Dolomite Crushing Flowchart

advertisement
LOW SILICA DOLOMITE SOURCING PROPOSAL FOR INTEGRATED STEEL PLANTS
Index
• Inthai Mining Limited : Overview
• Our Mines Locations : Khao-in Mines , Tha-U-Tae Mines &
Tiptanapan Mines
• Our Crushing Plants location : Khlong Lang
• Transportation of Dolomite from Mines to Plant and Port
• Production details
• Dolomite Specification
• Our Port details and operations
• Analysis Certificates
• Contacts
Inthai Mining Limited : An overview
INTHAI MINING LIMITED, a JV between Singh Group and Santhad Group
Company, is one of the best quality and low silica natural Dolomite
producer and supplier with 30 years experience in the mining industry,
having annual turnover of 350 million.
We are sourcing partner for high quality Dolomite to Integrated steel
industries in Asian countries, specially in India , Japan & Korea.
Our annual production of dolomite, in different sizes, is about 2.7
million MT and have capacity to increase our production depending
upon demand-supply.
We attribute our success to our high quality of products, customer
centricity, meeting & exceeding client expectations & dedicated teams.
Singh Imperial
Export Import Co.
Ltd.
Santhad Group Co.
Ltd.
50 %
50 %
Inthai Mining
Limited
100 %
Exclusive Marketing
Rights
Sumpun Mining
Limited
60 %
40% Equity
Tiptanapan Mining
Ltd
 Inthai Mining Limited is a JV Company with 50:50 %
partnership between Singh Imperial Export Import
Co. Ltd and Santhad Group Co. Ltd.
 Sumpun Mining Ltd (SML) owning Dolomite mines, is
owned by Santhad Group Ltd and has given exclusive
marketing rights to Santhad Group Co .Ltd who
inturn has endorsed these rights to Inthai Mining
Limited.
 Tiptanapan Mining Ltd. owning Dolomite mines is
40% held by Inthai Mining Limited.
 The companies mentioned here above have common
directors
Tha-U-Tae Mine
Ore Reserves- 18 Million Ton
Tha U Tae Dolomite Mine
1013000
ML.No. 30217/15577
1012900
1012800
1012700
ML.No. 23174/14322
1012600
ML.No. 30234/15664
1012500
1012400
Total Area 164-1-37 rai(271,228 m2)
1012300
ML.23174/14322
ML.30217/15577
ML.30234/15864
38-2-96 rai(69,984 m2)
100-0-39 rai(160,156 m2)
25-2-72 rai(41,088 m2)
Scale 1 : 4,000
0
1012200
569600
569700
569800
569900
570000
Minable ore reserve Area (188,729 sqm.)
Total Ore reserve Area (262,060 sqm.)
50
570100
100
150
570200
200
m.
570300
570400
Khao-In Mine
Ore Reserves- 40 Million Ton
Khao In Dolomite Mines
1008300
1008200
10
15
13
9
1008100
12
11
14
1
1008000
8
2
1007900
3
1007800
5
4
Khao In Dolomite Mine
1007700
ML.No. 23225/14814
7
Area 188-2-7 rai(301,628 m2)
1007600
Total Dolomite Ore reserve Area (262,200 sqm.)
6
1007500
Scale 1 : 5,000
1007400
579900
0
580000
580100
580200
580300
580400
580500
50
100
580600
150
200
580700
m.
580800
580900
Tiptanapan Mine
Ore Reserves- 40 Million Ton
TiptanapanDolomite Mines
1006000
11
Mr. Term Dolomite Mine
1005900
10
ML.No. 23185/14418
9
1005800
1
1005700
1005600
8
2
4
3
1005500
7
5
1005400
Minable ore reserve Area (252,186 sqm.)
Total Ore reserve Area (278,976 sqm.)
6
1005300
Scale 1 : 5,000
0
1005200
575900
50
100
576000
150
200
576100
m.
576200
576300
576400
576500
576600
576700
576800
576900
577000
Khlong Lang Crushing Plant
Loading at our crusher plant…
Transportation : Mines to Plant & Port
DISTANCE TO (Km.)
NAME OF DEPOSITS
LOCATION
KHLONG LANG
THA-U-TAE Mine (SPM)
KHAO IN Mine (SPM)
TIPTANAPAN MINES
Kanchana Dit
Kanchana Dit
Kanchana Dit
27
20
25
KHANOM PORT
47
40
45
Our Dolomite Specification…
1. CaO
30 % min
2. MgO
20 % min.
3. SiO2
0.50 % max.
4. Al2O3
0.50 % max
5. Alkali
0.20 % max
6. Moisture
2 % max
7.Phosphorous
0.1 % max
8. Sulphur
0.1 % max.
Production Report (SPM) For FY 2008 - 2009
Sl. No
Name of the Crushing Unit
MT/day
MT/month
MT/Year
1
Khalong Lang Crushing Plant #1
1,200
30,000
360,000
2
Khalong Lang Crushing Plant #1
1,200
30,000
360,000
3
Tiptanapan Crushing Plant
1,500
37,500
450,000
4
Khao-In Crusing Unit
800
20,000
240,000
4,700
117,500
1,410,000
Total
Production Report (SPM) For FY 2009 - 2010
Sl. No
Name of the Crushing Unit
MT/day
MT/month
MT/Year
1
Khalong Lang Crushing Plant #1
1,500
37,500
450,000
2
Khalong Lang Crushing Plant #1
1,500
37,500
450,000
3
Tiptanapan Crushing Plant
2,000
50,000
600,000
4
Khao-In Crusing Unit
1,200
30,000
360,000
6,200
155,000
1,860,000
Total
Production Report (SPM) For FY 2010 - 2011
Sl. No
Name of the Crushing Unit
MT/day
MT/month
MT/Year
1
Khalong Lang Crushing Plant #1
1,500
37,500
450,000
2
Khalong Lang Crushing Plant #1
1,500
37,500
450,000
3
Tiptanapan Crushing Plant
2,000
50,000
600,000
4
Khao-In Crusing Unit
1,200
30,000
360,000
5
Mr. Term Crusing Unit
3,000
75,000
900,000
Total
9,200
230,000
2,760,000
Production Method
- 90 mm Crushed Dolomite
Screening Plant
Screening Plant – Triple Deck
Post Screen Products
SL
Products
Size
Actual Size
1
Calcining Plant Grade Lumps
-90 +50mm
40mm-80mm
2
BF Grade Lumps
-50mm +30mm
20mm – 40mm
3
Sinter Grade Chips
-30mm + 10mm
5mm-25mm
4
Fines For Sinter/Agriculture
-10 mm
-10mm
Finished Goods : Production Ratio
40mm - 80mm
-10 , 15%
5-25, 25%
40-80, 30%
20mm-40mm
5mm-25mm
20-40 , 30%
(-10 mm)
Finished Material Production (MT/Yr.)
414,000
828,000
40mm - 80mm
20mm-40mm
5mm-25mm
690,000
-10 mm
828,000
Production, Supply
Size
Prodn. in MT/Yr
Supply
Surplus
40-80 mm
828,000
100,000
700,000
20-40 mm
828,000
884,650
-56650
5 -25 mm
690,000
800,000
-110,000
-10 mm
414,000
414,000
0
Remarks
This size is again re-crushed
for smaller sizes as per market
requirement.
Japan
Japan / India (110,000 MT
deficit is fulfilled by resizing 4080 mm size )
Agriculture/ Construction and
Local Market
We have approx 533,350 MT of 40-80 mm Dolomite as surplus which can be
resized and supplied to new client on continuous basis.
Surplus
** The above production can be enhanced as per demand or business
need.
OUR KHANOM PORT
NAKORN SRI THAMMARAT,
SOUTH OF THAILAND
Khanom Port, Thailand
B.A. Chart
Anchorage Position
No. 3963
LAT 9๐ 12.5’ N / LONG 99๐ 54.5’ E Time
Zone : GMT +7
Company
Berth Position
Name of berth
KHANOM PORT Co.,Ltd.
About 1 mile from anchorage position.
Khanom Port
Jetties
3 Jetties are available for loading
Jetties at our Khanom Port, Thailand
Jetty 1 : This is small jetty with depth 7 - 8.5 m. , Far from shore 70 m.,
Port width 40 m., mooring buoy 6 nos, loading rate 500 MT/Hour
3500 MT/Day by Conveyer Belts, Air draft 10.5 m. and Shipment size
10,000 - 15,000 MT
Jetty 2 : This is a big jetty with depth 9 - 10.5 m. , Far from shore 180
m., Port width 20 m., Mooring buoy 8 nos, Loading rate 500 MT/Hour
6000 MT/Day by Conveyer Belts, Air draft 10.5 m. and Shipment size
20,000 - 30,000 MT
Jetty 3 : This jetty is meant for loading into Barge and equipped with
crane . Depth : 5 m. , Far from shore : 14 m, Port width : 28 m, Loading by
crane : 20 MT/hour
Loading Rate at Khanom Port
Loading Rate :
Hourly loading rate : 500 MT
Daily loading rate : 6000 MT depending on stoppages for shifting
the vessel regularly and carefully checking of the draft.
Working Hours :
24 Hours AWWDSHINC inclusive of break and shift change time
Stockyard & Jetties location at Khanom Port
Inthai Mining Limited : Stockyard at port…
Loading at Stockyard at Khanom Port
Our Ground logistics…
Dumping into Hopper at Jetty
Loading Operation at our Khanom Port…
Sample collection by Inspection Agency…
Loading through conveyer at Jetty
Loading at our Khanom Port…
Loading operations at our port…
Certificate of Analysis…
We Source for…
• Jindal Steel Works, India
• Ispat Industries Limited, India
• Bhushan Power & Steel Ltd., India
• Kobe Steel Limited, Tokyo, Japan
• Nippon Steel Corporation, Japan
• Sumitomo Metal Industries Limted,
Japan
• Pacific Metals Co. Ltd, Korea
Inthai Mining Limited : Contacts
Head office :
210/5, Khu Bon Road
Khanna Yao, Bangkok 10220
Thailand.
Phone : +66 29433074
+66 29433517
E-Mail : inthaimining@singhgroup.net
Website : www.singhgroup.net
Corporate Office:
464, 2nd Floor,
Ratchadapisek Road,
Samsennok, Huay Kwang,
Bangkok – 10310
Thailand
“Measure not the work until the day's out and the labor done”
Download