Sri Lanka Institute Of Information Technology Report on Industrial Training at Sanken Construction (Pvt) Ltd Name: Sulakshana G.G.R Registered No: EN19356150 Course: B.Sc. Engineering (Hons) in Civil Engineering Field of Specialization: Civil Engineering Module Name: Industrial Training I Period of Training: 21/09/2021 to 12/12/2021 - 12 week 1 Abstract The training was carried out at Capitol Twin Peaks; it is located at 24 staple St, Colombo 02 and is the largest project that is done by Sanken Constructions (Pvt) Ltd. This building is an apartment complex that consists of a range of apartments that are from 750 SQFT to 2750 SQFT that are located throughout 50 floors to form 475 apartments. In this complex there is also 1400 meter square (15,000 square feet) of common area facilities and 2300 meter square (25,000 square feet) of commercial facilities. This project started on 2018 December (Piling) and the initiation of the handing over was to start on 2021 December. The period in which I joined this project was during the finishing stage and I was put under the finishing department under Mr. Chaminda. In this department I was able to learn about the façade work and external finishing work in Tower 1. During my 12 weeks of training I was given the responsibility of carrying out checkup on the façade and aluminum windows and door. By creating a checklist I was able to find the defaults and supervise the rectification of the damages and carrying out inspection on the apartments so they can be handed over. Along with this I was also given responsibility to supervise the external work carried out in the voids and exterior of the building (from gondola). To carry out work from the gondola I was also in charge of checking the safety of the gondola. 2 Acknowledgement Mr. Samantha - Project Manager Mr. Chaminda - Finishing Manager (Department Manager) Mr. Niyomal - Trainer Mr. Sadun - Trainer Mr. Kasun - Trainer 3 4 List of Tables 5 Contents Abstract 2 Acknowledgment 3 List of Figures 4 List of Tables Contents 5 6 1. Introduction 7 1.1. Vision and mission 1.2. Company Background/history 1.3. Management 2. Training Experience 2 2.1. Summary of Duties 2.2. Projects involved 2.3. Problems encountered and approach of solving 3. Conclusion 3 References Appendices 6 1 Introduction Sanken Construction (Pvt) Ltd is an organization with over 30 years of experience. Some of its products and services include: Construction Contracts Property Development Ready-Mix Concrete Hiring of Scaffoldings Design and build Consultancy Hiring and leasing of machinery Trading/ Piling/ Training and Skills The Vision and Mission of Sanken Constructions are: Vision - To be Sri Lankan’s premier construction service provider. Mission – To provide a quality professional service exceeding customer expectations by the effective utilization of all resources with the best practice of the industry. The below Figure (Figure 1) shows the organizational cart, Figure 1 7 2 Training Experience 2.1 AC PLINTH Methodology of AC Plinth The surface of the slab is made rough using a jack hammer. The surface is cleaned and using a hammer drill every 200mm a hole is drilled to create a grid. To this, steel bars of appropriate length were inserted along with adhesive (Chemifix plus mortar). Then the R/F bars are placed horizontally to create a grid, and binded together using a binding wire. Afterwards, a formwork using plywood was made. Firstly wooden blocks are placed around and secured to the ground. (2 x 2 inch wooden planks) To this, the plywood was attached perpendicular to the ground to create the formwork. Then diagonal 2 by 2 were placed between the top of the formwork and ground using a set triangle to check the level (perpendicular) When concreting, firstly an adhesive was applied to the surface of the ground. Then after preparing the concrete, it was poured into the formwork adding layer by layer. During this step, formwork was softly hit with a hammer as a substitution of a poker. After applying the final layer, the surface was made even by using an aluminum square edge and sponge. Note: When mixing the concrete I learnt that the orderin which the material are added is as followed, Sand => Cement => Stone (Aggregate ) => Water The reason why it is mixed in this manner is because it enables the final concrete to be properly mixed, if not properly mixed it can affect the quality and standards of the concrete. 8 9 2.2 SETTING OUT FOR TILING For tiling According to the drawings the markings should be made. When putting the markings on a tile, a 200mm off is marked to allow more accuracy when laying out the tile and acts as a guide. (Theodolite) For vertical marking (bathroom) the markings are made to the 1000mmoff from slab level. (SSL) For horizontal tile work, pegs are placed by checking the level. (Using the level) The pegs allow the correct height of a tile to be obtained for the finish floor level. (FFL) For strip windows For strip windows, the 1000mm off is marked on either side to enable the window to be installed in correct level (Using level or laser) 200mm off is also marked to allow the window to be parallel with the marking. For walls (ICC Panel) Using the Theodolite and tape, a 200mm off is marked from the wall. Using this marking, laser level and tape the depth of each panel is checked and the measurements are marked on each panel for rectification. Ex: - If reading is 195mm the 5mm need to be grinded. - If reading is 205mm then 5mm need to be filled (plastered). 10 2.3 STRIP WINDOW INSTALLATION Methodology of strip windows installation Firstly, the outer frame of the aluminum frame was assembled. Then the frame was installed and secured using set anchor bolts. Silicon was then applied around the edges and the locations of the anchor bolts. Afterwards, the window frames are installed by clipping onto place and securing it. (Screw and/or pop rivet). Then the outer case that join together the outer frame window frame are clipped together. After the main parts are assembled the locks, hands and locking plate are then installed. In this stage it is highly important to align the locks and locking plate in place in other to have a smooth lock. Finally anchor hole caps, silicon, gasket, and beading are installed. Note: 1) Before installing the frame, the dimensions of the location of the strip window need to be checked. If there are any adjustments, it needs to be rectified. (Grinding or plastering) 2) The bottom section of the slab needs to be water proofed and a slope should be present to allow the water to slide outwards. 3) Each opening to install the windows need 8mm extra of that of the frame. 2.4 SILICON WORK Methodology of silicon work Silicon work on exterior strip windows Firstly, the surface of the gap needs to be cleaned. Secondly, if the substrate defects must be rectified. Then before applying the silicon, masking tape is used to create a boundary. The tape should be applied on either side of the gap which is the wall and window frame. If the gap between the frame and wall is greater than 5mm, thin foam tube of 15mm5mm is inserted into the gap. 11 The silicon is then applied and using a scraper the silicon is spread evenly and the finishing is obtained. Finally the meeting tube is removed gently making sure no damage is done to the silicon work. Note: 1) It is important that silicon is applied in dry conditions as it can peel off. 2) When inserting the foam tube, insert in a manner that is 5-3mm in depth. 3) The cure process takes around 24 hours. Therefore after completion, the silicon should not be touched. 2.5 WATER PROOFING Methodology of water proofing slab (Facade) Firstly the surface is cleaned. Then a spot level check is carried out and rectifications are done by grinding. Any holes are filled with mortar. (Note there is a slope.) The surface is again cleaned and waterproofing is prepared. The waterproofing used is Greenseal Flexi201; this is prepared by mixing Part A (powder) with Part B (liquid) in a 1:1 ratio. Then using a brush the waterproofing is evenly spread throughout the surface and left to dry. Note: It is important that the water proofing is applied dry conditions and the surface is dry and clean. When applying the water proofing, it is important to check that the slope of the surface is outwards. (to the exterior side.) Problems/Issues As the entire amount of Part A and Part B are not fixed, if mixing the portion by portion. Towards the end the amount of the part B will usually be less. Therefore, it is advised to put a small amount of water to avoid this problem. For 23kg of Part A and 10kg of Part B, 1 liter of water can be added. 12 2.6 TILING Methodology of tiling All the surfaces need to be cleaned and a bed of screed (1:3, cement : sand) or 1:2:4 chip concrete to be applied. Any uneven surface need to be rectified by grinding. Then why laying down the tiles, the tile marking needs to be marked clearly. Then tile adhesive is applied on the surface with trowel and combed using a notched trowel Tile adhesive should be applied on the bottom and gently placed and pressed down using a mallet. After placing another tile, the required tile group is obtained by placing tile spacers. (Ex: - 2mm) Also the evenness of each tile as it is placed must be checked. This can be done using a 50mm x 50mm Aluminum hollow bar of a granite block (small even object) and alternations need to be done within 10min. After completion, soundness checks for hollow tiles are carried away. The incorrect tiles should be removed without any damage to other tiles. The surface must be cleaned and remove debris to repeat this placement steps. Finally, tile grout is added between the tiles after the grooves are cleaned. 13 2.7 TIMBER FLOORING Methodology for Timber flooring Firstly, the surface of the slab is cleaned. Then a layer of 100mm of leveling screed was applied and wooden battens were placed every 300mm. Next, the surface is again cleaned and made sure the surface is of correct level. Then again masonry is added between the battens to secure in place. When installing the planks, it is started at one corner and continued from that point. Before installing the first plank (next to door opening) Aluminum strip is first installed. After aligning the first plank, it is nailed in place (to batten) using a nail gun. Adhesive is also applied at regular random points along the planks. (For additional bandage) For the last set of planks, adhesive is added and spacing bar or a wedge was used to keep the plank stationary. Afterwards, the timber skirting is installed by measuring and cutting out a required skirting. This was installed along the border of the room attached using brad head nail and adhesive. Finally, the nail holes are covered in wood filler. Note: 1) It is important to leave a 5-8mm gap around the boarder of the room to allow expansion. 2) Level between tile from corridor and timber in room should be same level (smooth surface) 3) Any excess adhesive should be cleaned immediately and non-water base adhesive to be used. 4) Use mallet to install the timber planks in place if difficult. 5) Insulative sheets were used to prevent water damage (Put between ground and planks). 14 15 2.8 HANDRAIL GLASS Methodology for Handrail Glass The surface is cleaned and the end of level is checked, any rectification are then done by grinding. Then according to the measurements, the brackets are installed using set anchor bolts. The baluster are then installed and screwed in place. Rectification of the baluster is then taken adjusted accordingly. To this the glass is then installed with extra caution as the glass can crack. The bolts are then tightened in place, after all the glass is installed the level (evenness) of the glass if again checked and rectified. Finally the handrail is installed and tightened in place, silicon is then applied at all the joint areas. 2.9 DOOR INSTALLATION Methodology of Door installation Outer frame of the wall at which the door is installed is made rough using jack hammer. At appropriate locations the wall are drilled to install set anchor bolts. After placing the set anchor bolts, they are locked in place. Then the door frames are installed steel plates are first installed using screw nails. The door frames are then placed and the level is checked using set square, plumb bob and spirit level. Then the door frames are welded onto the anchor bolts using L brackets. Afterwards, cutouts are made to install the door hinges. The door hinges are installed and appropriate curtains are made on the door. Foam is then applied between the wall and door frames. Th excess from needs to be then removed. Afterwards, frame casing needs to be installed. Finally, the lock set is installed. 2.10 PAINTING Methodology for painting 16 Firstly, need to check whether the substance is fully cured. Any rectifications are made by grinding and plastering. Afterwards, skin coat is applied and left to dry, then it is sand-papered to obtain a smooth substance. Paint is then applied on the surface. Paint was applied using a roller brush. Errors/Problems faced For one section (area) the point that was applied after drying had a different tone. For this area paint was again applied; however, extra water was added so the color difference can be avoided. Note: 1) An important point to note is when applying putty, it is applied on surfaces that require 3mm or less. If the area to be filled (for rectification or otherwise) is more than 3mm then wall plaster is applied. Wall plaster is prepared by adding water in a 1:1 ratio and mixing. Putty is prepared by adding water in a 2:1 ration (Putty : Water) (Manufacture instruction may vary) 2.11 FACADE Methodology for Facade First, the brackets were attached to each frame (beams). Then using a 4 wheel trolley and floor crane each section of the frame is installed using anchor bolts. After a section is using a level and plumb bob the section is rectified. All the vertical sections are first assembled. Then the horizontal sections are also placed in place and after checking the level it is welded on place. Filling is then used to cover the welding and obtain a finishing. Then the aluminum frames (windows) are installed in the same manner. Firstly, the outer frame is assembled and attached and then the glass is installed. Using bolts the frames are secured in place. 17 Note: 1) The steel frames are powder coated in galvanized paint. (To prevent corrosion) Problems faced One main issue that had to be faced was that the drawings for the steel frames did not consider the length of the bridge. Because of this one section of the frame could not be installed. This section was then rearranged with approval to allow the frame to be complete. 3 Conclusion In conclusion I learnt that the finishing stage of a project is as important as the structural stage, during this stage also there was much to learn. I contributed to this project by carrying out the checkups for each apartment for them to be rectified and to be handed over and during this work I would state that some of my ideas were taken into consideration regarding the safety of the aluminum door that was installed (suggested to change the layout of the hand lock to increase security of the apartment). I also learnt that along with the application of both practical and theoretical knowledge it is also important to understand labor/worker handing. To enable work to flow more efficiently 18 Appendix I 19 References [1] …………………………………. [2] ………………………………….
0
You can add this document to your study collection(s)
Sign in Available only to authorized usersYou can add this document to your saved list
Sign in Available only to authorized users(For complaints, use another form )