An introduction to borehole surveying Who need surveys anyway? Run an electronic multi-shot survey tool Without cables, batteries or computers With its own QA system Look at some survey results Observe the effects of borehole deviation Borehole Surveys WHERE DID THAT DRILLHOLE GO? slide 1 ENCORE FLEXIT SmartTool Survey System ENCORE Borehole Surveys ENCORE Borehole Surveys WHERE DID THAT DRILLHOLE GO? Without surveys, you could lose your deposit MINES & QUARRYS Exploration; coring, RAB and RC Orebody definition coring Drill & Blast development Production blasting Raisebore pilots DRILLING IS INFORMATION TECHNOLOGY, MAXIMISE IT WITH slide 3 FLEXIT Without surveys, the ground isn’t engineered GROUND ENGINEERING Site investigation Grout curtains Ground anchors Compensation grouting Drill & Blast tunnelling DRILLING IS INFORMATION TECHNOLOGY, MAXIMISE IT WITH slide 4 FLEXIT Operating the FLEXIT MultiSmart For a multi-shot drillhole survey, you need:The SmartTool 1 SensIT in hole probe {NO film, batteries or cables } 2 StoreIT pocket data pad {NO stopwatch or notes } 3 An office PC with the MeasureIT and DisplayIT software Some Running Gear 3 Shock sub, pressure barrel & aluminium sinker bars 4 Wireline, rods, pipe or rope to run SensIT into the hole slide 5 Drillsite Details 5 Hole reference and measurement depth slide 6 SensIT in an AusMine running gear kit Start the survey with the StoreIT data pad 1 Switch ON StoreIT 2 Use SETTINGS to enter:Hole reference number Start station depth (say, 250m) Station depth interval (say, 6m) Survey direction (say, up) 3 Press DATA to confirm entries 5 SensIT is now taking a reading every 5 secs slide 7 4 Press NEW to start SensIT, using the radio chip Preparing SensIT for running into the hole 1 Place SensIT in the pressure barrel, supported by the spring hanger 2 Lubricate O-rings. Tighten threads by hand 3 Tong up running gear threads 4 Run SensIT to survey start station depth; hold it still. Spear-type landing collar Totally sealed SensIT probe Top sub assembly Bottom sub with shock assembly slide 8 3 x 1.5m aluminium spacer bars Taking the first shot with StoreIT 1 Switch ON StoreIT 2 Screen will show Depth 250 m Press OK depth) Press & hold OK until StoreIT peeps. Measuring Wait ..5 secs (counting down) slide 9 3 (start Taking the next shot with StoreIT 1 Wait until StoreIT peeps again and screen shows Depth 244 m(start Press OK depth-6m) 2 Move SensIT up 6m to the 244 m station 3 Press and hold OK until StoreIT peeps. (counting down) slide 10 Measuring Wait ..5 secs Continuing the survey with StoreIT During a survey use SETTINGS to: Change station depth Change station interval Redo or duplicate a station End the survey Start a new survey slide 11 while SensIT is down the hole Completing the survey with StoreIT 1 Use SETTINGS to:- End Survey? Press OK 2 Press and hold OK until StoreIT peeps. 3 Pull running gear out of the hole, remove SensIT from pressure barrel & place slide 12 within 10m of StoreIT. Transfer data from SensIT to StoreIT 1 Use SETTINGS to:- End Session? Press OK Press & hold OK until StoreIT peeps. Downloading Record No. # (counting) 3 Wait until download is complete 4 Switch OFF StoreIT slide 13 2 Download data from StoreIT to a PC 1 Connect TransIT aerial to your PC serial port 2 Switch ON StoreIT 4 The radio link and software do the rest! slide 14 3 Run MeasureIT software; click Download Quality Check system guarantees results • Checks for tool movement • Allows you to delete or adjust unreliable readings • See the MagIC presentation slide 15 • Checks for magnetic disturbance How would you like to see the results? A tabulation for each station of up to 17 measurements. Choose only the ones you want. A true plot of the hole in plan, E/W or N/S sections Choose the scale, colours, marks, grid spacing Any number of holes, collar extension on/off Supplementary data plotted against hole path Max/min hole separation Exported to any other software slide 16 slide 17 How would you like to see the results? slide 18 How would you like to see the results? Some typical readings from a “vertical” hole Note: Four degree change in dip over first 2 metres Remainder of hole is relatively straight. Total slide 19 error of 1.13 metres (6%) at 16 metres depth Borehole interference in Civils projects Surveying will prove the integrity of reinforcement programs MeasureIT warns you when hole separation exceeds set limits It’s so simple with FLEXIT slide 20 Six inclined grout holes are collared at 150 deg. to allow for known RH deviation; see 2, 4 & 6. Unfortunately 1, 3 & 5 hadn’t read the script! slide 21 Displaying hole paths on a PC slide 22 It’s so simple with FLEXIT slide 23 Keep in touch with product news at <http://www.flexit.se> Blast data Ampang Quarry Malaysia Rock type Granite Bench height 18 m Drill-hole diameter Ø89 mm Drill pattern 3x3 m2 Explosives Emulite 150 5 kg/hole ANFO 70 kg/hole 0.46 kg/bm3 Photo: S.O. Olofsson slide 24 Powder factor I’ve just run a MultiSmart so I know where that drillhole went! ENCORE Borehole Surveys