CONSTRUCTION MANUAL MI/MP/ 38 Rev: 02, Date 06.06.2016 13 ParaWebTM M AC C AF ER R I REINFORCED SOIL WALLS © C O PY R IG H T ParaWebTM REINFORCED SOIL WALL CONSTRUCTION MANUAL MACCAFERRI Components of ParaWeb™ Rei nforced Soil Wall System MACCAFERRI ENVIRONMENTAL SOLUTIONS PVT.LTO. CONSTRUCTION MANUAL FOR PARAWEB™ REINFORCED SOIL WALL AF ER R I Prepared by: Document Author Project/Organizational Role Mr Jayram Kamath Manager - OS Mr Thomas Cherian AGM -OS Reviewed By: Date IG 05.09.2012 06.08.2013 06.06.2016 • • • • Change Description Change in curing process New photographs add for panel casting, IiftinQand erection process Addition of corner panel casting photos. New photographs of panel erection. © C O PY R 02 H T IMs Minimol Korulla 00 01 ,~ M AC Approved By: Revision No. ~ C I Mr Ratn~kar Mahajan Sign MIIMP/38 R02, Date: 06.06.2016 1 Components of ParaWebTM Reinforced Soil Wall System Contents Topics Page No. 1. Components of ParaWebTM Reinforced Soil Wall System 06 -12 2. Nomenclature for Panels 13 - 16 3. Methodology for Panel Casting 4. Methodology for Erection of ParaWebTM Reinforced Soil Wall 29 - 45 5. QA plan & Construction Tolerances 46 - 50 Annexure – I : Monitoring Formats 51 - 60 17 - 28 © C O PY R IG H T M AC C AF ER R I Sr. No. Note: This document is intended for use as a general guideline for construction of ParaWebTM RS wall. Some of the aspects mentioned in the document may vary depending on site specific conditions. MI/MP/38 R02, Date: 06.06.2016 2 AF ER R I Components of ParaWebTM Reinforced Soil Wall System M AC C THE PAGE IS H T INTENTIONALLY LEFT © C O PY R IG BLANK MI/MP/38 R02, Date: 06.06.2016 3 AF ER R I Components of ParaWebTM Reinforced Soil Wall System M AC C THE PAGE IS H T INTENTIONALLY LEFT © C O PY R IG BLANK MI/MP/38 R02, Date: 06.06.2016 4 AF ER R I Components of ParaWebTM Reinforced Soil Wall System M AC C THE PAGE IS H T INTENTIONALLY LEFT © C O PY R IG BLANK MI/MP/38 R02, Date: 06.06.2016 5 Components of ParaWebTM Reinforced Soil Wall System Components of ParaWebTM Reinforced Soil Wall System Introduction: AF ER R I ParaWebTM reinforced soil wall comprises of thin pre-cast reinforced concrete fascia panels, polymeric strips ParaWebTM connected to the pre-cast units by passing around cavity shaped Connectors and passing around anchor bars at the rear, the earth fill and accessories, as schematically shown in Figure 1. The Connectors are cast into the panels. ParaWebTM is generally laid in zigzag pattern passing around the rear anchor bars. Rear anchor bar is used just to keep the ParaWebTM in position during the filling and compaction operation and has no design significance. The ParaWebTM strips are generally spaced at 1.0 m c/c in horizontal plane and 0.8m c/c in vertical plane. RS wall Panel “J” Hook and rear anchor bar C EPDM Pad TM M AC ParaWeb Back Fill PY R IG H T Connector Figure 1 Components of ParaWebTM Reinforced Soil Wall System. O Main Components of ParaWebTM Reinforced Soil Wall System: © C The ParaWebTM Reinforced Soil Wall System comprises of the following main components: 1) ParaWebTM: ParaWebTM strips comprise of tendons made from high tenacity polyester yarns concentrated in ten separated bundles and encased in a durable polyethylene sheath (Ref. Photo No.1 a). The polyester yarns are placed in tension and polyethylene is then coextruded on to the polyester to form polymeric strip. While polyester is load bearing element, polyethylene sheath protects the polyester yarns and provides the size and shape to the strips. MI/MP/38 R02, Date: 06.06.2016 6 Components of ParaWebTM Reinforced Soil Wall System 1b Strength embossed on ParaWebTM. © C O PY R IG H T Photo No.1a ParaWebTM & M AC C AF ER R I ParaWebTM is supplied in various strengths between 30 to 100kN. The width of ParaWebTM strip varies between 85 to 90mm depending on the strength of strip. ParaWebTM is supplied in rolls of generally 100m length. Each roll of ParaWebTM of particular grade has a packaging strip of specific colour around the roll as shown in Photo No.2. A label pasted on each roll gives details such as type and grade of ParaWeb TM, run number, width of strip. The strength of ParaWebTM is embossed on the strip at about 400 mm c/c all along the strip as shown in Photo No.1 b. This helps to identify the strength of ParaWebTM during installation once the roll is opened up. Photo No.2 ParaWebTM Rolls. 2) Pre-cast Concrete Facia Panels: Thin cladding units of reinforced concrete are used as facing elements. The pre-cast facing panels are typically 160- 180 mm thick. The panels can be categorised in four basic types: the Bottom panels (P), Standard Panels (S), Top Panels, and Corner Panel (Q). The bottom panel is introduced in the bottom most row to break the horizontal joints between the panels. The top panels have varying heights to match the top profile of the wall. The height of different top panels generally varies by 200mm. The panels are further classified as „Light‟ or „Heavy‟ type depending on the strength of ParaWebTM being MI/MP/38 R02, Date: 06.06.2016 7 Components of ParaWebTM Reinforced Soil Wall System attached to it. The panel to which ParaWebTM of strength above 75kN is attached is classified as „Heavy‟ panel. Panels are cast in moulds. Each basic type of panel has a particular mould for casting. Thus, for casting fascia panels for ParaWebTM RS wall system 4 types of moulds are required. Following permanent accessories are cast with the panels so as to form an integral part of the system: Photo No. 3 Connector. © C O PY R IG H T M AC C AF ER R I 2.a. Connectors: The Connector is made up of High Density Polyethylene (HDPE) and comprises of a cavity which is provided with a sleeve near the bottom through which the ParaWebTM is passed. A lid is provided over a connector to restrict the flow of concrete slurry inside. The Connectors are cast into the panel and are used to connect the ParaWeb TM to the panels through sleeves. For ParaWebTM up to 75kN strength, 100 mm deep Light-Connectors are used while for ParaWebTM with more than 75kN strength, 145 mm deep Connectors also known as HeavyConnectors are used. These Connectors are also used for lifting the panels from the base plate after casting and stacking them at required location. Heavy Light Photo No. 4 Heavy and Light Connectors. MI/MP/38 R02, Date: 06.06.2016 8 Components of ParaWebTM Reinforced Soil Wall System M AC C Photo No.5 I-Bolt. AF ER R I 2.b. I- Bolts: I bolts as shown in Photo No.5 are cast into the panel and are used for lifting the panel from the stack for erecting them at required location in the wall. Refer Photo No.6. Photo No.6 I-Bolt before (mould) and after casting (panel). © C O PY R IG H T 3) EPDM pads: These pads are used as seating in the horizontal joints between the panels. They prevent direct contact between the panels and maintain gaps in the horizontal joints thereby contributing to the flexibility to the system. Generally three EPDM pads are placed in the recess provided on top of panel before next panel is placed on it (Refer Photo No.7). Photo No.7 EPDM pads. 4) Joint Fillers (Vertical & Horizontal): Non-woven geotextile are pasted / fixed on horizontal and vertical joints to prevent the loss of backfill soil/ aggregates through the joint. 5) Erection accessories: Some temporary accessories are used during erection which include: MI/MP/38 R02, Date: 06.06.2016 9 Components of ParaWebTM Reinforced Soil Wall System AF ER R I 6.a. Rear anchor arrangement: This arrangement is for providing temporary anchorage to the ParaWebTM at the rear end of the reinforced soil zone till backfill is placed on it. The two constituents are as follows: Photo No.8 Rear Anchor arrangement. Hooks: Hooks are in the form of 12mm diameter bars 300 mm long. A pair of hooks is driven into the compacted backfill at spacing of 200mm for fixing the anchor bar (Refer Photo No.8). M AC C Anchor bar: A steel bar of 12 mm diameter and 200mm length is anchored in position with the hooks as shown in Photo No.8 around which the ParaWebTM is looped. O PY R IG H T 6.b. S-Clamps: Clamps of 6 to 8 mm diameter steel bars made into „S‟ shape are used at places where overlapping of ParaWebTM occurs between two rolls (One roll which is already laid and the new roll which is to be laid in continuation as per requirement in drawing). The clamps provide temporary clamping till the backfill is laid (Refer Photo No.9). Photo No.9 S- Clamp. © C 6.c. Wooden Clamps & Wedges: are used to hold the panels in place during the construction of Reinforced Soil Wall. Wooden clamps as shown in Photo No.10comprise of two wooden blocks of 0.3 m x 0.1 m x 0.050 and a MS steel rod of 12 mm diameter and 425 mm length passing through the wooden blocks. The MS rod is threaded at both the ends for length of 75 mm and has two nut washers to tighten the wooden clamp against the panels. Photo No.10 Wooden Clamp. MI/MP/38 R02, Date: 06.06.2016 10 Components of ParaWebTM Reinforced Soil Wall System A pair of wooden wedges is wedged in the joints between two panels to prevent movement of panels during construction of reinforced soil wall. Photo No.11 Wedges. M AC C AF ER R I 6.d. Lifting Eye: The panel is lifted from the “I” bolt for erecting it at the appropriate location in the wall. Lifting eye (Refer Photo No.12) is a tool used to lift the panel from the “I” bolt that are cast into the panel. Photo No.12 Lifting Eye for lifting the panels from the “I” bolt. © C O PY R IG H T 7. Levelling Pad: Levelling pad is cast–in-situ PCC (M20 grade) of 450 mm width and having minimum thickness of 200mm. The levelling pad provides levelled surface for the panels and should be cast within a tolerance of 5mm with respect to levels indicated in the drawing. The levelling pad has a key at the front end as shown in Photo No.13, to guide the panels to proper alignment and prevent their movement at the bottom as the fill is placed behind the panels. Shear Key Photo No.13 Levelling Pad with shear key. 8. Backfill: Select material satisfying the technical specifications and design requirement regarding the shear strength parameter angle of internal friction, maximum particle size, percentage fines shall only be used as backfill. The back fill material is placed in layers of specified thickness and compacted to specified density. 9. Drainage Arrangement: It is necessary to provide suitable drainage arrangement to quickly drain off excess water from the fill material and MI/MP/38 R02, Date: 06.06.2016 11 Components of ParaWebTM Reinforced Soil Wall System C AF ER R I thus, prevent development of pore water pressure. For drainage, filter media of gravel of 10 mm to 20 mm size is generally provided behind the fascia. M AC Figure 2 Drainage arrangement. Figure 3 Coping beam. © C O PY R IG H T 10. Coping Beam: In case of highway projects, crash barrier friction slab is provided on the RS wall to avoid any vehicle accidentally jumping off the reinforced soil wall retained embankments. To negotiate the slope of the approach, panels are stepped by 200mm. A Coping beam is provided on top of the top row of panels to fill in the gap created by providing the steps. A gap of about 25 to 40 mm or as shown in drawing is created between the crash barrier friction slab arrangement and all around the coping beam by introducing thermocol during casting of friction slab to avoid load transfer from crash barrier friction slab on to the panels. Photo No.14 Coping beam. MI/MP/38 R02, Date: 06.06.2016 12 Nomenclature For Panels Nomenclature for Panels C AF ER R I Panels used for ParaWebTM reinforced soil wall system can be categorized into 4 different types as under: Standard Panel is designated as ‘S’ and are cast in standard panel mould. Base/ Bottom panel is designated as ‘P’ and are cast in bottom panel mould Top panels have different height and are designated as A,B,C,D,E,F,G,J,W,X,Y & Z. Panels A, C, E, and G are cast in standard panel moulds using horizontal shutter plate at appropriate location from the top shutter (shutter with cups for I bolt) so that required height as mentioned in the drawing is obtained. Panels B, D, F & J are cast in cruciform panel mould by using horizontal shutter plate at appropriate location from the top shutter.Panels W, X, Y and Z are cast in cruciform panel moulds with the horizontal side shutter plate placed at appropriate location from the bottom and top shutter with I bolts cast in the top shutter plate. Corner panel is designated as ‘Q’ and is cast in special mould for corner panel. M AC Cut panels are special panels with a cut on left or right side and are cast in standard or cruciform or bottom panel mould as per the type of cut panel to be cast. IG H T Designation for Connection type and numbers: As mentioned earlier ParaWebTM of strength ranging from 30 to 100 kN is used for ParaWebTM Reinforced Soil wall. A panel to which ParaWebTM of strength more than 75 kN is connected is designated as Heavy panel and has ‘H’ after panel type nomenclature. There is no specific nomenclature for Light panels. If ‘H’ is not there after panel type nomenclature, it is a light panel (Refer Figure 1). Heavy panels are cast with H-Connectors and Light panels with L-Connectors. PY R Number of connections in each panel depends on design requirement. A number, after panel type nomenclature or ‘H’ indicates number of connections to be cast in the panels. The location of connection in the panel is provided in the project drawings. NO. OF CONNECTIONS NO. OF CONNECTIONS © C O TYPE OF PANEL TYPE OF PANEL HEAVY PANEL Standard Light Panel Standard Heavy Panel S – Standard Panel H – Used to show a heavy panel Figure 1 Nomenclature for Standard Panel. MI/MP/38 R02, Date: 06.06.2016 13 Nomenclature For Panels TYPE OF PANEL NO. OF CONNECTIONS AF ER R I Figure 2 Nomenclature for Bottom / Base Panel. Designation for cut panels: Cut panels are special panels with either their right or left side cut as viewed from the front side of the panel. Left cut is designated with nomenclature ‘L’ and right cut is indicated as ‘R’. The bottom width of the panel in cm is indicated in the panel nomenclature as shown in Figure 3 a & b and 4. This dimension is for the front face of the panel. NO. OF CONNECTIONS TYPE OF PANEL BOTTOM WIDTH IN CM C LEFT CUT M AC SL4-140 L – Used to show panels having cut on left side. (a) Left cut Panel as viewed in elevation (fascia side) H T LEFT CUT NO. OF CONNECTIONS IG TYPE OF PANEL BOTTOM WIDTH IN CM SLH4-140 PY R HEAVY PANEL RIGHT CUT NO. OF CONNECTIONS TYPE OF PANEL © C O (b) Left Cut Heavy Panel as viewed in elevation (fascia side) Figure 3 Nomenclature for Left cut panel. BOTTOM WIDTH IN CM SR4-140 Right Cut Panel as viewed in elevation (fascia side) Figure 4 Nomenclature for Right cut panel. MI/MP/38 R02, Date: 06.06.2016 14 Nomenclature For Panels H T M AC C AF ER R I Corner panel is provided at the intersection of two walls meeting at different angles (Refer Photo No.1). Corner panel is designated as ‘Q’. Corner panels of height ranging from 80 cm to 160 cm are generally used. The height of the panel in cm is designated at the end of the nomenclature as shown in Figure 6. For corner panels there shall be only one connection for panel of 80 cm height. For panels with height more than 80 cm, corner panel shall have two connections. Number of connection nomenclature is not provided to the corner panels. However, corner panels are designated as heavy panel with nomenclature ‘H’ as per the strength of the ParaWebTM that shall be connected to the Panel. © C O PY R IG Photo No.1 Corner Panel. HEIGHT OF PANEL IN CM CORNER PANEL Figure 5 Nomenclature for corner panel. EXAMPLES & DESCRIPTIONS OF SOME PANELS AS PER NAMING J6 SH 4 SHR 4-90 Q 120 PH 2 J panel with 6 connections Heavy panel ‘S’ with 4 connections Heavy ‘S’ cut-panel (cut on right-side) with 4 connections and 90 cm width at bottom Corner panel of height 120 cm Heavy half panel ‘P’ with 2 connections MI/MP/38 R02, Date: 06.06.2016 15 Nomenclature For Panels A,B,C,D,E,F,G,J,W,X,Y & Z –Various top panels. Refer panel drawing for the details. 2,3,4,5,6 etc - Used along with the symbol of various panels to show the number of connections present in each panel, except for the corner panel. AF ER R I 50, 55, 60….170 - Used along with the symbol of various cut panels to show the cut panel width (in cm) or height of corner panel (in cm). CONNECTION DETAILS FOR LIGHT AND HEAVY PANELS For heavy panels: Depth of cavity = 145 mm. Heavy panels have letter ‘H’ in their nomenclature. For light panels: Depth of cavity = 100 mm. Panels without the letter ‘H’ in their nomenclature are light panels. M AC C T SHAPE PANELS –NAMES TYPE IG H T Standard Base/bottom NAME OF PANEL S P A B C D E F G J W X Y Z Q 80 Q 100 Q 120 Q 140 Q 160 Corner © C O PY R Top MI/MP/38 R02, Date: 06.06.2016 BOTTOM WIDTH m 1.83 2.16 1.83 1.83 1.83 1.83 1.83 1.83 1.83 1.83 2.16 2.16 2.16 2.16 HEIGHT m 1.6 0.8 1 1.8 1.2 2 1.4 2.2 1.6 2.4 1 1.2 1.4 1.6 0.8 1 1.2 1.4 1.6 16 Methodology For Panel Casting Methodology for Panel Casting 2) Methodology for panel casting AF ER R I 1) Introduction The panels for the fascia elements of ParaWebTM reinforced soil wall are pre-cast at the casting yard. Guidelines for casting panels, curing, stacking, and transportation are given here in. M AC C 2.01) Verification of moulds: Moulds shall be manufactured as per drawing and the dimensions shall be checked before dispatch from manufacturing unit and after receiving at site. The checklist for mould inspection shall be maintained appropriately for the moulds supplied to the project. The dimensions measured should be recorded in mould dimension checklists for future reference and verification purposes. Base plate should be free from any warping and dimensions of all the side shuttering should be within tolerance as indicated in drawing. 2.02) Preparation of Casting Yard: For efficient casting and good quality of work the following arrangements / facilities are required at the casting yard. © C O PY R IG H T a) Casting Area: The panels shall be cast at the casting area using moulds. The base of the mould shall be supported on two supporting concrete beams (as shown in Photo No.1) of 250 mm (W) X 300 mm (D) or any other suitable method. Top of the beams shall be in one horizontal plane. This is to ensure that the base of the mould is in horizontal plane while resting on the beam during casting. Number and length of such support system at the casting area shall depend on the number of base plates. Photo No.1 Casting Platform. MI/MP/38 R02, Date: 05.06.2016 17 Methodology For Panel Casting b) Stacking Area: The area of stacking yard shall depend on the daily production of panels. The stacking area shall be well compacted and leveled to prevent any uneven settlement of panel stack which might damage the panels. The stacking area may be suitably divided with separate stacks for different type of panels. AF ER R I c) Storage Sheds: Proper storage sheds shall be erected to store all the accessories supplied to projects which includes Connectors, I Bolts, EPDM pads, ParaWebTM rolls, geotextile etc. Weighing balance H T Sand Replacement test equipment M AC C d) Lab Facilities: Suitable laboratory facility for testing of concrete and backfill material should be available at project site. Rapid moisture measuring apparatus © C O PY R IG Photo No. 2 Field Soil Testing Equipments. Photo No. 3 Concrete Slump Testing setup. e) Associated Facilities: This includes curing arrangement, needle vibrators, demolding agent, generator, spacer blocks, tools for assembling and dismantling of moulds. MI/MP/38 R02, Date: 05.06.2016 18 Photo No. 5 De-molding Agent. M AC C Photo No. 4 Needle Vibrator. AF ER R I Methodology For Panel Casting Photo No.6 Concrete spacer block. Photo No.7 Assembly tools. © C O PY R IG H T 2.03) Fixing of mould base on platform: The mould base shall be fixed horizontally within a tolerance of + 4.00mm over the concrete beams or any other suitable platform. The side-shutters shall be mounted on the base plate and fixed in position by suitable bolting/fixing arrangement. All the nuts-bolts, wedges, clamping arrangement should be fixed in position. The mould should be oiled before placing the reinforcement bars. Special care should be taken to prevent reinforcing bars and fixtures coming in contact with the oiled surface of the mould. If fixtures or reinforcement bars accidentally get oiled the same should not be used until their surface is free from oil. Photo No.8 Mould placed on concrete beam. MI/MP/38 R02, Date: 05.06.2016 19 Photo No.10 Mould base with side-shutters H T M AC C Photo No.9 Mould base. AF ER R I Methodology For Panel Casting IG Photo No.11 Applying shuttering oil to base plate of mould © C O PY R 2.04) Preparation and placement of steel reinforcement cage: The steel bars required for assembling the reinforcement cage as per drawing shall be cut to the specified length. After cutting the steel bars, they should be checked for its straightness and if necessary the bend should be removed by suitable means before proceeding further. The reinforcement cage shall be fabricated by placing the vertical and horizontal bars as per the spacing mentioned in drawing. The steel bars should be bound properly using binding wires and care shall be taken to ensure that the individual bars do not move during handling and placement. The reinforcement orientation (i.e. horizontal/vertical steel bar with reference to earth face) should be referred from the drawing and accordingly, the reinforcement cage shall be placed inside the mould. Figure No.1 Reinforcement Orientation. MI/MP/38 R02, Date: 05.06.2016 20 Methodology For Panel Casting M AC C AF ER R I Reinforcement shall be lifted off the base and tied with the panel accessories to fit in its proper position. Adequate supporting arrangement shall be provided so that reinforcement and accessories remains in position during placing and compaction of concrete. Photo No.12 Placement of Reinforcement cage and Connector. © C O PY R IG H T 2.05) Placing of panel accessories: Panel accessories like Connectors, and verticallifting I bolt as per approved drawing, shall be fixed in proper position by suitable positioning arrangement. Connectors shall be fixed in position by using a holding frame. A lid shall be fixed over the connector and shuttering tape shall be placed covering the gap between the lid and the connector. The reinforcement bar mesh shall be suspended from the Connectors attached to holding frame. A clear cover as indicated in drawing shall be provided to reinforcement mesh from earth side/back side of panel. Photo No.13 holding frame. “Light” MI/MP/38 R02, Date: 05.06.2016 Connector Photo No.14 “Heavy” holding frame. Connector 21 AF ER R I Methodology For Panel Casting Light Panel Heavy Panel Photo No.15 Mould ready for casting. © C O PY R IG H T M AC C 2.06) Pouring of concrete and its compaction: After completing all the above activities and filling the pour card and relevant quality checklist forms for panel casting, concrete of specified grade and slump as per approved mix design should be poured in the mould with minimum interruption. A vibrator of 40mm diameter shall be used to compact the concrete. Hand tamping shall be done to the sides by wooden or rubber mallets. Special care shall be taken to see that the pouring operation of the concrete does not dislodge the panel accessories. The concrete shall be leveled to top of the side shutter or up to the level marked on the side shutter and broom finish shall be provided to the top surface of concrete. Care shall be taken to ensure that slurry is not accumulated at the surface. Photo No.16 Top surface of panel with broom finish. MI/MP/38 R02, Date: 05.06.2016 22 C Figure 3 Details of Heavy Panel connection. PY R IG H T M AC Figure 2 Details of Light Panel Connection. AF ER R I Methodology For Panel Casting Photo No.17 Casting of panel. Photo No.18 RCC Panel. © C O 2.07) Casting of cut-panel: For casting cut panels vertical divider shutters are used to reduce the horizontal dimension. To determine if a panel is left or right cut, the rule is to always consider the external side of the panel. Thus, if the drawing indicates right-cut panel, the panel has to be cast on left side of person facing the mould while standing on the I-bolt side of the mould. Vice-versa, if drawing indicates left-cut panel, the panel shall be cast on right side of person facing the mould while standing on the I-bolt side of the mould, and thus cutting the left side of the panel. The divider shutters should be adequately supported for achieving a vertical face of the cut-panel. The supports can be in the form of timber rafters or uniformly shaped concrete blocks. The minimum width of cut panel should not be less than 500mm. MI/MP/38 R02, Date: 05.06.2016 23 Methodology For Panel Casting Wooden/ Concrete cube support Photo No.19 RCC Cut- Panel. C Figure 4 Casting of Cut Panel. AF ER R I Connector PY R IG H T M AC 2.08) Marking for Identification of different types of panel: Panel type, date of casting shall be inscribed on the earth face of the panel after initial setting time of concrete. Alternately, the same details can be written with paint on the location of EPDM pads in the panel after removal of side-shutters as shown in Photo No.19. O Photo No. 20 Panel type and date of casting painted on EPDM location. © C 2.09) Removal of side shutters: Side shutters shall be removed after hardening of concrete sufficient enough to retain the shape after de-shuttering. This may be after 4 to 6 hours of casting. Holding arrangement of panel accessories are to be removed first and side shutters shall be removed slowly with care, without damaging panel edges. Panel type and date shall be painted on the EPDM location of the panel. 2.10) Lifting and stacking of R.C.C. panel for curing: The panel shall be lifted from base after 16 to 20 hours of concreting using vertical lifting arrangement by Hydra crane as applicable and shall be stacked for curing. The vertical height from the earth side of the panel to the connector of the crane where lifting belt are attached shall not be less than 1.5 m. MI/MP/38 R02, Date: 05.06.2016 24 C 1.5m AF ER R I Methodology For Panel Casting M AC Photo No. 21 Arrangements for Lifting Panel off the base of mould after casting. © C O PY R IG H T 2.11) Curing of panels: Curing of panels shall start soon after the panel begins to dry on the base plate of the mould. After initial curing on the base plate of the mould, the panels shall be shifted to the curing area where they shall be stacked one over the other using four concrete blocks between two panels. Photo No. 22 Curing arrangement using Hessian cloth covering the exposed panel on the base plate. The panels shall be cured for 14 days in the curing area. Not more than 4 panels shall be stacked one over the other during curing. Care should be taken to ensure that the newly cast panels are placed not more than 2 in a stack in a day. The panels shall then be shifted to the stacking area. Wherever possible it is advisable to carry out the curing by submerging the panels in curing tank. MI/MP/38 R02, Date: 05.06.2016 25 AF ER R I Methodology For Panel Casting C Photo No. 23 Curing of panels. © C O PY R IG H T M AC 2.12) Stacking of panels: Stacking area should be suitably divided to stack each type of panel at designated location. Adequate care should be taken to ensure that the I-bolts for all the panels in the stack are on the same side. Concrete cube/Spacer block Photo No. 24 Location of concrete cube/spacer block. Concrete cube/spacer block shall be placed in one line exactly one above the other. Care shall be taken that the spacer are placed adequately be away from the Connector. MI/MP/38 R02, Date: 05.06.2016 26 Methodology For Panel Casting Concrete cube/Spacer block Concrete cube/Spacer block Location of concrete cube/Spacer block (below 1st panel) for panel stacking on poor ground. M AC Location of concrete cube/Spacer block for panel stacking on hard leveled ground. AF ER R I Connector C Connector Figure 5 Concrete cubes/Spacer blocks locations between bottom layer of panel and ground. © C O PY R IG H T Maximum 6 Panels shall be stacked over other using four concrete blocks in between two panels. Special care shall be taken to see that the Connectors are not damaged and the panels are stacked in a stable position. Under no circumstances shall the spacer blocks be placed over the Connector. In no case should the exposed face of panel shall be placed on the ground or above another panel without suitable spacers. While lifting the panel from the Connectors for stacking/ loading/ unloading/ shifting, it shall be lifted from all 4 connections. Photo No. 24 Stacking of panels. MI/MP/38 R02, Date: 05.06.2016 27 Methodology For Panel Casting Transportation of Panels: After proper curing fascia panel shall be shifted from casting yard to erection site. The panels shall be transported by a Trailer-truck in stack of not more than 4 panels, with wooden or concrete blocks placed between the panels. The bottommost panel should always be supported on wooden rafters during transportation. A gap of about 15 to 20 cm shall be maintained in between the stacks. The stack of panels shall be properly secured with chains or slings to the trailer. To avoid damage to the panels, trailer shall not travel at speed more then 30km/hr, unless the road is in good condition and higher speed is not damaging the panels. Panel shall be unloaded and stacked at erection site in same manner as at casting yard. R IG H T M AC C AF ER R I 3) © C O PY Photo No.25 Transportation of panels. MI/MP/38 R02, Date: 05.06.2016 28 Methodology for Erection of ParaWebTM Reinforced Soil Wall Methodology for Erection of ParaWebTM Reinforced Soil Wall Excavate the formation to the required level as shown in the construction drawings. The surface of formation should be free from any deleterious material and unwanted foreign objects. Loose pockets if any, shall be excavated and filled with suitable granular material. 2. Roll the formation using Vibro-roller of 8 to 10 tonnes capacity. Care should be taken to ensure that the design requirements with respect to bearing capacity are achieved. Density of formation to be checked as per QA plan. Density should not be less than 95% Modified Proctor Density for the formation. C AF ER R I 1. M AC Photo No. 1 Vibro Roller. The in-situ PCC levelling pad (Refer Photo no.2) for the pre-cast panels shall be cast in line and to the level shown on the construction drawings to a tolerance of +/- 5mm. At the end of day‟s work, if entire length of levelling pad is not completed, the end portion shall be sloped downwards to ensure a proper construction joint for the next day‟s PCC work (Refer Figure 1a). An attempt should be made to avoid any construction joint in the levelling pad for closing wall. Preferably the construction joint in levelling pad should be at least 5m away from the corner panel location in the longitudinal portion of the wall as shown in Figure 1b. IG H T 3. 45 1 (a) PY R SLOPE TO PCC AT END OF DAYS WORK O 5.0 m © C CLOSING/ CROSS WALL TAIL END PLAN OF PCC LEVELLING PAD 1 (b) SHADED AREA OF LEVELLING PAD TO BE CAST IN SINGLE ROUND OF CONCRETING Figure 1 Construction joint in PCC levelling pad MI/MP/38 R02, Date: 06.06.2016 29 Methodology for Erection of ParaWebTM Reinforced Soil Wall Particular care should be taken to maintain correct line and level at footing steps. 5. Setting-out points or lines should be established on top of the in-situ concrete base, and this line should be referenced to enable the setting-out line to be reestablished as the construction proceeds (refer Photo No.2). M AC C AF ER R I 4. Photo No. 2 Leveling pad. Before panels are placed they should be carefully checked to ensure that no damage has occurred during transport and handling, either to the panels themselves or to the panel connector. An individual panel shall be lifted from the stack using lifting kit. The lifting eye shall be connected to the I-bolt at the top of panel and panel shall be lifted to vertical position. A piece of timber should be placed between the panels to avoid possible chipping at edges during lifting from horizontal to vertical position (Refer Photo No.3) © C O PY R IG H T 6. Photo No. 3 Correct technique for lifting of panels. MI/MP/38 R02, Date: 06.06.2016 30 Methodology for Erection of ParaWebTM Reinforced Soil Wall While lifting the panel using Hydra-crane for erection from the I-bolt, always use two sets of slings. One set for I-bolt and the other for top row of connector on the panel. (as shown in Photo No.4.) M AC C AF ER R I 7. Photo No. 4 Lifting of panel with double set of slings. Generally the erection should start from existing structure and move towards end of structure (say from closing/cross wall to tail end). Place the corner panel (if required) as per the layout plan given in drawings. After leaving adequate space for cut panels, start placing the required number of bottom panels on the concrete base leaving space for full panels. If cut panel is cast out of bottom panel then erect cut panel besides the corner panel and then start placing the bottom panels. © C O PY R IG H T 8. Photo No. 5 Alignment of cut panel with corner Panel. MI/MP/38 R02, Date: 06.06.2016 31 Methodology for Erection of ParaWebTM Reinforced Soil Wall Ensure the stability of the panels by appropriate propping from the front. (as shown in Photo No. 6). To prevent the panels from falling backwards some filter media can be placed behind the panels up to the lowest row of ParaWeb TM attachment points, or the panels can be temporarily propped from inner face till the filling is done to support the panels. C AF ER R I 9. M AC Photo No.6 Panel supported by Timber props to prevent over-turning. Panels may need to be installed with a slight lean (forward or backward) depending on backfill soil behaviour and existing ground conditions. It is usual for panels to rotate forwards slightly during compaction of the fill behind the wall. Therefore, a slight backward lean (e.g. 10 to 15 mm over the height of the panels) will counteract any forward rotation during construction. Photo No.6 shows the lean provided to the panel being checked using a Plumb bob and measuring tape. 11. Conversely, for sites where settlements of foundation soils are expected, the panels may be installed with a slight lean in the forward direction. Any settlement during construction will pull the panels towards the vertical position. The appropriate amount of lean to be applied to the panels will be advised by the Engineer. © C O PY R IG H T 10. Photo No. 7 Checking the lean of panel. MI/MP/38 R02, Date: 06.06.2016 32 Methodology for Erection of ParaWebTM Reinforced Soil Wall Check the following during erection: a) Distance between adjacent panels on front side (as shown in Figure 2a), can be checked by using a suitable spacer made of reinforcement steel. The spacer bar can be fabricated and calibrated to the correct measurement at the site. SPACER 1.870 1.870 AF ER R I 12. Spacer bar IG H T M AC C Figure 2a Checking the space between panels with spacer bar PY R Photo No. 8 Spacer bar to check panel to panel dimensions (including 20mm gap) from outer face. SPIRIT LEVEL STRAIGHT EDGE © C O b) Level of top of panels using spirit level as shown in Figure 2b or waterlevel; 1.870 Figure 2b Checking the level of panel 2 with reference to panel 1. MI/MP/38 R02, Date: 06.06.2016 33 Methodology for Erection of ParaWebTM Reinforced Soil Wall c) Horizontal alignment allowing for any lean of the panels which has been applied. It is important to place these initial panels as accurately as possible, including the advised amount of lean, as any errors, particularly in the vertical alignment, may be amplified at subsequent levels. If any packing is required under the panel in order to obtain the correct level /alignment then, a “dry pack mortar” should be used. Wooden wedges should only be used for temporary transfer of load until the permanent packing material has cured. 14. After placing and securing all the bottom panels, re-check the panel to panel distance, the level at the top of the panels and the horizontal alignment of the panels. A running dimension over at least five panels and five gaps (where possible) should be checked on outer face and shall have a tolerance of not more than +/- 10 mm. 15. Start placing the standard panels in the space between the half panels as shown in Figure 3. Adequate care shall be taken to match the panels with reference to each other (in vertical direction) during the erection of panels. Prop the panels from outside once erected and clamp them using timber clamp. SPIRIT LEVEL M AC C AF ER R I 13. H T STRAIGHT EDGE FOR ALIGNING THE PANELS USE STRING SPANNING OVER 4 TO 8 PANELS IG 1.870 PY R 1.870 Check the following during erection a) Distance between adjacent panels on front side (as shown in Figure 3) b) Level of top of panels; c) Horizontal alignment allowing for any lean of the panels which has been applied. © C 16. O Figure 3 Sequence of erection of first row panels. N.B. Some tolerance of +/- 2mm may be used up as the wall is erected so that the distance between adjacent panels will need to be optimized at each level in order to achieve the best fit and yet allow subsequent rows of panels to be erected at a later stage. MI/MP/38 R02, Date: 06.06.2016 34 AF ER R I Methodology for Erection of ParaWebTM Reinforced Soil Wall H T M AC C Photo No. 9 Placing of standard panel between bottom panels. Photo No. 10 Fixing of clamps between two panels. Where a bottom row is left incomplete ensure that the free end panel is always a half panel. Particular care will be needed at the „free‟ end to maintain alignment. 18. To ensure that the panels do not move and are firmly held in place during further operations, hardwood wedges (as shown in Photo No. 11) with the right combination are placed into the panel joints. One set should be placed in the vertical joints near the bottom of the panel being secured and another one near the shoulder. Care should be taken that these wedges are at least 150 mm away from the corners of the panel. © C O PY R IG 17. Photo No. 11 Wooden Wedges. As far as possible, horizontal joints should be kept wedge free. However, if required wedges on a temporary basis may be used in the horizontal joints and MI/MP/38 R02, Date: 06.06.2016 35 Methodology for Erection of ParaWebTM Reinforced Soil Wall AF ER R I must immediately be removed once wedges in the vertical joints and the support clamps are tightly fixed. Photo No. 12 Fixing of wooden wedges If any adjustments are required, these can be easily achieved by easing the panel with a pinch or crow bar (Refer Figure 4). Care should be taken not to damage any concrete during this operation. It may be necessary to place a piece of wood between the bar and the concrete in order to avoid damage. PANEL TOE INTERNAL MOVEMENT EXTERNAL MOVEMENT R IG H T POINT OF ROTATION HORIZ. JOINT AXIS-PIPE AXIS M AC C 19. BACKFILL After placing all standard panels at one level again check the following: a. Distance between panel to panel as shown in Photo No. 13 measuring tape; © C O 20. PY Figure 4 Adjustment of panels using crow-bar Photo No. 13 Checking the space between panels with measuring tape. MI/MP/38 R02, Date: 06.06.2016 36 Methodology for Erection of ParaWebTM Reinforced Soil Wall AF ER R I b. Level of top of panels; Photo No.14 Checking the top panel levels with tube level filled with water. IG H T M AC C c. Horizontal alignment allowing for any lean of the panels, which has been applied. Photo No. 15 Checking the top panel levels with water level. © C O PY R d. Distance between top of bottom panel to top of adjacent standard panel (as shown in Photo No 16). Photo No. 16 Checking distance between top of bottom panel and top of adjacent panel. MI/MP/38 R02, Date: 06.06.2016 37 Methodology for Erection of ParaWebTM Reinforced Soil Wall C AF ER R I The lean back of the standard panel should conform to the lean of the half panels. When all the panels placed have been aligned both horizontally and vertically, the vertical and horizontal joints should be covered with non-woven geotextiles (as shown in Photo No. 17). M AC Photo No. 17 Placement of non-woven geotextiles in panel joints. Place and compact fill material in layers to meet the density requirements (as per QA plan) up to the first level of ParaWebTM attachment position. Only fill, which meets the design specification, should be used. Control over the grading of fill should be exercised. Stones of size more than 150 mm should be removed from the fill. 22. Ensure that the fill level after compaction is not lower than the centre of connector level. This is particularly important where post construction settlements may be expected or in the case of bridge abutments where very large surcharge loads will be applied. 23. Where local troughs or hollows exist, these should be filled in with fill material and compacted properly. 24. Measure out from the back face of the panels, the width of the reinforced soil zone as shown on the drawings at that level and fix the rear anchor bars (as shown in Photo No. 18). © C O PY R IG H T 21. Photo No. 18 Marking and fixing of rear anchor arrangement. MI/MP/38 R02, Date: 06.06.2016 38 Methodology for Erection of ParaWebTM Reinforced Soil Wall Commence laying the ParaWebTM of specified grade by looping it around the rear bar allowing a 2.0m overlap. Pull the ParaWebTM towards the panels and pass it through the first connector. ParaWebTM shall be passed thru the connector by looping around the bar inside the connector. (as shown in Photo No. 18) to anchor the ParaWebTM and continue laying back towards the rear anchor bar. Loop the ParaWeb TM around the rear anchor bar and return towards the panels and the next connector. M AC C AF ER R I 25. Photo No. 19 ParaWebTM looped through Connector. Repeat this sequence until the ParaWebTM has been loosely laid over the whole area (as shown in Photo No. 20) Photo No. 20 Laying of ParaWebTM. C O PY R IG H T 26. © 27. 28. When all the ParaWebTM has been loosely laid out adjust the spacing of the ParaWebTM at the rear end. Then return to the beginning and commence tightening the ParaWebTM. To connect two lengths of ParaWebTM a lap joint is formed in the rear end of the structure. The lap should be 2.0m long and the two pieces of ParaWeb TM temporarily secured together with a steel S-clamp (as shown in Photo No. 21) so that they do not become detached during filling operations. Before connecting two lengths of ParaWebTM it is best to remove the slack from the MI/MP/38 R02, Date: 06.06.2016 39 Methodology for Erection of ParaWebTM Reinforced Soil Wall C AF ER R I previously laid length to avoid the migration of laps towards the panels during the final tightening process. Where it is necessary to cut the ParaWebTM, thus creating an unsealed end, the end must be sealed by bitumen before any fill is placed over it. M AC Photo No. 21 S-clamps for lap-joint in ParaWebTM. Loop the final length of ParaWebTM around the rear bar with a 2.0m overlap and fasten with a steel clamp. 30. Where appropriate use crowbars to thrust back the rear anchor bar and drive the steel pins into the ground to hold the tautness so induced. 31. Final tightening of the ParaWebTM can be achieved by two or three men working systematically from one end to the other. With one man at the rear bar and one man at the back of the panels the ParaWeb TM is pulled through the connector till all the slack is removed. Keeping this section of ParaWebTM tight the man at the rear bar pulls the next length of ParaWebTM tight around the rear bar. The man at the panel position then pulls the next length of ParaWeb TM tight through the next pair of attachment loops. This procedure is repeated for all the ParaWebTM lengths until the end is reached. © C O PY R IG H T 29. MI/MP/38 R02, Date: 06.06.2016 40 Methodology for Erection of ParaWebTM Reinforced Soil Wall Photo No. 22 Checking for tightness in ParaWebTM laid in reinforced soil zone Care should be taken not to over-tighten the ParaWebTM as this could cause the panels to be pulled backwards. The objective should be to remove all slack (as shown in Photo No. 22). 33. At some locations ParaWebTM design length is not achieved due to skew in the structure. For such locations, special ParaWebTM layout drawings are issued by design team. In case of any variation noticed in the angle of skew measured at a corner location then, the same should be brought to attention of designer. M AC C AF ER R I 32. H T Photo No. 23 Installation of ParaWebTM in skew. Filling can proceed in layers in accordance with the QA plan. The layer thickness shall be marked on the panel at definite interval. The fill material is carefully deposited on the top of the ParaWebTM and then spread and compacted. 35. Where space allows, the first deposits of fill should be at the rear of the structure leaving the area immediately behind the facing panels unfilled. Tracked vehicles should not run directly on the laid ParaWebTM. © C O PY R IG 34. Photo No. 24 Marking of backfill layer thickness on panels. MI/MP/38 R02, Date: 06.06.2016 41 Methodology for Erection of ParaWebTM Reinforced Soil Wall Great care should be exercised when placing; spreading and compacting fill to ensure that heavy plant is kept away from the area immediately behind the panels. Fill should be spread in a direction parallel to the facing panels. C AF ER R I 36. M AC Photo No.25 Spreading of Fill Material In no circumstances should fill be pushed directly towards panels, particularly in the area immediately behind the panels, nor should fill be placed immediately behind the panels by dropping from the spreading machine‟s bucket. © C O PY R IG H T Heavy compaction plant must not be used within the area 2.0m from the panels instead a walk behind roller (as shown in Photo No. 27) or baby roller can be used. A limit of 1.0 tonnes should be placed on the weight of plant permitted within 2.0m of the back of the panels. Nevertheless adequate compaction should be achieved and density tests taken, ensure the following points:- Photo No. 26 Heavy roller used for compaction of backfill. a) The truck does not drop the fill close to the panel; b) The fill material does not get mixed with the filter media; c) The truck and the grader run parallel to the panels and do not come within 0.5m from the face of the panel at any stage; d) Before starting the compaction process, ensure that all the wedges and support clamps are held tightly in their place; e) Run light roller first within 2m from the panels followed by heavy roller beyond 2m from the face of the panels. Even light roller should not be MI/MP/38 R02, Date: 06.06.2016 42 Methodology for Erection of ParaWebTM Reinforced Soil Wall AF ER R I allowed to come within 0.5m distance from panel face. This area is to be compacted using vibrating plate and rammer. C Photo No. 27 Walk Behind roller used for compaction of backfill adjacent to Panels. SLOPE TO PCC AT END OF DAYS WORK IG H T M AC It may be difficult to achieve good compaction using small compaction plant such as vibrating plates and rammers. Where the use of these cannot be avoided care should be taken to ensure that the layer thickness used is small enough to ensure the required density is reached. Particular care should be taken when compacting in the proximity of units, which form corners to structures where space is restricted but where nonetheless adequate compaction should be achieved. Refer Figure 5 for compaction plant movement near the closing wall area of the structure. 45 1 (a) 5.0 m 4.5 CLOSING/ CROSS WALL TAIL END PLAN OF PCC LEVELLING PAD 1 (b) AREA TO BE COMPACTED BY COMPACTION PLANT LESS THAN 1 TONNE CAPACITY MOVEENT OF VIBRO-ROLLER(8 TO 10 TONNES) C O PY R SHADED AREA OF LEVELLING PAD TO BE CAST IN SINGLE ROUND OF CONCRETING 1.5m 1.5m © Figure 5 Compaction of backfill material at various locations within the RS wall 37. When this first volume of fill has been placed and spread, then the material immediately behind the panel can be placed and compaction can proceed. 38. Immediately upon completion of compaction of a layer of fill the alignment of panels should be checked. If the panels have rotated more or less than anticipated, it may be necessary to adjust the lean of subsequently placed panels. MI/MP/38 R02, Date: 06.06.2016 43 Methodology for Erection of ParaWebTM Reinforced Soil Wall 39. Should any gross misalignments occur then, it should be corrected immediately before any further fill is laid. Panels should be freed, dismantled to the level at which the error has arisen and then erection recommenced. AF ER R I Where panels are skewing, or difficulty is being experienced with alignment, it may be helpful to use additional wedges at the location where the slight deformations are occurring. These wedges must not be placed within 150mm of the corner of the panel nor in horizontal joints. If skewing continues the matter should be referred to the Engineer for advice as soon as possible. When the level of the fill material reaches the top of the panels, EPDM pads are placed on top of the panel and the next row of panels is placed and clamped with exiting panels using wooden clamps. 41. After the newly placed panels have been checked for line, level, lean back, horizontal distance between the panels and distance between top of existing panel to top of newly erected panel (as shown in Photo No 16), the newly erected panels are wedged to those already in place. Horizontal and vertical alignment must be related to the previously established setting out line. M AC C 40. H T More care than usual may be necessary in those areas where settlements occur. However, the system of maintaining alignment by referring back to a base datum will be more satisfactory than aligning from one panel to the one below. The appropriate lean for each row of panels and the position of the bottom and top of the panel relative to the base datum should be determined before positioning the panel. 43. The fill material can now continue to be placed until the level of the fill once again reaches the next level of attachment points for the ParaWebTM. 44. Check the alignment, level and lean of the panels. Adjust where necessary and possible. If gross misalignment occurs the panels must be dismantled to the level at which the error has arisen, and erection recommenced. R PY O As a check, the panels should be monitored regularly with a theodolite or laser to pick up any movements, which are approaching the tolerances. Thus correct action can be taken quickly and with minimum disruption. © C 45. IG 42. 46. The procedure described above should be repeated until the top of the structure is reached. 47. The props supporting the bottom row of standard and half panels should not be removed before the level of fill material is at least 2.4m from the foundation level of the wall. MI/MP/38 R02, Date: 06.06.2016 44 Methodology for Erection of ParaWebTM Reinforced Soil Wall All wedges should be removed only after fill has reached a level of 3.2m above the position of the wedges, or the top of the wall is reached, whichever is the sooner. Wedges should be carefully removed to ensure that there is no spalling of the concrete panels. 49. In the event of any problems occurring, the Engineer must be informed as soon as possible, no matter how minor the problems may be considered. Variation from the above procedures must not occur without the approval of the Engineer. All the quality check formats should be duly filled as the erection of wall progresses. H T M AC C AF ER R I 48. © C O PY R IG Photo No. 28 Completed ParaWebTM Reinforced Soil Wall. Photo No. 29 Completed ParaWebTM Reinforced Soil Wall. MI/MP/38 R02, Date: 06.06.2016 45 Quality Assurance Plan Quality Assurance Plan ParaWebTM Reinforced Soil Wall Name of Project : Contractor : Consultant 2 a i Material or Process/ Frequency Characteristics Moulds for Panel Casting (Material) Before Delivery Dimensions After receiving moulds at site Accessories for Panel Casting (Material) Connector Random Samples - 50 samples per 10,000 nos at Dimension factory. Reinforcement Steel (Material) As per project QA plan of Physical Tests Contractor IG R PY O Concrete (Material) Cement, Aggregate, Water Mixing & Conveyance C © iv v Three H T 3 iii As per drawing One Dimensions ii Two 5 tests per lot ASTM D - 2000 Random Samples - Min. 5 tests per lot at factory and 3 samples per 5000 nos. on As per drawing receipt of material at site. ii i As per drawing One EPDM Pad Physical properties 4 Level of Check As per drawing b i i Acceptance/ Reference Standard C i : M AC Sr. No. 1 AF ER R I Client : As per project QA plan of contractor As per project QA plan of contractor Grade of Concrete, Water cement ratio, cement Before placing content Crushing Strength of Cubes Slump MI/MP/38 R02, Date: 06.06.2016 One & Three IS:1786 As per project QA plan of Contractor Relevant Indian Standards Relevant Indian Standards As per project QA plan of Contractor As per project QA plan of Contractor Mix design & Batching Three plant document 6 cubes per lot of casting IS: 456 Three Before placing IS: 456 Three 46 Quality Assurance Plan Quality Assurance Plan ParaWeb TM Reinforced Soil Wall Name of Project : : Consultant Sr. No. 5 : Material or Process/ Characteristics Frequency ParaWebTM (Material) AF ER R I Client : Acceptance/ Reference Standard Level of Check C Contractor One 3 tests per lot of production in a shift of 8 hrs. EN ISO: 10319 IS: 2720 & Contract Specification Tensile Strength 6 Backfill (Material) i Gradation 2 samples per 3000cu.m or change in source Direct Shear Test 2 samples per 3000cu.m or change in source IS: 2720 & Drawings BS Three / four : 8006 iii Modified Proctor Density 2 samples per 3000cu.m or change in source IS: 2720 & Contract Specification Three iv 2 samples per Atterberg's limits (LL and PI) 3000cu.m or change in source IS: 2720 & Contract Specification Three 7 Filter Media (Material) i Gradation IS: 2720 & Contract Specification Three H T IG 2 samples per 3000cu.m Three © C O PY R ii M AC i MI/MP/38 R02, Date: 06.06.2016 47 Quality Assurance Plan Quality Assurance Plan ParaWeb TM Reinforced Soil Wall Name of Project : : Client : Consultant Material or Process/ Characteristics Panel Casting (Process) Frequency Acceptance/ Level of Check Reference Standard Mould dimension Before placing reinforcement steel in the mould C Sr. No. 8 : AF ER R I Contractor Three ii Mould cleaning & oiling Before placing reinforcement steel in the mould Visual Inspection Three iii Fabrication & fixing of reinforcement Before and after placing reinforcement in panel As per drawing or approved bar bending schedule Three iv Fixing of accessories As per drawing Three v Placing of concrete IS: 456 & Contract Specifications Three 9 a i ii Construction of RS Wall (Process) Levelling Pad Excavation level Before placing shutter Before placing Placement of shutter concrete Line of Levelling Pad After placing shutter Supervisory & Engineering staff shall Placing of concrete continuously monitor the operation. iv v vi Curing Level of PCC As per drawing M AC H T IG R PY © C iii Before placing concrete Technical staff shall monitor the operation continuously O i As per drawing As per contract specification As per drawing IS: 456 & Contract Specifications Continuous monitoring IS: 456 After placing concrete As per drawing MI/MP/38 R02, Date: 06.06.2016 Three Three Three Three Three Three 48 Quality Assurance Plan Quality Assurance Plan ParaWebTM Reinforced Soil Wall Name of Project : : Client : Consultant Sr. No. b Material or Process/ Characteristics Placing of Panel Frequency Acceptance/ Level of Check Reference Standard Before lifting from stack As per drawing ii Line, level and gap between panels After placement, before fixing first layer of As per drawing, & ParaWeb and before fixing BS:8006 second layer of ParaWeb for the panel c Backfilling i Thickness of layer ii Field Density d i ii Laying of Filter Media Width of filter media Interface geotextile iii PVC drainage pipe e i Laying of ParaWeb Grade of ParaWeb Three As per contract specification Three As per MORT&H Three Before placing of fill Before placing of fill On delivery at site before making perforations. As per drawing As per drawing Manufacturer's Data Sheet Two Two Before placement As per drawing Three PY R IG Before and after compaction 1 set of 10 tests per 500 sq.m of compacted area per layer Three H T M AC C Panel type One O i : AF ER R I Contractor Level of Check © C One - Manufacturer's test certificate. Two - Checked by Maccaferri's Engineer. Three - Checked by Maccaferri's Engineer, Contractor's Engineer & certified by PMC. Four - Testing at approved laboratory. Concrete and steel will be supplied by main contractor and the necessary quality certificates shall be maintained at the site-office. MI/QF/109 R03.06.06.2016 MI/MP/38 R02, Date: 06.06.2016 49 Quality Assurance Plan Reinforced Soil Wall. 1.Mould dimensions: ParaWeb For Side Shutter a) up to 500 mm : +/- 1mm b) For 0.5 m to 3 m : +/- 2mm c) For diagonal : +/- 5mm For Base Plate a) up to 500 mm : +/- 1mm b) For 0.5 m to 3 m : +/- 2mm AF ER R I TM Tolerances in ParaWeb 3. Connection: For connector location: 25mm M AC 4.Cast RCC panel: For casting: Diagonal and dim over 2m : +/- 5mm For dimension < 2.0m: +/- 2mm Surface finish: +/- 2mm in 1m C 2.Reinforcement steel dimensions: For placing steel reinforcement: +/-10mm and clear cover: - 10mm IG H T 5.PCC leveling pad: Top of leveling pad: +/- 5mm Alignment of vertical inner face of the key: +/- 20mm in 4.5m length R 6.Joints in erected panels: Adjacent facing panel joint gaps: +/- 6 mm Steps at joints: +/- 10 mm O PY 7.Alignment of erected panels: Panel alignment in horizontal and vertical direction: 25mm for 3m straight edge. Location of plane of structure: +/-50mm. C 8.ParaWeb installed: © Reinforcement placement elevation: 25mm of connection elevation. MI/MP/38 R02, Date: 06.06.2016 50 Annexure-I: Monitoring Formats CHECK-LIST FOR MOULD INSPECTION Project: Client: Before despatch to site Date: Yes No Does the base plate have any undulations? Do the side shutter holes match each other and nuts and bolts fit in properly? Does the side shutter match with the chamfer plate? Are the side shutters straight ? Do the side shutters have proper support at regular interval ? Is the clamping arrangement (base with side-shutter) provided? Is there any gap between side shutter and base plate? Is there any gap between side shutter at corner ? Is there any identification for base plate and side shutter? Is the over-all mould dimension within tolerance ? Are the EPDM pad locations as per drawing? Are the I BOLT locations as per drawing and fixed correctly? Is the connector-holding frame as per drawing having attachment for casting of Standard and top panels? Does the horizontal plate divider fit properly within the mould? Does the vertical plate divider fit properly within the mould? Is the overall workmanship of fabrication satisfactory? Have wooden spacers been provided between base plates during loading of mould in the Trailer/Truck? Have nuts and bolts been supplied? Have all the moulds, side shutters, plate dividers, nuts and bolts been loaded on the Trailer and recorded in the delivery challan? Has the Trailer been weighed after loading of complete mould assembly and the weight recorded in delivery challan? AF ER R I 1 2 3 4 5 6 7 8 9 10 11 12 13 M AC C 14 15 16 17 18 19 H T 20 IG Note: Before dispatch every mould should be assembled and checked. Please ensure that side-shutters are loaded manually and are provided with adequate packing to avoid any damage during transport. At site after delivery Yes No Are all the material received at site as per delivery challan and in good condition? If no, has the discrepancy been recorded and reported to HO? Has the unloading of base plate been done by crane? Has the unloading of side shutters been done manually by placing it carefully without dropping it from the Trailer? Has the base plate been stacked by placing wooden spacers between two base plates ? R 1 PY 2 3 5 O 4 © C NOTE: Tolerance of measurement for moulds. a) up to 500 mm +/- 1mm b) For 0.5 m to 3 m +/- 2mm c) For diagonal +/- 5mm For dimension of base plate (chamfer plate) tolerance shall not be more than +/-1mm. REMARKS: MI/QF/110 SITE-ENGINEER R03 3.09.12 Frequency : The checklist needs to be maintained for all moulds dispatched from manufacturing unit and received at site. MI/MP/38 R02, Date: 06.06.2016 51 Annexure-I: Monitoring Formats CHECK-LIST OF TOOLS FOR PANEL CASTING For measurement: Steel tape (5m) Steel Right angle Chalk Spirit Level For steel cutting and binding: 5 Hammer 6 Chisel 7 Hooks (for clamping binding wire) Shuttering: 8 Brush (for cleaning mould) 9 Deshuttering oil 10 Spanners (for fastening nuts-bolts) 11 Shuttering tape Concreting: 12 Vibrator machine with needle of 40 mm 13 Wooden mallet 14 Wooden trowel 15 Metal trowel 16 Aluminium Straight Edge 2.5m long 17 Broom Lifting of panels: 18 Lifting belt Stacking of panels: 19 Hydra Crane 20 Concrete blocks Arrangement for curing of panels: 21 Manual curing: pump, PVC pipe 1" dia. 22 Hessian cloth Transportation of panels: 23 Trailer-truck 24 Tractor with trailer 25 Wooden rafters © C O PY R IG H T M AC 1 2 3 4 AF ER R I List of equipment required. Date: Availability Yes No C Project: Client: Note: All the mentioned tools/plants should be either present or easily accessible at the work-site when work is going on. MI/QF/111 SITE-IN-CHARGE R02 03.09.12 Frequency : The checklist needs to be maintained at the start of panel casting activity and then, continued on monthly basis. MI/MP/38 R02, Date: 06.06.2016 52 Annexure-I: Monitoring Formats POUR CARD - For Panel Casting Date: No Deviation Steel consumption Per panel (kg) Total (kg) R IG H T M AC C AF ER R I Project: Client: Checks for moulds before casting: Yes Is the base plate in correct level? Has the mould has been cleaned and oiled properly? Are the mould dimensions as per drawing? Is the reinforcement as per schedule with correct spacing and binding wires intact? Are the accessories position and quantity as per drawing? Is the clear cover between outmost steel and earthside of mould as per drawing? Are all shutters are firmly fastened? Is the stopper for cut-panels at correct position? Has the concrete been properly compacted with Is the Earth-side of the panel finished with less than +/5mm undulation and broom finished? Details of panels to be cast: Concrete consumption (theoretical) Panel type No. of panels Per panel (cum) Total (cum) Total Total O PY Grade of concrete: ___________ Actual quantity of concrete supplied: ______ cum Slump of concrete:_______ No. of cubes taken:_________ Cube test results Compressive strength of concrete Cube No. Weight (kg) (N/sq.mm) 7-days 28-days © C Remarks MI/QF/112 R01 03.09.12 For MESPL _____________ For ______________ Frequency : The Pour-Card needs to be maintained on the day of panel casting. MI/MP/38 R02, Date: 06.06.2016 53 Annexure-I: Monitoring Formats CHECK-LIST FOR PANEL CASTING AND STORAGE Project: Client: I DE-MOULDING OF PANELS 2 3 4 5 6 Has the panel been lifted from the base before 16 hours? (if Yes mention hours) Is panel type and date of casting inscribed/painted on panel ? Is honeycombing of concrete observed? Are the corners and edges of panels damaged? Have the broken edges, corners repaired? Are the Connectors and I bolts placed in correct position? STORAGE & CURING 1 Has the area for storage of panels been properly levelled and compacted? Have minimum four Wooden rafters/Concrete blocks been used between panels during storage? (Between ground and first panel also) Before placement of panels in stack are all the concrete blocks placed at their correct positions? During stacking, are all the I-bolts on the same side? Are more than six panels stacked in one column? Is curing done by spray method? If no, mention system Is curing done for seven days? (If No mention days of curing) 4 5 6 7 M AC 3 C II 2 TRANSPORTATION OF PANELS TO SITE 1 2 Does the truck trailor used has open sides? If no, is there a clear gap of 100mm between the truck body and panels? Are wooden rafters placed between truck base and 1st panel? (3 for standard, 4 for top and two for bottom panels.) Are more than four panels stacked above each other during transportation? Has any panel damaged during loading? (Record the type, number and cause for damage in a separate register) 5 IV IG 4 H T III 3 TM 2 Is the location secured to prevent any theft/damage/misuse? R 1 STORAGE OF PARAWEB & GEOTEXTILES Is covered protection provided for prevention of U-V exposure? STORAGE OF PANELS AT SITE 1 2 Has the area for storage of panels been properly levelled and compacted? Has the unloading and stacking of panels been properly carried out? Have minimum four Wooden rafters/Concrete blocks been used between panels during storage? (Between ground and first panel also) During stacking, are all the I-bolts on the same side? Are more than six panels stacked in one column? Has any panel damaged during unloading and stacking? (Record the type, number and cause for damage in a separate register) O PY V 3 No AF ER R I 1 Date: Yes C 4 5 © 6 REMARKS: SITE ENGINEER MI/QF/113 R02 03.09.12 Frequency : The checklist needs to be maintained on weekly basis. MI/MP/38 R02, Date: 06.06.2016 54 Annexure-I: Monitoring Formats CHECK-LIST OF SITE-PREPARATION FOR ERECTION OF PANELS Project: Client: Structure: PREPARATION OF SITE FOR RS Wall I Yes No Has the plan area been marked along with survey team of Main Contractor before excavation? Is the excavation done as per levels in drawing? Check, if proposed levelling pad has minimum embedment as shown in drawing? If no, has the deviation in embedment and affected chainages reported to design team? Has rolling been done in the excavated area for compaction of loose soil? In areas where roller cannot access, has a plate vibrator/ vibro tamper been used? Check if there are any weak pockets? If yes, have the loose pockets been replaced with granular fill? Have the levels been checked again for confirmation? Has the bearing capacity been confirmed? Has the density been checked as per QA plan? Is the density check done by Sand-replacement method ? If no, mention the alternate method and send values to WDC for ensuring SBC. Is the density of compacted ground more than 95% modified Proctor density? AF ER R I 1 2 3 4 5 6 M AC C 7 8 9 10 11 12 13 H T 14 Has the filling around the foundation of the abutment up to bottom of levelling pad done in layers not exceeding 200mm compacted thickness? IG 15 LAYING OF LEVELLING PAD II Has the alignment been marked along with survey team of Main Contractor? Are wooden/steel pegs placed along the alignment (every 5m) with levels marked for top of PCC levelling pad? Confirm the grade of concrete is as per drawing before laying? Has PCC been provided with slope at the end of days work? (Refer erection methodology) Is the Top of the levelling pad neatly finished? Is the TLP within +/- 5mm of desired level of levelling pad? Has the line been marked on levelling pad to lay the key? Has the line of shutter been checked before casting the key? Has the shuttering been adequately supported? Has the inner line of key been checked after casting? Has the levelling pad and key been cured for 7 days? R 1 PY 2 3 © C O 4 5 6 7 8 9 10 11 Date: Wall No.: Ch: to REMARKS: SITE ENGINEER MI/QF/114 R04 11.07.16 Frequency : The checklist needs to be maintained when the casting of levelling pad is carried out. MI/MP/38 R02, Date: 06.06.2016 55 Annexure-I: Monitoring Formats CHECK-LIST OF TOOLS FOR ERECTION OF PANELS Project: Client: 17 18 19 20 21 22 AF ER R I C M AC O 23 24 H T 15 16 IG 14 R 8 9 10 11 12 13 List of equipment required. Yes No For measurement: Steel tape (5m) Steel tape (30m) Plumb-bob Level pipe Right angle Spirit level 1m and 30 cm Spacer Bar For casting of levelling pad: Adequate number of shuttering plates and chanels Timber support for shuttering Needle vibrator Wooden mallet Wooden trowel Aluminium Straight Edge, 2,5m long Curing arrangement: Hessian cloth For lifting panels: Wire rope Sling and Lifting Belt Pair of Lifting eye For erection of panels: Crow-bar (short and long) Wooden wedges Timber support clamps Timber/steel props Spanners (for fastening nuts-bolts) EPDM pads For Geotextiles: Scissors Paste (any suitable adhesive) For Paraweb TM : TM Appropriate grade of ParaWeb Hammer J-hooks Rear Anchor bar S-clamps Note: All the mentioned tools/plants should be either present or easily accessible at the work-site when work is going on. PY 1 2 3 4 5 6 7 Date: Availability © C 25 26 27 28 29 MI/QF/115 R02 03.09.12 SITE-IN-CHARGE Frequency : The checklist need to be maintained at the start of panel erection activity and then, continued on monthly basis. MI/MP/38 R02, Date: 06.06.2016 56 Annexure-I: Monitoring Formats CHECK-LIST FOR INSTALLATION OF PANELS Project: Client: Structure: 4 5 6 7 8 9 10 11 12 13 14 15 4 5 © 6 PY 3 O 1 2 Layer: ___________ 2. BACKFILL PLACEMENT Is the thickness of loose un-compacted soil not more than 300mm? Is direct dumping of fill taking place within 1.5m of panel face? Is Vibro-roller used for compaction? Only plate vibratory roller or baby roller is operated behind panels for width of 2m? In areas where vibro-roller cannot access, has a 100kg plate vibrator/ vibro tamper been used? Is Modified Proctor density and quality of backfill material checked as per QA plan? Is field density check done by Sand-Replacement method? If no, mention the alternate method.___________________ Is density of compacted ground more than 97% modified Proctor density? Has the density of compacted ground been recorded in the monitoring format? C II Date: ____________ Wall No.: _________ Ch: ____ to______ R IG 16 AF ER R I 3 C 2 M AC 1 INSTALLATION OF PANELS Have all the fixtures for panels to be erected been checked? Have the first row panels been propped from outside before placing the fill material? Are the props resting on firm ground? The front face are matched for every panel during installation? Has the initial lean for each panel been checked and recorded? Are timber support clamps fixed on the panels? Are the wooden wedges used in joints placed 150mm away from panel corners? Are two wooden wedges provided per side? Is the distance between the adjacent panels checked? Is the running dimension over five panels and five gaps checked? Has the alignment of panels been checked? Are the panels in level? Is the movement of panel after placing and compacting backfill monitored and recorded? Are the dimensions at the gaps between panels checked and recorded? Has the geotextile been placed/fixed on the horizontal and vertical joints of panels? Are the EPDM pads placed at required location? H T I Date: ____________ Wall No.: _________ Panel: ____to______ Row: ____________ Yes No 7 8 9 10 Contd. MI/MP/38 R02, Date: 06.06.2016 57 Annexure-I: Monitoring Formats CHECK-LIST FOR INSTALLATION OF PANELS Project: Client: Structure: III DRAINAGE Is the filter media monitored as per QA plan? Is the thickness of filter media is as per drawings? Has the laying of filter media started from 300 mm below GL? Has the filter media been compacted with vibratory plate compactor? Is a lap of 100mm provided between adjacent geotextile? AF ER R I 1 2 3 4 5 Date: Wall No.: Ch: to Layer: TM C CHECK-LIST FOR INSTALLATION OF PARAWEBTM PARAWEB 1 Has the ParaWebTM grade corresponding to the layer been checked from design section drawings? 2 3 Has the ParaWebTM been checked for defects/damages before laying? Is the surface of compacted ground free of any edge and protrusions? 4 Have the rear anchor bars been properly installed at required location and spacing as per drawings? 5 6 7 Does the length of ParaWebTM correspond to design section drawing? Has an overlap of 2m been provided at the start (rear end of reinforced length)? Are S-clamps used in overlap? 8 Is the overlap at intermediate stage located in the rear end of reinforcement length and at least 1m? M AC IV R IG H T LAYING Date: Wall No.: Ch: to Yes No PY Has the tightness of ParaWebTM been ensured before next round of backfill dumping starts? 10 Is there any damage to installed ParaWebTM during filling operation? REMARKS: © C O 9 MI/QF/116 R02 03.09.12 SITE ENGINEER Frequency : The checklist need to be maintained on daily basis as per the sequence of activity executed at site. MI/MP/38 R02, Date: 06.06.2016 58 Annexure-I: Monitoring Formats CHECK-LIST FOR CASTING OF COPING BEAM Project: Client: Structure: COPING BEAM I 4 5 6 7 8 AF ER R I 3 C 2 Is the reinforcement provided in coping beam as per drawing? Has the shuttering has been erected in proper line with adequate support? Is the gap between the shutter (for crash barrier casting) and panel face properly filled with thermocoal? Has the level of top of concrete been marked as per drawing? Is the grade of concrete as per drawing? Has the concrete been placed up to required level and compacted? Has the top of coping beam recorded at every 5m along wall length? Has the coping beam been cured for 7 days? M AC 1 Date: Wall No.: Ch: to Yes No SITE ENGINEER H T REMARKS: MI/QF/117 R01 03.09.12 © C O PY R IG Frequency : The checklist needs to be maintained when the casting of coping beam is carried out. MI/MP/38 R02, Date: 06.06.2016 59 © C O PY R IG H T M AC C AF ER R I Annexure-I: Monitoring Formats MI/MP/38 R02, Date: 06.06.2016 60
0
You can add this document to your study collection(s)
Sign in Available only to authorized usersYou can add this document to your saved list
Sign in Available only to authorized users(For complaints, use another form )