Case studies for week 1. Comparison of 2 case studies per subject in teams of 2. Team 1 – beams Beams. The angel building – new atrium roof beams, Islington EC1V 4AB Beams. Bridge of Aspiration, Wilkinson Eyre, Covernt garden London Team 2 - Trusses Trusses. Kingsland road rail bridge , East London, E2 8DA Vierendeel Truss Bridge at Grammene, Belgium Team 3 - slabs Slabs. National Gallery, Mies van de Rohe Berlin Slabs. Queen Elisabeth hall foyer, Southbank centre, London Team 4 - cantilever Cantilever. Zaha Hadid Aquatic Centre – diving boards, Olympic park Stratford Cantilever. Vauxhall bus station, London Team 5 (cantilever extension from existing) Cantilever. Richard Desmond Childrens Eye Clinic, Mile End hospital, Whitechapel Palestra_Will Alsop, Architects, 197 Blackfriars Rd, London Team 6 Balcony “The Rucksack House by Stefan Eberstadt” Köln, Leipzig 2004 Balcony Adelaide warf – queen bridge road Wozoco, MVrRDV, Amsterdam Team 7 – Highrise #1 (stability frame) Neo Bankside, Southbank, London gerkin Stability systems in High-rise buildings. The Gherkin (Swiss Re bank), 30 St Mary Axe , London Team 8 – Highrise # 2 (stability core) Stability systems in High-rise buildings. The shard, Joiner Street, London SE1 Stability systems in High-rise buildings. Leadenhall Building (Cheese grater) – 122 leadenhall street, East London Team 9 – Frames Frames. Paleys Upon Pilers, Aldgate, London, Studio weave Frames. Bermondsey square bike store, London – Sarah Wigglesworth architects Team 10 – Columns Columns. Turbine hall columns, Tate modern, London Columns. 02 Arena /Millennium Dome, Greenwich Peninsula, SE10 0DX London Columns Arnos grove station, London Team 11 – Arches Arches. Canary wharf tube station, London Arches. The Dodges Palace (Palazzo Ducale), Venice, Italy Team 12 – Suspended – bridges / cable net Tower Bridge, London Albert Bridge, Battersea, London