BUILDING A BETTER WISCONSIN Building Chairs Presentation April 26, 2013 Zilber School of Public Health Best New Development or Renovation Health Care/Education The Kenilworth Building 2 Projects Underway Campus • Children’s Learning Center – NWQ • Kenwood IRC • Kenwood IRC Greenhouse – NWQ • NWQ Redevelopment Plan • South West Quadrant Redevelopment Planning • School of Freshwater Sciences School of Freshwater Sciences • • • • • • $50.0 Million Construction began July 2012 Opens Spring 2014 Only one of its kind in Western Hemisphere Multi-disciplinary Research - Collaboration Kenwood Interdisciplinary Research Complex • • • • $80.0 Million Construction began August 2012 Opens Spring 2015 Research Facility for Physics and Zilber School of Public Health • Core Facilities will be used University wide Kenwood Interdisciplinary Research Complex Greenhouse - NWQ • • • • Approx. 8,900 GSF Construction began December 2012 Opens Summer 2013 Replacement of existing Lapham & Great Lakes Research Facility Greenhouse facilities • Allows for future expansion Children’s Learning Center - NWQ • • • • $11.98 Million Capital Costs Favorable bids received January 2013-under budget Opens January 2014 Serves UWM Students, Faculty, Staff, and Alumni Association members (space permitting) • Faculty and staff from various academic units utilize the Children’s Center for training and research Children’s Learning Center - NWQ NWQ Redevelopment Plan • • • • • • Provide surge space Planning for long term use of NWQ Include an infrastructure improvement plan Identify future Major Projects Pre-design being completed for each project Effort complete in Spring 2013 South West Quadrant Redevelopment Planning • Starting Summer 2013; complete Fall 2014 • Comprehensive assessment and implementation plan to address the campus needs of the Southwest Quadrant • Identify future Major Projects Infrastructure & Classroom Projects Spring/Summer 2013 1 – Steam Tunnel Chapman Hall Parking Lot 2 – Bolton Hall Move From NWQ Surge Space 3 – Holton, Merrill, Johnston Hall Move To NWQ Surge Space 6 4 4 – Sandburg Hall 5 Steam Work 2,3,7 1 5 – Sandburg Hall South Tower Window Project 6 – Sandburg Hall North Tower Roof Project 7 – Classroom Upgrades, NWQ 8- Performance Contracting/Energy Conservation 2 3 Steam Tunnel Chapman Hall Parking Lot • Lot will be partially closed until September 2013 • A small number of visitor parking spaces will still be available in the Chapman Hall Parking Lot. • Englemann Hall Parking Lot will also be under construction for a short period this summer. Bolton Hall Move From NWQ Surge Space Holton, Merrill, Johnston Hall Move To NWQ Surge Space Sandburg Hall Steam Work South Tower – Window Replacement • Construction starts May 2013, completion September 2013 • Final phase of the Sandburg Hall window replacement project that was started in the summer of 2012 • Replace 1500 windows North Tower – Roof Replacement • Replace about 6,000 SF of roof to address current leaking, weathered, worn, and damaged section • Construction starts May 2013, completion October 2013 Classroom Upgrades - NWQ Teaching & Learning Center D Classroom Upgrades - NWQ Teaching & Learning Center • Construction begins Fall 2013, open for classes 2014 • 1st floor NWQ D Building, later to expand into ground level • 5 new active learning classrooms & 2 new computer classrooms: classrooms for project, and group learning, equipped with technology to facilitate learning • Expanding PASS from current Bolton and Library locations Performance Contracting/Energy Conservation • • • • • • • • • • Chilled Water System Turbine Renovation East Substation Switchgear Replacement Energy Conservation-Sandburg Heat Plant Oil Tank Leak Containment Replacement HVAC Improvements-Downer Buildings HVAC Renovation-Bolton NWQ Central Utility Extension NWQ Fire Alarm & Telecommunications Updates NWQ UST Replacements Steam Lateral Replacement-Phase II • • • • • • • • Spaights Plaza Water Line Replacement UWM Power Plant Cistern Project Code compliance improvements-USR Elevator renovations-Bolton, Library, Mitchell, NWQ Exterior envelope repair-Arts Center, Downer Buildings Exterior window replacement-Sandburg South Fire egress & security improvements-EMS Roofing projects-Chapman, Sandburg North Capital Budget 2013-2015 • General Funds Support Borrowing (GFSB) • Final funding for the Kenwood IRC ($30 Million) • Authority to design Innovation Campus in 13-15 biennium; construction funding in 15-17 Biennium, ($75 Million) • Infrastructure upgrades at NWQ • Capital Budget Program Revenue Projects • Student Health Services - NWQ • Restaurant Operations/Town Hall - NWQ • Union Capital Budget 2015-2017 • Geoff Hurtado and Karen Brucks have met with the Deans to start working on Planning Issues and Themes for the next budget cycle. • System Retreat April 11, 2013 New Leased Spaces Space being leased • Global Water • Under Construction • Opens 2014 • Innovation Accelerator at Innovation Park • Under Construction • Opens 2014 For further project updates please visit our website: http://www4.uwm.edu/uap/projects/ (Live Link) Questions 23 INSITE Consortium Update 24 INSITE Consortium Update 25 26 Facility Services TMA Update & FPI Report April 26, 2013 28 Status Update WebTMA Enterprise – Computerized Maintenance Management Solutions (CMMS) currently being implemented in Facility Services Manage work flows of all Facilities' services Currently organizing data to be entered into our own database Workflows will be defined in 2 months Expected to be set up to summer go live by the end of this http://www.tmasystems.com/ What is APPA? APPA – Leadership in Educational Facilities is now the largest international association of educational institutions and their facilities and physical plant departments. APPA, stands behind the values of: Vision Transformation Stewardship Collaboration Leadership What is the FPI Survey? APPA Facilities Performance Indicators: Make the Business Case for Your Facility Needs Successfully Address Capital Asset Realities Create a Balanced Performance Scorecard Based on Critical Data Findings Compare and Contrast Your Facilities Operations with Other Institutions Align Facilities Planning with the Mission and Vision of your Institution Gross Institutional Expenditures 36 37 38 What is STARS? The Sustainability Tracking Assessment & Rating System (STARS) is a national standard developed by AASHE -UWM’s choice for benchmarking our current level of sustainability throughout all facets of campus (Education & Research, Operations, Planning, Administration, and Engagement) What have we learned? As part of Operations reporting, we compiled a campus-wide Greenhouse Gas Inventory featuring past energy consumption and expenditures UW-Milwaukee Energy/GSF 0.18 0.16 0.14 mmBTU/GSF 0.12 0.1 0.08 mmBTU/GSF 0.06 0.04 0.02 0 FY05 FY06 FY07 FY08 FY09 Fiscal Year FY10 FY11 FY12 GHG Inventory • What does the GHG inventory tell us about energy usage? UWM Electricity Consumption 350000 300000 Foundation Buildings (mmBTU) 200000 150000 100000 Off Campus Buildings (mmBTU) 50000 Main Campus mmBTU UWM Gas Consumption 700000 600000 0 500000 Fiscal Year mmBTU mmBTU 250000 Off campus Gas Consumption 400000 300000 200000 Main Campus & Main Campus Small Accts mmBTU 100000 0 Fiscal Year