COUNTY OF ALLEGHANY, VIRGINIA Planning and Zoning Department 9212 Winterberry Avenue, Suite A Covington, VA 24426 (540) 863-6650 Chapter 527 – Traffic Impact Analysis Compliance In compliance with VDOT’s new Traffic Impact Analysis Regulations, Chapter 527, development plans that meet the regulations thresholds will require the submittal of a Traffic Impact Analysis (TIA’s). Effective January 1, 2008, this form must be completed by the engineer or developer and submitted with the development plans to the Alleghany County Planning Department. The landowner/developer is responsible for compliance with the VDOT Chapter 527 – Traffic Impact Analysis (TIA) (24 VAC30-155) requirements. All developments that have vehicle traffic counts that conform to Chapter 527 requirements will be forwarded to VDOT for their review and comments. The landowner/developer is responsible for costs and fees associated with a TIA. The process for submitting TIA’s shall be as follows: 1) Submit VDOT’s required number of copies along with your development plans to the Alleghany County Planning Department; 2) All copies of the TIA will be stamped by the Planning Department, and one copy will be kept on file at the County with the development plan; and 3) the remaining copies of the TIA’s and VDOT review fee will be delivered to VDOT by the County. Action will not be taken on your development plan until comments are received by VDOT in the time allowed by Chapter 527 regulations. Choose one of the following two options below: ______I certify that this proposal DOES NOT MEET any of the thresholds identified in the Traffic Impact Analysis Regulations Administrative Guidelines (24 VAC30-155) that would require a Traffic Impact Analysis to be submitted in conjunction with this proposed development plan. ______ I certify that this proposal MEETS at least one of the thresholds identified in the Traffic Impact Analysis Regulations Administrative Guidelines (24 VAC30-155) that would require a Traffic Impact Analysis to be submitted in conjunction with this proposed development plan. A Traffic Impact Analysis, prepared in accordance with the Traffic Impact Analysis Regulations Administrative Guidelines (24VA 30-155), and the appropriate review fees are attached. The above is based on a projected daily trip generation of ______________ vehicles per day and a site peak hour trip generation of _____________ vehicles per hour, based on the stipulations of 24 VAC30-155. Signature of Developer/Engineer: _______________________________________________ Date: ___________________________ For more information regarding Chapter 527-Traffic Impact Analysis go to VDOT’s web page at www.virginiadot.org/projects/chapter527 or contact the Virginia Department of Transportation (VDOT) - Lexington Residency at 540-463-3108.