BESCOM Profile
Bangalore Electricity Supply Company Limited (BESCOM) is Power
Utility distributing electricity across 8 districts viz.,
Population Base : 2.07 Cr
Consumer Base : 79 Lakhs
Distribution
Districts
Peak
Load
Requirem
ent (MW)
Energy
Require
ment
(MU )
Bangalore Urban
2100
41
Bangalore Rural
365
7.13
Ramanagar
100
1.95
Kolar
275
5.37
Chikkaballapura
245
4.78
Tumkur
495
9.66
Chitradurga
230
4.49
Davanagere
290
5.66
Demand & Supply (2011-2013)
Energy Consumption(2011-2013)
Energy Consumption (2011-2013)
For 2012-13 :
Initially proposed by BESCOM: 32,193 MUs.
Approved by KERC: 31,305 MUs.
Consumption till date(17th Feb-2013) : 24,576 MUs.
Balance Upto end of March-2013 : 6,729 Mus(Adequate).
Reasons for Shortages / Gap
1.Low Wind Energy Generation : means no ‘reserve’ available
2. Unforeseen shut downs of thermal generating units at RTPS (Raichur)
MW
: 150
3.10 % Unforeseen shutdowns in CGS (Central Generating Station) share to the
state : 150 MW
Total Shortage of Load Expected : 300 MW
How BESCOM will close the GAP ?
1. Strict measures to stop illegal conversion of Single Phase to 3 Phase
by IP Set owners and excess consumption [Open Delta] : 210 MW
2.Vigilance Activities : 60 MW
3. Shifting of Peak Load : 30 MW ( From 6 PM to 9 PM to beyond 9 PM)
Open Delta System
1. Open Delta System is a scheme which avoids illegal use of power
supply to IP Sets. Thus there won’t be overloads or excess drawl
from the network.
2. Effective Implementation saves 210 MW
Open Delta Configuration
Vigilance Activities : 60 MW
1. Strengthening of BESCOM Vigilance network by providing 30
additional vehicles & staff .
2. Extra Vigilance during peak hours and at night : to have check
on illegal welding, lights, theft etc.,
3. Both Special Vigilance Team & BESCOM Officers will be on
strict vigil. Expected to do : 1500 inspections / Everyday.
Load Shifting : 30 MW
1. BESCOM would request consumers to shift the use of major
loads like Water pumps, Geysers etc., from peak to non- peak
hours ( after 10 PM)
2. BESCOMs brand ambassador will promote conservation, and load
shifting activities like above.
Rural Power Supply Schedule during summer
8 SLOTS of 3 HRS DURATION
Batches
B1
B2
B3
6 am - 9 am - 12 noon 3 pm - 6 pm - 9 pm - 12 am - 3 am 9 am 12 noon - 3 pm 6 pm 9 pm 12 am 3 am 6 am
Single
3
Phase Phase
Single
Phase
Single
Phase
OFF
OFF
3
Phase
OFF
OFF
OFF
Open
3
Single
Delta Phase Phase
Open
Delta
3
Open
Phase Delta
OFF
3 Phase : 3 Phase Power Supply
Single Phase: Single Phase Power Supply
Open Delta: Open Delta Power supply
OFF : No Power Supply
Single
3
Phase Phase
Single Single
Phase Phase
Single
Phase
Single
Phase
3
Phase
Batches B1,B2, B3 will
not have same timings,
the batches will be
intimated by issuing
pamphlets.
Reduction in Power Outages in past 5 years
In Case of any grievances ! Reach us
1. Online Complaint Registration
Log onto www.bescomhelpline.com to register your complaint
2. 24×7 SMS Facility
Just type BESCOM <Space> Subdivision code<space> nature of
complaint and send it to 92431 50000
3. 24×7 Helpline
Call to BESCOMs 24X7 Customer Helpline (080-22873333)-(25 lines are there)