• Given a P&ID, Describe the revision tracking procedure used for P&IDs with 90% accuracy – Given a P&ID, identify the revision number and the number of changes made to the drawing with 90% accuracy – Given a P&ID, identify how new revisions are identified by selecting 4 out of 5 new revisions – Given a P&ID, identify how old revisions are identified by selecting 4 out of 5 old revisions • Revisions are the recording of changes on a drawing • Revisions are marked by triangles with the revision number • Must current revisions are surrounded by a cloud • Revision notes are added to the Notes Block • Revisions are approved and initialed in the Revision block