Dulles Connector Sound Wall PARDON OUR DUST MEETING July 25, 2013 – 7:00 PM to 9:00 PM McLean High School 1633 Davidson Rd, McLean, VA 22101 Project website: http://www.virginiadot.org/projects/northernvirginia/dulles_connector_sound_walls.asp WELCOME! • John C. Muse District Environmental Manager • Chan B. Basnayake Area Construction Engineer 2 http://www.virginiadot.org/projects/northernvirginia/dulles_connector_sound_walls.asp Tonight's Objective: • Introduction of the Construction Team • Present Project Scope of Work • Construction Elements – Sequence of Construction – Lane Closures – Night Work • Questions and Answers 3 http://www.virginiadot.org/projects/northernvirginia/dulles_connector_sound_walls.asp Project Team • Virginia Department of Transportation • Contractor: Lane Construction Corporation 4 http://www.virginiadot.org/projects/northernvirginia/dulles_connector_sound_walls.asp Tonight's Objective: • Introduction of the Construction Team • Present Project Scope of Work • Lane Closures 5 Construction Team & Contact Information VDOT Construction Management Team: • Chan B. Basnayake, PE, PMP – Area Construction Engineer – (703) 259-2947 chan.basnayake@vdot.virginia.gov • Giles Njumbe P.E. – Construction Manager – (703) 259- 3250 giles.njumbe@vdot.virginia.gov • Divakar R. Reddy – Office Engineer – (571) 329-0187 divakar.reddy@vdot.virginia.gov • Abdul Razak – Project Inspector – (571) 722-2201 abdul.razak@vdot.virginia.gov • John P. Godwin– Sr. Inspector (Structural) – (571) 898-5227 john.godwin@vdot.virginia.gov VDOT Field office : 6 8245 Boone Blvd, Suite 530, Tysons Corner, VA Tel: (703) 847-1710 Hours of Operation: Mon-Fri – (7:00 AM to 3:30 PM) Construction Team & Contact Information continued VDOT Design Team: • Lee Ann Hall, P.E. – Assistant Section Mgr. L&D – (703) 259-2746 LeeAnn.Hall@vdot.virginia.gov • Hamid R. Misaghian, P.E.– L & D Consultant Mgr. – (703) 259-1795 H.Misaghian@vdot.virginia.gov • Brad Stimpson, P.E.– Design Consultant McCormick & Taylor Contractor: Lane Construction Corp.: • Jan Sherman– Assistant District Manager – (703) 222-5670 jasherman@laneconstruct.com • Jim A Ballentine– Project Manager – (571) 358-5390 jaballentine@laneconstruct.com • Will Haynie – Superintendent – (703) 371-0648 ewhaynie@laneconstruct.com 7 Project Location 8 Project Timeline • Contract Executed: May 21, 2013 • Notice to Proceed Date: June 5, 2013 • Start of Construction: June 14, 2013 • Substantial Completion: November 21, 2014 • Final Completion: May 29, 2015 9 Project Information BEGIN NB Sound Wall END NB Sound Wall BEGIN SB Sound Wall END SB Sound Wall 10 Allowable Lane Closure: •Single lane closures on NB and SB Dulles Connector Road are allowed from 9:30 PM to 5:00 AM, with the exception of Friday night and Saturday night when these closures are permitted from 10:00 PM to 6:00 AM. •Shoulder closures during the day are permitted from 10:00 AM to 3:00 PM (NB), and 10:00 AM to 2:00 PM (SB). •Total closure of the roadway for a maximum duration of 20 minutes is permitted from 12:00 AM to 5:00 AM. 11 Tonight's Objective: • Construction Elements – Sequence of Construction – Night Work 12 Construction : Sequence Construction Phases: • Phase-1 (Southbound), Chain Bridge Road to I-66. • Phase-2 (Northbound), I-66 to Chain Bridge Road. • Work on each Phase is divided into three segments. Clearing & Grubbing shall be confined to those areas required for access to and physical placement of the new sound barrier wall, erosion control devices and temporary safety fence. To the extent possible, all other existing vegetation shall remain. 13 Phase 1: Southbound Aug 15, 2013 to Mar 26, 2014 • Section 1 – Sta. 10+00 to Magarity Road • Section 2 – Magarity Road to Pimmit Run • Section 3 – Pimmit Run to Sta. (107+15.16) 14 Phase 1: Southbound Typical Section-A 15 Phase 1: Southbound Typical Section-B 16 Phase 1: Southbound Typical Section-C 17 Phase 1: Southbound Typical Section-D 18 Phase 1: Southbound Typical Section-E 19 Phase 1: Southbound Typical Section-F 20 Phase 1: Southbound Typical Section-G 21 Phase 2: Northbound Mar 27, 2014 to Oct 20, 2014 • Section 1 – Sta. 118+65.72 to Pimmit Run • Section 2 – Pimmit Run to Magarity Road • Section 3 – Magarity Road to Sta. (11+48.59) 22 Phase 1: Northbound Typical Section-H 23 Phase 1: Northbound Typical Section-I 24 Phase 1: Northbound Typical Section-J 25 Phase 1: Northbound Typical Section-K 26 Phase 1: Northbound Typical Section-L 27 Phase 1: Northbound Typical Section-M 28 Night Work Sensitive work such as • Caissons, Posts & Panel on an as needed basis. 29 Project Schedule 30 Project Schedule- continued 31 Project Schedule- continued 32 Question & Answer Session 33 http://www.virginiadot.org/projects/northernvirginia/dulles_connector_sound_walls.asp