Update of Downtown Rail Improvements DFWI & Chamber Stakeholders February 26, 2014 Alonzo Liñán, PE, PTOE City of Fort Worth Agenda •Tower 55 •Live Oak Connector •9th Street Crossing •Questions… 2 Tower 55 3 Tower 55 TIGER Grant Goal Increase Economic Productivity Improve Community Livability Improve Environmental Sustainability Impact Add train capacity Reduce train and vehicle congestion • Close two (2) crossings (BNSF & East 1st and BNSF & Peach Street) • Reconstruct two (2) crossings (BNSF & Gounah and BNSF & Cold Springs) Improved pedestrian mobility and safety • Sidewalks, Streetlights, Fencing Install traffic signals at Hampton and Belknap Improved Air Quality Conditions 4 Tower 55 Two BNSF Rail Bridge Improvements Cold Springs Gounah Two BNSF Rail Crossing Closures Peach Street East 1st 5 Existing Crossing Closures BNSF & 1st Street BNSF & Peach Street 6 Cold Springs Overpass Reconstruction Before Before After 7 Gounah St. Overpass Reconstruction Before Before After 8 Tower 55 Pedestrian Impacts 9 Sidewalk Network Gounah Peach 10 Tower 55 Fencing 11 Tower 55 Fencing 12 Tower 55 Pedestrian Impacts 13 3rd St Accessibility • Existing sidewalk at 3rd St underpass • No Improvements proposed 14 East Lancaster St. Bridges • Built in 1906 (est) • UP led work • Rehabilitate abutment wall • Encapsulate center posts with micro piles • Re-deck entire structure • Local partners coordination for detours and traffic control 15 Tower 55 New Traffic Signals 16 Live Oak Connector 17 Live Oak Connector Goal • New street construction for reliable neighborhood access Impact • Construct Live Oak Street from 1st to 4th St • Close (2) UPRR crossings (E 1st and Peach) • Construct fencing on both sides of track • Project still underway 18 Live Oak Connector 55 Fencing 19 9th Street Crossing 20 9th Street Crossing 21 9th Street Crossing Discussions to Date • Reopen at-grade RR crossing • Leave as is (closed) Considerations • Businesses are restricted • Quiet Zone/Horns • Staging of trains • Number of trains 22 Schedule Updates Tower 55 • Anticipated substantial completion date – September 2014 • Crossing Closures – Late July 2014 –1st Street and Peach Street –In advance of school year to ensure safe traffic flows • Grade separations – Complete Mid-June 2014 –Gounah Street – May 1st target completion –Cold Springs Road – June 1st target completion Live Oak • Plans nearing completion • Expect construction to be done by end of 2015 9th Street • Pending Land Owner Discussions 23 Questions? DFWI & Chamber Stakeholders February 26, 2014