Dolomite extraction from a new quarry North-East of Quebec province, Canada Presented by Guy Pagé, CEO and Michel Boux, VP Operations July 2013 www.dolomine.com 1 CaMg(CO3)2 Calcium, magnesium & carbonate source. Dolomite differs from Limestone CaCO3 in that it contains magnesium as well as calcium. 2 Low SiO2 HSP2 As a reference, pure dolomite has the following chemical composition: 31,3% CaO + 21,1% Mg0 + 47,2% CO2 (LOI) for a total of 99,8% of the mineral. 3 > 700 000 000 metric tons reserves Result in MgO : 20.5% Result in CaO : 30.2% Result of MgO expressed in MgCO3 : 42.9% Result of MgO expressed in Mg : 12.4% Result of CaO expressed in CaCO3 : 53.9% Result of CaO expressed in Ca : 21.6% 4 For reference, pure dolomite has the following chemical composition: 31,3% CaO + 21,1% Mg0 + 47,2% CO2 (LOI) for a total of 99,8% of the mineral. 5 Finished products: Aggregates ½ - ¾ in & others : available upon demand Powders (mesh sizes as requested): shortly Quantities: all suitable quantities will be considered 6 7 8 The property is located approximately 940 kilometers northeast of Montreal Region and 20 kilometers east of the town of Havre-St-Pierre. It is directly accessible from the Route 138 Google earth 500 131 57.57 North 630 171 24.67 West Easy shipping 9 Operations Typical quarrying methods to extract the dolomite will be used. Operation will include drilling and blasting, loading and hauling from the quarry to the stockyard adjacent to where the dolomite will be crushed. Waste rock generated during quarrying will be stored adjacent to overburden stockpiles and will be used for future rehabilitation of the quarry site. All operating equipment will be supplied by the contractor and will include drills, loaders or excavators, haulage trucks, and de-watering equipment. 10 Rosa Galvez, director of the department of civil engineering and water engineering at Laval University has a mission: restore the most polluted lakes in Quebec, one of them being Lac St-Augustin, near Quebec City contaminated by phosphate which induces the proliferation of Blue-green algaes: A unique pilot project in the province. http://www.radio-canada.ca/util/postier/suggerer-go.asp?nID=1022480 PS: Rosa Galvez just confirmed after extensive studies that dolomite is a great mineral to dramatically alleviate the phosphate problem in contaminated lakes, rivers, etc. 11 First year shipping method 12 50 lbs plastic bags on wood pallets Big bags (1 mt each) Ground shipping Bulk: quarry to ship Big bags (1 mt each) 13 • • • • • • • • • • No quality dolomite shortage expected (> 700 000 000 mt reserves) Our dolomite is widespread and is part of a uniform deposit Easy site access to ocean shipping: ease of moving equipment and workforce in and getting our mined product out to market Low extraction costs, the dolomite deposit being horizontal: ease of extraction (open cast sites / quarrying in softer rocks typically easer and hence cheaper than deep hard rock mining). Supply capacity: 500 000 – 1 000 000MT/year Purity of our dolomite (low iron and silica) : can be used in almost all applications Quarry : ready to ship dolomite Mainline railway and national highway are adjacent to the quarry. Size reduction to dolomite mesh powders Access to skilled subcontractors 14 Dolomine Inc. expects that (by the end of July 2013) ± 200 000 mt of dolomite aggregates will be available. Aggregates • Direct sales: Michel Boux, VP Operations Dolomine at mikeboux@dolomine.com • Sold via distributors from our quarry: Google earth: 500 131 57.57 North 630 171 24.67 West Powders • this will be determined shortly Sales representative • USA: please contact Roman Rakovsky from Barite Word. 917-825-3806 or info@bariteworld.com 15 We are now taking orders and/or letters of intention for the purchase of such dolomite aggregates and shortly powders. Prices will depend on dimensions, size and quantity. Dolomite aggregates 0.6 % SiO2: FOB Havre St-Pierre port = please contact Michel Boux Dolomite mesh powder prices will be available soon. 16 Full address: Dolomine Inc. 9245 Bourret Quebec city, (Quebec) Canada , G1G 3W5 Webpage on LinkedIn = www.dolomine.com E-mail : Guy Pagé, CEO: gpage@dolomine.com • Mobile: 418 997 3861 E-mail : Michel Boux, VP Operations: mikeboux@dolomine.com • Mobile : 819 943 4771 Our partners: Groupe Vertdure and Concassés de la Rive-Sud (CRS) 17