Bangalore Electricity Supply Company Limited Summer Plan: 2013 (1st March – 31st May) Prepared by Mr. Mahadev, Chief General Manager, Operations Approved by Managing Director 21st, February, 2013. BESCOM Profile Bangalore Electricity Supply Company Limited (BESCOM) is Power Utility distributing electricity across 8 districts viz., Population Base : 2.07 Cr Consumer Base : 79 Lakhs Distribution Districts Peak Load Requirem ent (MW) Energy Require ment (MU ) Bangalore Urban 2100 41 Bangalore Rural 365 7.13 Ramanagar 100 1.95 Kolar 275 5.37 Chikkaballapura 245 4.78 Tumkur 495 9.66 Chitradurga 230 4.49 Davanagere 290 5.66 Demand & Supply (2011-2013) Energy Consumption(2011-2013) Energy Consumption (2011-2013) For 2012-13 : Initially proposed by BESCOM: 32,193 MUs. Approved by KERC: 31,305 MUs. Consumption till date(17th Feb-2013) : 24,576 MUs. Balance Upto end of March-2013 : 6,729 Mus(Adequate). Reasons for Shortages / Gap 1.Low Wind Energy Generation : means no ‘reserve’ available 2. Unforeseen shut downs of thermal generating units at RTPS (Raichur) MW : 150 3.10 % Unforeseen shutdowns in CGS (Central Generating Station) share to the state : 150 MW Total Shortage of Load Expected : 300 MW How BESCOM will close the GAP ? 1. Strict measures to stop illegal conversion of Single Phase to 3 Phase by IP Set owners and excess consumption [Open Delta] : 210 MW 2.Vigilance Activities : 60 MW 3. Shifting of Peak Load : 30 MW ( From 6 PM to 9 PM to beyond 9 PM) Open Delta System 1. Open Delta System is a scheme which avoids illegal use of power supply to IP Sets. Thus there won’t be overloads or excess drawl from the network. 2. Effective Implementation saves 210 MW Open Delta Configuration Vigilance Activities : 60 MW 1. Strengthening of BESCOM Vigilance network by providing 30 additional vehicles & staff . 2. Extra Vigilance during peak hours and at night : to have check on illegal welding, lights, theft etc., 3. Both Special Vigilance Team & BESCOM Officers will be on strict vigil. Expected to do : 1500 inspections / Everyday. Load Shifting : 30 MW 1. BESCOM would request consumers to shift the use of major loads like Water pumps, Geysers etc., from peak to non- peak hours ( after 10 PM) 2. BESCOMs brand ambassador will promote conservation, and load shifting activities like above. Rural Power Supply Schedule during summer 8 SLOTS of 3 HRS DURATION Batches B1 B2 B3 6 am - 9 am - 12 noon 3 pm - 6 pm - 9 pm - 12 am - 3 am 9 am 12 noon - 3 pm 6 pm 9 pm 12 am 3 am 6 am Single 3 Phase Phase Single Phase Single Phase OFF OFF 3 Phase OFF OFF OFF Open 3 Single Delta Phase Phase Open Delta 3 Open Phase Delta OFF 3 Phase : 3 Phase Power Supply Single Phase: Single Phase Power Supply Open Delta: Open Delta Power supply OFF : No Power Supply Single 3 Phase Phase Single Single Phase Phase Single Phase Single Phase 3 Phase Batches B1,B2, B3 will not have same timings, the batches will be intimated by issuing pamphlets. Reduction in Power Outages in past 5 years In Case of any grievances ! Reach us 1. Online Complaint Registration Log onto www.bescomhelpline.com to register your complaint 2. 24×7 SMS Facility Just type BESCOM <Space> Subdivision code<space> nature of complaint and send it to 92431 50000 3. 24×7 Helpline Call to BESCOMs 24X7 Customer Helpline (080-22873333)-(25 lines are there) Thank You