Lean Service Update BT Operate BT Operate 2014 Vision Theme B Lean Service is one of the four strategic themes for BT Operate running from 2011 to 2 2014 What is Lean Service? • Lean Service is a different way of working with the customer at the heart of everything we do. It means efficient processes where work flows smoothly with no waiting, no queues, no waste or duplication. People are involved in both managing and improving the processes they work on and the organisation supports this. • This is not a short term programme but a long term goal which requires that everyone, everyday, thinks and acts differently. We find better ways to do things using proven methods and simple tools whilst making Operate a better place to work. 3 Lean Service vision Making processes more efficient Managing our performance Our processes will be visible and accurate with no waste or defects. Everything should flow through the process so there’s no queuing or waiting. We meet our customers expectations because our processes are predictable and in control. We will be measuring ourselves against meeting our customer commitments and the business costs involved. We make sure our performance against expectation is visible to everyone and as a team, we decide on how we can improve the way we work. Our customers will be at the heart of everything we do. All processes will start and finish with the customer. And everyone will understand how their contribution helps us meet our customer Listening to ourexpectations and make a profit. customers Having the right mindset Everyone improves how things work better by using problemsolving methods and tools. Every manager will spend time with their team to understand how things work and coach them in how to make things better. SOURCE: McKinsey Organising our people and developing their skills We‘ll organise and develop our people so they perform at their best. 4 7th Dec – 13th Jan PHASE MOBILISATION 16th Jan – 7th February 6th Feb – 4th May AS IS PLANNING & IMPLEMENTATION TO BE Level 1 Pilot Phase 7th Dec – 13th Jan MOBILISATION 19th Jan – 7th February KICK-OFF EVENT DATA CAPTURE Dec 2011 Ops C.A Facilitation Training Manager Boot-camp 4th-6th Jan 19th Dec Induction Call C.A Bootcamp th 9 – 13th Jan 3rd Feb C P C P C P 10th February C P PLANNING & IMPLEMENTATION Weekly Checkpoint Calls (Wks 5-16) C P C P Feb VOC/True North Workshop C P C P C P C P C P C P 26th March Baseline against Lean Capabilities 31st Jan / 1st 16th-18th Jan Kick of Event D 4 13th Feb – 4th May RE-DESIGN WORKSHOP 27th Jan 6th – 10th February Re-Design Workshop C P C P 23rd April Baseline against Lean Capabilities Programme Level Outputs • Plan Created • Resource Mobilised • Wave Activity / Operational Implementation Plan • Improvement & resistance Tracking Log in Place • AS IS by Lens / By Team Defined VOC • Customers identified • High Level Process Maps • SIPOC Maps • Purpose and Vision doc PROCESS EFFICIENCY •Agreed scope (start / Stop) • Functions defined • High Level Process Maps • Routing by Walking around (1st Pass draft) • SIPOC by Team (x10) inc purpose / vision • Value Stream Maps (horizontal) PERF MGT • Top Level Operational KPIs • High Level Process Metrics • Data Capture Plan 4 weeks • Routing by Walking around (1st pass draft) • Baseline MCRS ORG & SKILLS Deliver 1st Target condition • Organisation Structure • Stop / merge existing initiatives • Activity Logs by team • OD and Role changes identified • Location Decisions Made MINDSET & BEHABIOURS EVENTS & CONTROL POINTS 20th Jan 6th Feb – 10th Feb • Agreed OEB contract • Agreed Sponsor / Ops Contract • Union Agreement to Site Vistis • Team Leads inducted • Team Inducted (job satisfaction baseline) •AIM Target Assessment Baseline • Care Analysis • 3 month Imp Plan for 1st target condition • Outline Priorities for next 18 months to 2 years • Future State defined • Reinforcement & Reward Strategy Defined Define 1st target conditions – owners & milestones Outputs by Lens 16th Jan- 18th Jan • Deliver Plans • sub-wave control • Completed D4 • Enhanced Wave Design • Process specifications aligned to CTQs • Improvement in VOC Lean Maturity score • • • • Standard work in place Ongoing performance reviews in place New opportunities identified Ideal state defined • Improved Lean maturity • Self sustaining process performance • Team hold regular perf reviews using improved reports • Visual management in place • Individual Perf Mgt drives and sustains Lean approach (MCRS Implemented) • Improved Lean maturity • Self sustaining process and individual performance improvements • New job descriptions • New organisational design • Alignment of people to the purpose of the process • Improvement in Lean Maturity Index • People location plan • Target skills matrix plan • Defined &understood work standards • Visible role modelling and reinforcement • Managers verify that standard work is followed • Improvement in Lean Maturity Index • Identify and Agree next target condition C P Lean Service Approach AS IS (3-Weeks) Step 1 A0 TO BE (2-Week) IMPLEMENTATION In-Sub-wave Process Map(s) per flow developed Step 2 A0 Step 3 A0 Step 4 A0 Routing By Walking About to capture what is actually happening in each process As Is Value Stream Map created Leadership Review & Feedback 1st Target Condition with implementation plan Leadership Approval Meeting – TO BE & 1st Target Condition Review Process Performance Create To Be Value Stream Map Deferred out of subwave 1st Target Condition Operational Sponsor presenting to Business Unit MD and Lean Services Programme Owner to test ambition 6 High Level Wave Roll Out Plan – Waves 1 to 5 (Updated for Latest Roll Out Plan) D2 Wave L2C1 T2R 1 D3 Q3 11/12 Q4 11/12 Q1 12/13 Q2 12/13 Q3 12/13 Q4 12/13 Q1 13/14 Q2 13/14 Q3 13/14 Q4 13/14 Oct Nov Dec 3 8 Wks Jan Feb Mar Apr May Jun July Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun July Aug Sep Nov Dec Jan Feb Mar x3 3 16 Wks 4 Olympics x2 3 8 Wks 3 16 Wks 4 x5 L2C2 3 8 Wks 3 T2R 2 3 8 Wks 3 16 Wks 4 16 Wks 4 x4 x5 L2C3 3 8 Wks 3 3 8 Wks 3 16 Wks 4 16 Wks 4 x5 T2R 3 x7 L2C4 3 8 Wks 3 T2R4 3 8 Wks 3 16 Wks 4 16 Wks 4 x2 x6 L2C5 3 8 Wks 3 Security 3 8 Wks 3 Central Prog Oct 16 Wks 4 x 4 (TBC) 16 Wks 4 Implement C of E Communications including stakeholder and IR engagement Wave Mandate (3 wks) Mobilisation Planning (8 wks) Mobilisation (3 wks) Wave Execution (16 wks) Wave Benefits (4 wks) 7 7 Key Events of Wave 1 (up to Re-design week) Date Activity Who needs to be there Location Jan 4-6th 2012 Mobilisation: Manager Bootcamp (Induct the Management team in LEAN tools capabilities) Managers (GM – FLM), Central change team, HRBP Yarnfield Jan 9th 12th 2012 Mobilisation : Change Agent Bootcamp (Train the operational change agents to perform ‘asis’ data /process /improvement gathering Central change team and operational change agents – 15 OCA’s and a Central team of 12 Yarnfield Jan 16th – 18th 2012 Kick-Off Event with first full sub-wave team, ‘as-is’ top level process mapping, clarity to all on roles, responsibilities, processes and wave plan MD, Director , GMs, L2, L1, Central change team and operational change agents, HRBP TBA 31st Jan – 1st Feb 2012 Voice of Customer / True North Workshop Director/ GMs, LL, Navigator and True North Central Change Agent London TBA 6th – 10th Feb 2012 Re-design week: First day is ‘as-is’ following days to agree 1st Target Condition and ‘To-be’ MD, Director , GMs, L2, L1, Central change team and operational change agents, HRBP Yarnfield Agreed Wave Roll Out Plan - @ 28 October 2011. Issue 2 Wave 1 Wave 2 Wave 3 Wave 4 Wave 5 Dave Dobson Non UK.ABIC,D & F. 173 Dave Dobson Non UK ABIA,H & J 158 Pete Stewart Network Services ABDD & E. 27 Pete Stewart Network Services HE ABDB ABDC. 170 Dave Dobson Int Voice, IPT, LAN, Pcct. ABI 177 Pete Stewart Network Services ABDA –ABDC. 219 Paul Taylor ISDN, WLR. ABVB 197 Neeraj Khanna GCI Functional 257 (see notes) Pete Stewart Network Services MPLS ABDB ABDC. 143 Mike Cook MEAS & HE Planning ABMA,B &D. 141 Heide Baumann FE South West ABS5 240 + 10 = 250 Heide Baumann FES Inner London ABS3 224 + 17 = 241 Paul Taylor ISDN/WLR ABVA. 173 Mike Cook MEAS & HE Planning ABMA & C. 190 Dougie Anderson Business Services AUA. 108 Paul Weir VoiP. ARF 220. Heide Baumann FES NHC. ABSI. 203 + 7 = 210 Mark Williamson Capacity Management ABEE2 & 3. 250 Marc de Witt Int & Contracts AUC. 239 Dougie Anderson Wholesale & PCCT AUA. 196 +67 = 264 Tony Jamieson DCs, Tech Svcs ARE4 & 6. 203 Martin Greenan Network Platforms ARQ. 112 Total = 937 Total = 1786 Paul Holl FEN Midlands ABN4 & ABN67 233 Mark Williamson Capacity Management 21CN. ABEC,D &H 250 Joe Barry TV & Media AUB. 208 Dougie Anderson Wholesale & Change AUA25./AUA53. 150 +53 = 203 Marc de Witt Global Network Ops AUC. 127 Heide Baumann FES Outer London ABS4 255 + 17 = 272 Paul Holl FEN North West ABN3 & ABN65. 242 Mark Williamson Capacity Management Migrations & Integrate ABEC,H .200 Paul Holl FEN North East ABN2 & ABN66 276 Paul Weir Event Mgt ARF. 260 Tony Jamieson Enterprise Infrast. ARE5. 147 Martin Greenan ASG ARQ. 263 Paul Weir Event Mgt / 21C 154 +82 =236 Total = 2228 Total = 1930 Heide Baumann FES SHCABS2 209 +7 216 Heide Baumann FES Inner London Trading ABS3M 113 Paul Holl FEN Scotland ABN1 & ABN64 229 Paul Holl FEN Wales & WN ABN5 & ABN68 230 Mark Williamson Capacity Management 21CN Cap & Delivery ABEC,D,H 250 Security TBC Total = 11969 Wave 1 – in scope teams • • • • • Pete Stewart Mike Cook Paul Taylor Dougie Anderson Paul Weir 10 Pete Stewart – in scope organisation Richard Foxall ABDB Jeff Rawlings ABDB2 Howard Ambrose ABDB1 Bob Page ABDB11 FTE = 9 Ian Goulcher ABDB 15 FTE = 15 2 x C2; 7 x C3 3 x C1, 7 x C2; 5 x C3 4 in Brighton 1 Bristol 4 Dorking 14 in Wolverhampton 1 Homeworker Martin Geraghty ABDB 18 No FTE Simon Dutton ABDB3 Mark Slade ABDB 25 FTE = 11 11 x C3 Gary Skeats ABDB 26 FTE = 15 13 x C3; 2 x D1 11 Wolverhampton 6 Exeter, 1 Dudley, 3 Birmingham, 2 Skelmersdale, 1 Sheffield, 2 London (Team recently closed) David Rowley London Matt Rothery ABDB 31 FTE = 14 13 x C3, 1 x D1 Lenort Facey ABDB 34 FTE = 12 12 x C3 7 Romford, 7 London 5 In Esher, 7 London Mark Hill ABDB 33 FTE = 8 8 x C3 2 Bedford, 2 Glasgow, 1 Leicester, 1 Nottingham, 1 Birmingham, 1 Coventry Mike Cook – in scope organisation Mike Cook ABM Olwen Hill ABMA Tom Collins ABMC Keith Vincent ABMA 1 Stephen McNaught ABMA 11 FTE = 15 14 x C2; 1 x C3 All located in Southampton Nigel Brewer ABMA 12 FTE = 13 6 x C2; 7 x C3 All located in Southampton Mark Gibbs ABMA 13 FTE = 15 8 x C2; 7 x C3 All located in Southampton Paul Hampson ABMC 11 FTE = 22 David 21 x C3 Rowley All located in Oswestry London Laura Wilson ABMC 12 FTE = 21 20 x C3; All located in Glasgow Campbell Ingram ABMC 11 FTE = 22 19 x C3; 2 x D1 All located in Glasgow Steve Higgins ABMC 11 FTE = 18 1 x C1; 1 x C2; 15 x C3 All located in Wolverhampton Malcolm Potter ABMC 11 FTE = 21 19 x C3; 1 x D1 All located in Walsall Kirsty Smith ABMC 11 FTE = 15 14 x C3 All located in Walsall Paul Taylor – in scope organisation (PSTN/ISDN/WLR) Sean Donovan PAULETTE MOSES ABVA11 HANNAH WHEELER ABVA12 NOEL DAVIS ABVA14 ADRIAN CROLL ABVA15 RICHARD LEY ABVA16 Customer Service Manager, UK Voice Service Delivery BTW Voice Order Provision - UK Voice Service Delivery, Numbers and Switch Manager Fulfilment Process Owner UK Service Operations, Order Management Service Delivery COSAM - CSS/SM Admin manager for the London & Home Counties, FTE = 1 Location FTE = Grade No of BIRMINGHAM 1 TRACEY HAMILTON ABVA19 Team Manager - UK Voice Service Delivery. BT Operate FTE = Location EDINBURGH 18 21 Reg EDINBURGH Reg Reg Reg Reg Reg EDINBURGH EDINBURGH C2 C3 B2 4 1 4 2 3 WOLVERHAMPTON C2 4 Reg DUNDEE C3 1 Reg WOLVERHAMPTON C3 1 Reg LEEDS D1 1 Reg LONDON C3 6 Reg LONDON PRESTON D1 D1 2 1 Reg Reg CHRISTINE STEPHENSON ABVA1A EULALEE WILSON ABVA1B Covering Team Manager -UK Voice Service Delivery. BT Operate SGMU Manager FTE = 15 Location Grade No EDINBURGH C2 4 Emp Class Reg No BRISTOL D1 2 Emp Class Reg D1 1 Reg C3 D1 C3 1 1 1 1 Reg Reg Reg Reg WORTHING C2 9 Reg NEWCASTLE UPON TYNE C3 2 Reg ORPINGTON ORPINGTON ORPINGTON ROMFORD FTE = BOURNEMOUTH BIRMINGHAM C2 1 Reg CARDIFF C3 C2 1 4 Reg Reg CARDIFF LONDON OSWESTRY FTE = NEIL LOVELOCK ABVC 8 FTE = 3 Location Grade No 1 AYLESFORD C3 1 Emp Class Reg C3 C3 C2 B2 C3 1 ILFORD C3 1 Reg LONDON LIVERPOOL LONDON OSWESTRY PORTSMOUTH WORTHING C3 C3 C3 C3 1 4 2 2 1 Reg Reg Reg Reg Reg WORTHING WORTHING C3 13 Reg Grade No of 1 Reg DAGENHAM D1 1 Reg 4 1 1 Reg Reg Reg LONDON LONDON LONDON C3 D1 1 2 1 Reg Reg Reg C3 2 Emp Class Reg 1 Reg ALDERSHOT D1 1 Reg 19 1 Reg Reg BOLTON BOURNEMOUTH BOURNEMOUTH BRISTOL DORCHESTER C3 C3 D1 C3 1 1 1 2 1 Reg Reg Reg Reg Reg Location FTE = 1 Grade No 1 Emp Class Reg Heat_Map_Wave_2_SD_subWave_PT_Draft_2 Grade No of NEIL GRATTON ABVA23 Operation Manager - UK Voice Service Delivery 22 FTE = 16 Location Grade No BRISTOL C3 2 Emp Class Reg C3 1 Emp Class Reg C3 9 Reg TAUNTON C2 1 Reg C3 1 11 Reg Reg TAUNTON TAUNTON C3 D1 10 3 Reg Reg Grade No of RAPHAEL ANTHONY/ANIL PATIL ABVC1X Location LONDON ALDERSHOT Location ISDN30 Team Manager - UK Voice Service Delivery FTE = MIKI WILLIAMS ABVC1 Emp Class Reg Grade No of 25 Emp Class Reg Location 1 Emp Class Reg SIMON COOKE ABVA22 ISDN30 Service Delivery and Featurenet Manager Grade GLASGOW Location MARIA JACKSON ABVA21 Location GLASGOW Numbering & Addressing Manager-UK Voice Service Delivery 1 7 Reg GERWYN WILLIAMS ABVA26 Grade No of FTE = Reg KIDDERMINSTER LONDON C2 C3 1 1 1 C2 1 C3 14 BIRMINGHAM FTE = C2 C2 Emp Class Reg No BRIGHTON DORKING DORKING DORKING WOLVERHAMPTON 3 1 22 Grade BRIGHTON BLACKBURN C2 Grade No of FTE = 1 Location Emp Class Reg Location B2 Team Manager - GS Customer Order Management , BT Operate FTE = 1 BRIGHTON Grade No of KEITH GALLON ABVA25 Location FTE = Emp Class Reg Location Emp Class Reg Grade No of GLASGOW GLASGOW Emp Class Reg FTE = 27 Location Grade No PUNE CCON PUNE CCON MOSES MAKWANE + 4 OTHERS ABVCX FTE = 57 Location Grade No 1 Emp Class SC-B MUMBAI CCON 43 26 SCD MUMBAI CCON 13 TPA PUNE PUNE PUNE 411057 CCON CCON CCON 1 3 1 SC-B SCD SCD Emp Class SCD 13 Dougie Anderson – in scope teams (Business Services) Owen Moody – AUA1 General Manager Business Services Accountable for the operation of Business Services Keith Bird– AUA11 Customer Relationship and MBN Manager Jim Skinner – AUA12 Business Switch Service Manager Raj Sanghera – AUA13 Customer Relationship and Supplier Management John Rodaway – AUA14 Service Improvement & Commercial Manager Functions: Customer Escalation Management and MBN Functions: Day to Day Business Switch Service Management Functions: Wipro Management, Service Improvement and Performance Management Escalation Management Glasgow Switch Team Functions: Commercial Management of the Wipro contract and leadership of service improvement Escalation Management Eccles MBN Team Leeds MBN Team Leeds Switch Team Service Introduction Birmingham Switch Team Avaya Relationship Baynard Switch Team (Closing January 2012) Cambridg e STST0 5 1 Re g Eccles NEET0 5 1 Re g Exeter D1 1 Re g Dougie Anderson – in scope teams (Business Switch) Offshore Resource Business Switch Products Wipro – AUC99 Offshore Resource Functions: BTR & GS Tickets and Advice Line 2nd Line Avaya Red Versatility Avaya Blue - CTI Lake Meridian Mitel 300 Pune 51 ISDX ISDX Chennai 16 Lake/Norstar BCM Onshore Resource Marion Poma – AUA121 Leeds Switch Service Manager David Anderson – AUA122 Glasgow Switch Service Manager Simon Smith– AUA123 Birmingham Switch Service Mgr Kevin Telfer – AUA124 UK Switch Service Manager Functions: BTR Tickets and Advice Line 2nd Line Functions: GS Tickets 2nd Line Functions: GS Tickets and Advice 2nd Line Functions: Business Switch Technical Managers Leeds 13 Leeds 1 Functions: BTR Tickets and FE Support 3rd Line Leeds 3 Stockport 1 Stockport 1 Glasgow 9 Birmingham 5 Functions: 24 Hr UK Business Switch Support John Norman– AUA125 Baynard Switch Service Manager Functions: GS 2nd Line Baynard 9 Birmingham 3 Middlesbrough 3 Functions: FE Support Birmingham 1 Croydon 3 Functions: 3rd Line Glasgow 1 Croydon 1 Birmingham 4 Romford 1 Birmingham 4 Cambridge 2 Birmingham 2 Functions: MMU Birmingham 2 Monument 1 Monument 1 Dougie Anderson – in scope teams (Managed Business Networks) Offshore Resource Wipro – AUC99 Offshore Resource Functions: BTR & GS Tickets and Advice Line 2nd Line Pune 35 Onshore Resource Managed Business Network Products Willie Boyd – AUA11 MBN Service Manager Functions: GS MBN CPE Tickets CLAN CS Matrix Leeds 2 TellePresence Leeds 6 Wavestream Leeds 3 CISCO WAN/LAN CISCO IPT Eccles 4 Eccles 7 Birmingham 2 GHUCS Paul Weir – in Scope Organisation Paul Weir Director TIS (Holborn ATE) Derek Simcock Cambridge Christophe Williams (El Segundo) Barbara McNallyYoung Oswestry Del Clifford Colombo Hse Sian Price (Pontyclun) Elizabeth Lamas El Segundo 17 Ian Darby Pontyclun 5 HW 4 Bristol 1 Colombo 1 Shrewsbury Chris Wilcox Pontyclun 6 Bristol 4 Plymouth 3 Keybridge 1 HW 1 Leighton Evans Liverpool 4 Oswestry 4 HW 3 Dave Eveleigh Pontyclun 5 Sheffield 2 Bristol 1 David Rhodes Leavesden 1 Nottingham1 Coventry 1 Graeme Cunningham HW 3 Derby 1 Exeter 1 Brighton 1 Simon Lambert Faraday 1 Walsall 1 Bedford 1 Adastral 1 Oswetry 1 Edinburgh 1 HW 1 Gary Turnbull (Edinburgh) Alan Burnham Owen Forth Chris Davey Colombo 9 Mitch Lockett Colombo 11 Ian Asquith Colombo 2 Mike Heseltine Kingston 1 Canterbury 1 Walsall 1 Brighton 1 Adastral 1 Jeff Eldridge Colombo 18 Andy Stevens HW 4 Colombo 1 Worthing 1 Stockport 1 Brighton 1 Leavesden 1 Swindon 1 Dundee 1 Raj Shah John Unsworth Colombo 1 Chris Boley Adhara 11 Robert Mochaiski Colombo 7 Scott Northover Adastral 10 Colin Marston Pontefract 7 Barnsley 1 James Barnes Tony Rhodes Oswestry 11 Julian Archer Oswestry 10 Kuldip Singh Oswestry 12 Overview of programme resource (includes operational and central change agents) 18 Service delivery - Pete Stewart Unit Director Pete Stewart 50% Wave Leadership Team Ops Change Lead Richard Foxall, Chris Berryman, Gary Thwaites, ,Narinder Rayit 50% Execution Lead TBC (SD 20%) Lean Leader Barry Atkins 100% Lean Coach Arnie Tonneson 33% HRBP Murray Phair 50% Aim Coach Caroline Evans 33% Lean Navigator Haydn Singleton 100% People Lead Jenny Allen 15% IR Lead Matt Rogers 5% Behavioural Change consult. Neil Jackson (TBC) 100% Project Manager Stuart Saberton 100% Comms Lead Di Carter 33% Central resources allocated to SD sub Wave Change Agents (100%) Horizontal Change Agent: Chris Jones Vertical Change Agent: Barry Lamb Central Change Agents: Ian Losh, Jim Morris (TBC) Ops Change Agents Wave 1; Andy Morgan, Paul Thompson, Matt Rothery, Karen Cross, Matt Ellis, Diogo Azevedo, Adrian Bradney, Fran Ross, Sam Cadman, Chris Hall, Ross Perry, Tony Machon, Liam Halsall, Laura Farnington, Andy Stone Ops Change Agents Pilot & Wave 2; Stephen Dorman, Gill Calvert, Mark Newhill Ops Change Agents Reserve: Kay Williams Steve Ottaway, Tobias Colthart, Hayley Kennett People Roles: Senior HRBP: Greg Clark 30% OD Consultant: Jenny Allen 30% Contracting Facilitation: Yasmin Chiu (2 days) Process writer: Angie Driver Comms: Jude Hartness MIS Roles: MIS Lead: Barry Farrow 100% Dashboard implementer: 1 x tba 100% SPC Lead: P Coulton to advise 1 x 30% Performance Board Implementer: 1 x 100% A1 MIS Lead: Mike Trotter Managers in scope (50%) Chris Berryman Narinder Rayit, Gary Thwaites ; Martin Hull; Simon White; Dave Walsh; Howard Ambrose; Jeff Rawlings; Pete ttt Trevorrow; Miki Williams. 19 Service delivery – Mike Cook Unit Director Mike Cook 50% Ops Change Lead Tom Collins & Olwen Hill 50% Execution Lead TBC (SD 20%) Wave Leadership Team HRBP Simona Cilenti 50% Lean Leader Raj Vyas 100% Lean Coach Arnie Tonneson 33% Aim Coach Caroline Evans 33% Lean Navigator Alistair Hall 100% People Lead Jenny Allen 15% IR Lead Matt Rogers 5% Behavioural Change consult. Lucie Emerson (TBC) 100% Project Manager Darren Collyer 100% Comms Lead Di Carter 33% Central resources allocated to SD sub Wave Change Agents (100%) Horizontal Change Agent: Fahmida Chowdhury Vertical Change Agent: John Platt Central Change Agents:, Peter McDonagh, Helen Moss, Alan Smith Ops Change Agents Wave 1: Richard Edmonds, Paul Shukla, John McLaughlin, Neil Pacey, Karen Jones, Harvey Kalair, Ops Change Agents Wave 2 : Yvonne Henry, Shelley Reid, Pete Ewart, Jon Harris, Lee Shelley. People Roles: Senior HRBP: Gae Kennedy 30% OD Consultant: Chetna Shah 30% Contracting Facilitation: Yasmin Chiu (2 days) Process writer: Kathryn Haworth Comms: Chris Marshall MIS Roles: MIS Lead: Jason Martin100% Dashboard implementer: 1 x tba 100% SPC Lead: P Coulton to advise 1 x 30% Performance Board Implementer: 1 x 100% A1 MIS Lead: Mike Trotter Managers in scope (50%) Olwen Hill; Keith Vincent; ttt 20 Service delivery – Paul Taylor Unit Director Paul Taylor 50% Ops Change Lead Sean Donavan 50% Execution Lead TBC (SD 20%) Wave Leadership Team HRBP Rebekah Evans 33% Lean Leader Nicola Buckle100% Lean Coach Arnie Tonneson 50% Aim Coach Caroline Evans 50% Lean Navigator Ian Devonshire 100% People Lead TBC Jenny Allen 15% IR Lead Matt Rogers 5% Behavioural Change consult. TBC 100% Project Manager Laura-Anne Blight 100% Comms Lead Di Carter 33% Central resources allocated to SD sub Wave People Roles: Change Agents (100%) Horizontal Change Agent: Jon Bull Vertical Change Agent: Alex Yeates Central Change Agents: Pete Rawcliffe, John Wallace, Caspar Ritchie Ops Change Agents Wave 1: Dave Shade, Simon Hill, Paul Wellfare, Steve Voss, Neil Trump, Joanna Howie, Lynsey McManus, Joanna Pendry, Alan Dunbar, Sue Bamford, Nigel Fry, Senior HRBP: Greg Clark 30% OD Consultant: Prateek Sinha 30% Contracting Facilitation: Yasmin Chiu (2 days) Process writer: Peter Lincoln Comms: Jude Hartness MIS Roles: MIS Lead: Ian Moody100% Dashboard implementer: 1 x tba 100% SPC Lead: P Coulton to advise 1 x 30% Performance Board Implementer: 1 x 100% A1 MIS Lead: Mike Trotter Managers in scope (50%) Hannah Wheeler, Adrian Coll, Richard Ley, Tracy Hamilton, Christine Stevenson, Leigh Wilson, Paulette Moses, Noel Davis, Steve Voss, Anne Louise Barrett ttt 21 Service Infrastructure - TIS Lean Wave 1 Resource Model Unit Director Paul Weir 50% Ops Change Leads Del Clifford/Derek Sincock/Barbara MYoung 50% Execution Lead J. Hayes 20% Wave Leadership Team HRBP Sharon Gotsell/ Natalie Krista 50% Lean Leader Neha Damani/ Ian Symington100% Lean Coach Arne Tonnesson 50% Aim Coach Caroline Evans 50% Lean Navigator Chris Simmonds 100% Learning Capture Andy Beeton 20% People Lead Jenny Allen 15% Behavioural Change consult. Sue Pownall/ Coral Dyer 100% IR Lead Matt Rogers 5% Project Manager Adele Cooper 80% Comms Lead Di Carter 10% Central resources allocated to SM&O sub Wave People Roles: Change Agents (100%) Horizontal Change Agent: Kevin Collins Vertical Change Agent: Simon Maskill Central Change Agents: Rob Schnaar, Steve Joyce, Chris Gibson Ops Change: Helen Thorpe, James Barnes, Dave Eveleigh, Greg Hay Lord, Laura Calver, Simon Gange, Chris Davey. Ian Asquith, Andy Stevens Ops Change Agents from W2 : Ian Pashley, Pauline McManus, Robin Hall, Patrick Moloney, Chris Turner Other Change Agents: Tony Butler; Charles Virgo Senior HRBP: Jan Sim 20% OD Consultant: Willson Hau 30% Contracting Facilitation: Yasmin Chiu (2 days) Process writer: Geoff Street 100% Comms: Sam Collins 20% MIS Roles: MIS Lead: Suraj Naik/Maggie Tromans 100% Dashboard implementer: 1 x tba 100% SPC Lead: P Coulton to advise 1 x 30% Performance Board Implementer: 1 x 100% A1 MIS Lead: Tba 20% Managers in scope (50%) Sian Price, Ian Darby, Leighton Evans, Chris Wilcox, Christophe Williams, Elizabeth Lamas, Gary Turnbull, Graeme Cunningham, Mike Heseltine, Simon Lambert, Raj Shah, John Unsworth, Alan Burnham,ttt Mitch Lockett, Robert Mochalski, Jeff Eldrige, Scott Northover, 22 Clive Boley, Owen Forth, Ian Asquith, Andy Stevens, Colin Marston, Tony Rhodes, Julian Archer, Kuldip Singh ; Service Management - SM&O Lean Wave 1 Resource Model Unit Director Dougie Anderson 50% Ops Change Lead Owen Moody 50% Execution Lead J. Hayes 30% (SI 20%) Wave Leadership Team HRBP Nancy Collinson 50% Lean Leader Jason Zawadzki/Moira Kan 100% Lean Coach Paul Stokoe 50% Aim Coach Caroline Evans 50% Lean Navigator Neil Hickman 100% Learning Capture Andy Beeton 20% People Lead Jenny Allen 15% Behavioural Change consult. Sam Franks 100% IR Lead Matt Rogers 5% Project Manager Kalpana Kanani 100% Comms Lead Di Carter 10% Central resources allocated to SM&O sub Wave People Roles: Change Agents (100%) Horizontal Change Agent: Trevor Hardy Vertical Change Agent: Graham McManus Central Change Agents: Ian Woodman, Ray Cox, Simon Bance Ops Change Agents (Owen’s area): Mario Poma, Andy Kurdynowski, John Lee, Euan Walker Ops Change Agents (DA) :Paul Smith, Alan Cassidy, Ops Change Agents (MdW): Dave Leese, David Stubberfield Senior HRBP: tba (current vacancy) OD Consultant: Willson Hau 30% Contracting Facilitation: Yasmin Chiu (2 days) Process writer: Vikki Turnbull 100% Comms: Shez Hussain 20% MIS Roles: MIS Lead: Steve Tilley 100% Dashboard implementer: 1 x tba 100% SPC Lead: P Coulton to advise 1 x 30% Performance Board Implementer: 1 x 100% A1 MIS Lead: Tba 20% Managers in scope (50%) Jim Skinner, John Rodaway, Raj Sanghera, Keith Bird, David Anderson, Simon Smith, Kevin Telfer, John Norman ttt 23