 19,925 crores of CAPEX Rs 11,500 Cr (48% of total disinvestment) raised through OFS for GoI. Oversubscribed 1.7 times. 45% 14 14 Planning for Accelerated Growth Today 41684MW 2032 ~ 128000 MW Coal Gas Nuclear Hydro Renewables Capacity under construction – 20079 MW Going High on Generation-Lower GHG 15 15 Generation Capacity Addition in Indian Power Sector 16 Installed Generation Capacity RES, 28184, 12% Nuclear, 4780, 2% Hydro, 39788, 17% Thermal, 155968, 69% Installed Capacity as on 30.09.2013 – 2,28,722 MW Thermal Hydro Nuclear RES Source: CEA 17 Installed Generation Capacity Central, 65732, 29% Private, 72926, 32% Central State Private State, 90062, 39% Installed Capacity as on 30.09.2013 – 2,28,722 MW Source: CEA Private sector’s share has increased from around 15% to 32% in last 5 years. 18 Growth in Generation Capacity (Plan-wise) Installed Capacity at the end of Plan ( in MW) 250,000 223,344 199,877 200,000 150,000 132,329 105,046 100,000 85,795 63,637 42,585 50,000 2,886 4,653 9,027 1st Plan 2nd Plan 3rd Plan 16,663 26,680 0 4th Plan 5th Plan 6th Plan 7th Plan 8th Plan 9th Plan 10th Plan 11th Plan 2012-13 Source: CEA 19 Power Supply Scenario PEAK Year ENERGY Requirement Shortage Requirement (MW) (%) (BU) Shortage (%) 2010-11 1,22,287 9.8 861.591 8.5 2011-12 1,30,006 10.6 937.199 8.5 2012-13 1,35,453 9.0 998.114 8.7 Source: CEA Shortage scenario is likely to continue in near future 20 Demand Forecast – 18 EPS Demand forecast 2012-13 2013-14 2016-17 2021-22 2026-27 2031-32 Energy Requirement at power station bus bar (BU) 985 1066 1355 1905 2710 3710 Peak load at power station bus bar (GW) 139.682 152.329 199.54 283.47 400.71 541.82 Source: 18th Electric Power Survey of India Actual Peak Demand met in 2012-13 was 123.294 GW CAGR of energy requirement projected for 2009-17 translates to 8.55% 21 Working Group on Power – XII plan Fuel Thermal XII Plan 63781 XIII Plan 63400 Hydro 9204 12000 Nuclear 2800 18000 75715 93400 Total Source: Working Group on Power – 12th Plan Working Group on Power for XII Plan had estimated capacity addition requirement of 75,785 MW during XII Plan and 93,400 MW during XIII Plan corresponding to 9% GDP growth In addition capacity addition of 18500 MW during XII plan and 30500 MW during XIII Plan has been estimated from RES. 22 Capacity Addition Target – XII plan In order to reduce gap between peak demand and peak deficit and to provide for faster retirement of old inefficient plants, capacity addition target for XII Plan has been enhanced to 88,537 MW (excluding RES) by the Planning Commission. In addition, 30,000 MW of capacity addition from RES (Wind – 15000 MW, Solar – 10000 MW, Small Hydro – 2100 MW and Biomass – 2900 MW) has been targeted for the XII Plan Since the growth rate of GDP for the XII Plan is likely to be 8.2% and not 9%, the target for capacity addition contain an element of slack of about 10%. 23 Capacity Addition Target –XII Plan (in MW) Sector Hydro Thermal Nuclear Total Central 6004 14878 5300 26182 State 1608 13922 0 15530 Private 3285 43540 0 46825 Total 10897 72340 5300 88537 Source: Planning Commission, 12th Plan Document 24 Thank you