Module 3

advertisement
• Given a P&ID, Describe the revision tracking
procedure used for P&IDs with 90% accuracy
– Given a P&ID, identify the revision number and
the number of changes made to the drawing
with 90% accuracy
– Given a P&ID, identify how new revisions are
identified by selecting 4 out of 5 new revisions
– Given a P&ID, identify how old revisions are
identified by selecting 4 out of 5 old revisions
• Revisions are the recording of changes on a
drawing
• Revisions are marked by triangles with the
revision number
• Must current revisions are surrounded by a
cloud
• Revision notes are added to the Notes Block
• Revisions are approved and initialed in the
Revision block
Download