Exercise 1
a. Average = 7+8+((10*(1/10)+15*(1/15)))/(5/30)+12= 39 minutes
((10*(1/10)+15*(1/15)))/(5/30) = 12 mins (weighted average)
b.
B1: 60/7 = 8.57/hour
B2: 60/8 = 7.5/hour
B3-a: 60/10 = 6/hour
B3-b: 60/15 = 4/hour
B4: 60/12 = 5/hour
B3-b is the bottleneck when treating all the steps individually, if you combine B3, B4
becomes the bottleneck with B3 becoming 10/hour.
c.
As people can use either B3, B4 becomes the bottlenech so a maximum of 5 customers per
hour.
Exercise 2
a.
Group portrait: 5+((5*(1/5)+7*(1/7)))/(12/35) + 20 + 7 = 37.833
((5*(1/5)+7*(1/7)))/(12/35) = 5.833
b.
The group portrait as it takes the longest (3/hour)
c.
For individuals the longest step is picture taken (15) so 4/hour
For groups the longest step is the picture (20) so 3/hour
Exercise 3.
a.
For type A, T4 is the bottleneck with the longest time (18), so 3.33 customers/hour
b.
0.3*(60/18) + 0.7 * (*60/22) = 2.909 customers / hour
c.
For Type A only (no Type B): Bottleneck is T4 at 3.33 ppl/hr. Waiting begins when arrival rate
exceeds 3.33 customers/hour (i.e., more than ~1 customer every 18 min)
For Type B only (no Type A): Bottleneck is T6 at 2.73 ppl/hr. Waiting begins when arrival rate
exceeds 2.73 customers/hour (i.e., more than ~1 customer every 22 min)
Since the problem states arrival rate > 5/hr:
Type A would wait at T4 (bottleneck at 3.33 < 5)
Type B would wait at T6 (bottleneck at 2.73 < 5)
Exercise 4.
Time each workstation spends per week
First find weekly demand: A = 90 units/wk, B = 85 units/wk
Workstation W:
Product A Step 1: 90 × 10 min = 900 min
Product B Step 2: 85 × 14 min = 1,190 min
Total = 2,090 min/wk
Workstation X:
Product A Step 2: 90 × 10 min = 900 min
Product B Step 1: 85 × 20 min = 1,700 min
Total = 2,600 min/wk
Workstation Y:
Product A Step 3: 90 × 15 min = 1,350 min
Product B Step 3: 85 × 11 min = 935 min
Total = 2,285 min/wk
Workstation X is the bottleneck — it has the highest aggregate workload at 2,600
min/wk, exceeding available capacity of 2,400 min/wk.
Exercise 8
Available time at X (bottleneck): 2,400 min/wk
Contribution Margin per unit:
Product A: Price - Variable costs = $55 - $2 - $3 = $50/unit
Product B: Price - Variable costs = $65 - $5 - $5 = $55/unit
a.
Rank by highest contribution margin → B ($55) then A ($50)
Produce B first (up to demand of 85 units):
B uses X: 85 × 20 = 1,700 min
Remaining: 2,400 - 1,700 = 700 min
A uses X: 700 ÷ 10 = 70 units of A
Profit:
Revenue: (85 × $65) + (70 × $55) = $5,525 + $3,850 = $9,375
Material costs: 5*70+10*85= 1200
Overhead = 3500
Labor =
Minutes producing B: 85* (20+14+11) = 3825/60*6= 382.5
Minutes producing A: 70 *(10+10+15) = 2450/60*6= 245
245+382.5= 627.5
Profit = 9375 - 1200 – 3500 – 627.5 = 4047,50 dollars
b.
A:
Contribution margin = 50
Time at bottleneck = 10
Contribution / unit = 5 / minute
B:
Contribution margin = 55
Time at bottleneck = 20
Contribution / unit = 2.75 / minute
First fulfil A demand: 90 units
This use 90 * 10 = 900 minutes of X
X left for product B = 1500/20 = 75 units of B
Revenue = 90 * 55 + 75 * 65 = 9825 dollars
Materials = 90 * 5 + 75 * 10 = 1200 dollars
Overhead = 3500
Labor:
Time spent on A : 900 + 900 + 1350 =3150
Time spent on B: 1050 + 1500 + 825 = 3375
Labor costs = (3150 + 3375)/60 * 6 = 652,50
Total revenue = 9825 – 1200 – 3500 – 652,5 = 4472,5
c.
Profit gain: 4472.5 – 4047,5 = 425 dollars
10.5% increase