Building Safety Division
Planning and Development Services
8500 Santa Fe Drive
Overland Park, Kansas 66212
913-895-6266  Fax: 913-890-1266
www.opkansas.org
January 7, 2008
Brian Foxworthy
Incite Design Studio / The Phoenix Group of Overland Park
brian@incitedesignstudio.com
7311 West 75 Street
Overland Park, KS 66204
Plan Review Number: PRS2007-00592
Project Name: 7924 SANTA FE BUILDING
Project Address: 7924 Santa Fe
The Planning and Development Services Department reviewed the plans submitted on
December 20, 2007. The following comments are from various divisions within the
Planning and Development Services Department.
When resubmitting your plans, include a cover letter complete with
project name, address, and plan review number, and indicate how you
have addressed each plan review comment.
Building Safety Division - Plan Review
The following comments are from the Building Safety Division-Plan Review. Direct any
questions regarding these issues to Steve Mosebach at (913) 895-6266.
1.
The revised electrical drawings submitted to the city were not sealed by a design
professional licensed with the state of Kansas.
2.
Repeat comment: The supporting construction for the stair terminating on the second
floor shall be 1-hour fire rated per Section 706.5 of the 2006 International Building
Code. This would include any walls, beams, and columns that are supporting the
masonry stair enclosure. The two beams (W21x44 & W 24x62) on Grid Line D,
between Grid Line 1 and 3 shall also be fire rated. The columns at Grid Lines B6, B-10, D-1, D-2, D-3, and D-6 shall also be fire rated. Just as the plans identify
U.L. assemblies for wall construction, the designer shall also indicate the U.L. or
other accredited agency designs for all fire rated beams and columns on the plans
as well.
Brian Foxworthy
January 7, 2008
Page 2
3.
Repeat comment: The supporting construction for the fire barrier walls enclosing the
Office Lobby A205 (exit passageway) shall afford the required fire-resistance rating of
the fire barrier supported per Section 706.5 of the 2006 International Building Code.
This would include all beams, girders, columns, floor slab, etc. The two beams
(W24x62 & W21x44) on Grid Line D, between Grid Line 2 and 6 shall also be
fire rated. The columns at Grid Lines D-2, D-3 and D-6 shall also be fire rated.
4.
New comment: Just as the plans identify U.L. assemblies for wall construction, the
designer shall also indicate the U.L. or other accredited agency designs for all fire
rated beams and columns on the plans as well.
5.
Repeat comment: The plans do not show how sufficient working clearance in front of
the electrical panels will be maintained per Section 110.26 of the 2005 National
Electrical Code. Provide a floor plan that clearly diagrams the working clearances at
Service Room A109. Page E2.1 does not show a physical barrier or other method
to keep trash dumpsters or other equipment from being placed within the
required working clearances of the electrical equipment (MDP1 and MDP2) as
required by the 2005 National Electrical Code.
The following shall be completed at a later date, but will not delay the issuance of a building
permit:
1.
Submit complete fire sprinkler plans and hydraulic calculations for review and
approval, prior to installation of the system. The system shall be designed per NFPA
13 – 02.
2.
Submit complete plans for the fire alarm system per Section 907.2.9 of the 2006
International Building Code, prior to installation of the system. An emergency/voice
alarm communication system is required per Section 907.2.12.2 of the 2006
International Building Code.
3.
All exterior plywood sheathing shall be fire-retardant treated per Section 603.1 of the
2006 International Building Code. See pages A7.2, A7.3 and A7.4.
4.
Where there are four or more dwelling units to be occupied as a residence in a single
structure, every unit shall be a Type B dwelling per Section 1107.6.2.1.2 of the 2006
International Building Code.
5.
An electronic drawing showing impervious surfaces for use in calculating the Storm
Water Utility Fee shall be provided to Planning and Development Services prior to
issuance of Certificate of Occupancy or Certificate of Compliance. Please refer to the
enclosed Impervious Surface Drawing Requirements. Questions should be directed to
Dave Fullerton at (913) 895-6228 or dave.fullerton@opkansas.org.
Overland Park Fire Department
The Overland Park Fire Department has approved the plans as submitted.
Brian Foxworthy
January 7, 2008
Page 3
Current Planning Division
The following comments are from the Current Planning Division. Questions regarding these
issues should be directed to Keith Gooch at (913) 895-6181.
1.
Staff has requested more information on the brick paneling system and the ability to
limit the visibility of the joints between the panels. Please let staff know if there is an
update.
2.
The transformers shall be screened by landscaping on both the north and south sides.
Staff is checking with the Park’s Department to determine if they are willing to
maintain this new landscaping.
Engineering Services Division
The Engineering Services Division has approved the plans as submitted.
Permit applicants must obtain a Johnson County Contractor License prior to issuance of a
building permit in the City of Overland Park. For more information, please contact Johnson
County Contractor Licensing, (913) 715-2233, 111 South Cherry, Room 1056, Olathe,
Kansas 66061, or http://contractorlicensing.jocogov.org.
If you have questions or alternatives to discuss on the above-mentioned items, please contact
the appropriate person above.
Steve Mosebach, MCP - Senior Plans Examiner