Non Detail Engineer Design Sumur HCE-10A Ke Tie-In PAD 7 Document No: DNG1-PM-000-PLN-ENG-50011 Rev. 0 x Approved Approved With Note Not Approve Reviewed By Approved By (Approval for Construction) Name: Beny Haryanto Date : 04 Oktober 2022 PT KWARSA HEXAGON Name: Bhaskara Date : 04-Okt-2022 Name: M. Thasril Date : 04-Okt-2022 PT. GEO DIPA ENERGI INSPECTION AND TEST PLAN ELECTRICAL WORK Detail INSPECTION AND TEST PLAN ELECTRICAL WORK Document No : DNG1-PM-000-PLN-ENG-50011 Rev. 0 REVISION SHEET Page 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 Detail A X X X Revision B C 0 1 INSPECTION AND TEST PLAN ELECTRICAL WORK Document No : DNG1-PM-000-PLN-ENG-50011 Rev. 0 COMMENT SHEET No Page/Bab Revision Date PMC EPC 1 Page Rev A 01/09/2022 Dimanakah lampirannya ( Detail ITP Electrical see attachment-1). Noted 2 ( Detail ITP Electrical see attachment-1). Page 6 Cables For Power, Instrumentation and Rev 0 03/10/2022 Tolong tambahkan pada termination item 4. Sealer cable inlet Tolong tambahkan pada testing item 2. Grouning testing Noted Tolong tambahkan pada testing & SAT vendor transformer testing report Tolong tambahkan pada testing & SAT vendor transformer item 6. Oil level & temperature alarm testing Tolong tambahkan pada termination item 4. Sealer cable inlet Tolong tambahkan pada 7. testing item 7. ACB (circuit breaker) testing Tolong tambahkan pada 5. termination item 4. Sealer cable inlet Tolong tambahkan pada 6. testing item 4. ACB (circuit breaker) & VSD testing Tolong tambahkan pada 6. testing item 5. busbar testing Tolong tambahkan pada 6. testing item 6. Grouning testing Tolong tambahkan pada 6. testing item 7. Local remote control testing Noted Communic, Control Page 6 Transformer Page 7 MV Switchgear Page 7 LV MCC Detail COMPANY PT. Kwarsa Hexagon (PMC) BY POSITION Beny Haryanto Electrical Engineer Noted Noted KSO Poeser Maharani Alifia Rahman Electrical Engineer INSPECTION AND TEST PLAN ELECTRICAL WORK Document No : DNG1-PM-000-PLN-ENG-50011 Rev. 0 TABLE OF CONTENTS Detail 1. PURPOSE .................................................................................................................................... 4 2. SCOPE ......................................................................................................................................... 4 3. OBJECTIVE .................................................................................................................................. 4 4. ABBREVIATION AND DEFINITIONS ............................................................................................. 4 5. INSPECTION AND TEST PLAN FOR ELECTRICAL .......................................................................... 4 INSPECTION AND TEST PLAN ELECTRICAL WORK Document No : DNG1-PM-000-PLN-ENG-50011 Rev. 0 1. PURPOSE The purpose of this procedure is to describing construction activities to be inspected or tested as required by contract specifications in the sequential manner of construction work. 2. SCOPE The execution plan describes the planning for Contractor’s person in-charge/site organization, time schedule, mobilization, HSSE, facilities of construction work for Tie-in Sumur HCE-10A Dieng Unit-1 Project. 3. OBJECTIVE This objective of this procedure is to maintain the uniformity and consistency of Contractor’s Quality, schedule and safety activities by all parties and personnel involved in Dieng project. The objectives of execution plan are that : Only accepted facilities by contract documents will be delivered to Owner. No defects/troubles/non-conformities and pre-commissioning work will be achieved within agreed schedule. 4. ABBREVIATION AND DEFINITIONS Abbreviation Definition Owner PT. Geodipa Energi PMC Project Management Construction Contractor KSO Poeser-Maharani Subcontractor The person, firm or corporation to whom the Subcontract is issued 5. INSPECTION AND TEST PLAN FOR ELECTRICAL Inspections will be conducted by Contractor and witnessed by Owner’s inspector in accordance with applicable ITP. Inspection record for the witness inspection is reviewed and signed by the inspector soon after completion of the inspection. ( Detail ITP Electrical see attachment-1). Detail INSPECTION AND TEST PLAN ELECTRICAL WORK Document No : DNG1-PM-000-PLN-ENG-50011 Rev. 0 Attachment-1 Detail INSPECTION AND TEST PLAN (ITP) ERECTION OF ELECTRICAL SYSTEM Discipline : Electrical Title : ITP Electrical NO 1 ITEM LEGEND : KSO/ Contractor A : PMC B : Owner / GDE C : Other (Disnaker, etc) D : KKS NO. Cables For Power, as standard Instrumentation and requirement Communic, Control WORK STEP 1. Material check 2. Supporting for cable trays & conduit INSPECTION & TEST ITEM FREQUENCY OF INSPECTION APPLICABLE CODE AND STANDARD INSPECTION RECORD H W PW R CONFIRMATION OF INSPECTION REMARKS A B C MRR W R W, R MRR W R W, R Installation Record W R R D Code & T 1. Visual check 100% 2. Quantity check 100% 1. Position Check 100% 2. Elevation Check 100% Installation Record W R R 3. Leveling Check 100% Installation Record W R R 4. Bolting check 100% Inspection Report W R R 1. Visual Check 100% Inspection Report W R R 2. Dimension Check 100% Installation Record W R R 1. Wiring Check 100% Installation Record W R R R 2. Connection Check 100% Installation Record W R R R Shop Drawing Packing List Installation Drawing 3. Pulling Cable Technical Specification 4. Termination 2 Transformer as standard Drawing & Technical Spec. 3. Continuity Check 100% Installation Record W R R R 5. Testing 1. Insulation Resistance Test 100% Drawing & Technical Spec.Inspection Report W W, R W, R W, R 1. Material Check 1. Visual Check 100% W R W, R 100% Shop Drawing Packing List MRR 2. Quality Check MRR W R W, R 1. Position Check 100% W R W, R 2. Level Check 100% Erection Drawing Installation Record W R W, R 3. Bolting 100% W R R 1. Position Check 100% W R R 2. Level Check 100% W R R 1. Visual Check 100% Installation Record W R R 2. Dimension Check 100% Installation Record W R R 1. Wiring check 100% Inspection Report W R R R 2. High Potential test 100% Inspection Report W W, R W, R R 1. Phase sequence Check 100% Test Record W W, R W, R W, R 2. Tap setting Check 100% Test Record W W, R W, R W, R 3. Insulation Resistance Check 100% Test Record W W, R W, R W, R 4. Earth resistance Check 100% Test Record W W, R W, R W, R requirement 2. Lifting & On base 3. Assembly & Insulation Erection Drawing 4. Cabling Installation Record Technical Specification 5. Termination 6. Testing Detail 1 of 7 Drawing & technical spec. Test Specification : Hold : Witness : Partial Witness : Review Document INSPECTION AND TEST PLAN (ITP) ERECTION OF ELECTRICAL SYSTEM Discipline : Electrical Title : ITP Electrical NO 3 ITEM MV Switchgear LEGEND : KSO/ Contractor A : PMC B : Owner / GDE C : Other (Disnaker, etc) D : KKS NO. as standard WORK STEP 1. Material Check requirement 2. Foundation INSPECTION & TEST ITEM FREQUENCY OF INSPECTION 5. High Potential Test 100% 1. Visual Check 100% 2. Quality Check 100% 1. Center Line Check 100% 2. Elevation Check 100% 1. Position Check 100% 2. Level Check 100% 1. Alignment Check 100% 2. Center Line check 100% APPLICABLE CODE AND STANDARD REMARKS A B C D Test Record W W, R W, R W, R MRR W R W, R MRR W R W, R Foundation Inspection Report W R W, R W R W, R Installation Record W R R Installation Record W R R Installation Record W R R Installation Record W R R Tightening Record W R R T Erection Drawing 4. Assembly & Installation Installation Drawing 3. Bolting Check 5. Cabling 6. Termination 7. Testing 4 Detail LV MCC as standard 1. Material Check Distribution Board Lighting requirement Distribution UPS 2. Lifting & on base 1. Visual check 100% Inspection Report W R R 2. Dimension Check 100% Inspection Report W R R 1. Wiring Check 100% Inspection Report W R R 2. Bus Bar Connection Check 100% Inspection Report W R W, R 3. Continuity Check 100% Inspection Report W R W, R 4. Sealer at cable inlet 100% Inspection Report W R W, R 1. Calibration Check 100% Test Record W, R W, R W, R W, R 2. Insulation Resistance Test 100% Test Record W, R W, R W, R W, R 3. Safety Features Check 100% Test Record W, R W, R W, R W, R 4. Space Heater Check 100% Test Record W, R W, R W, R W, R 5. Earthing Resistance Test 100% Test Record W, R W, R W, R W, R 6. High Potential Test 100% Test Record W, R W, R W, R W, R 7. ACB Test 100% Test Record W, R W, R W, R W, R 1. Visual Check 100% MRR W R W, R 2. Quality Check 100% MRR W R W, R 1. Position Check 100% Installation Record W R R 2. Level Check 100% Installation Record W R R Technical Specification Drawing & Technical Spec. Test Specification Shop Drawing Packing List Erection Drawing 2 of 7 : Hold : Witness : Partial Witness : Review Document CONFIRMATION OF INSPECTION Code & Shop Drawing Packing List Code & Shop Drawing Packing List Civil Drawing 3. Lifting & On Base INSPECTION RECORD H W PW R T INSPECTION AND TEST PLAN (ITP) ERECTION OF ELECTRICAL SYSTEM Discipline : Electrical Title : ITP Electrical NO ITEM LEGEND : KSO/ Contractor A : PMC B : Owner / GDE C : Other (Disnaker, etc) D : KKS NO. WORK STEP 3. Assembly & Installation 4. Cabling INSPECTION & TEST ITEM FREQUENCY OF INSPECTION APPLICABLE CODE AND STANDARD INSPECTION RECORD H W PW R CONFIRMATION OF INSPECTION REMARKS A B C Alignment Record W R R Installation Record W R R Tightening Record W R R D Code & T 1. Alignment Check 100% 2. Center Line Check 100% 3. Bolting Check 100% 1. Visual Check 100% Inspection Report W R R 2. Dimension Check 100% Inspection Report W R R 1. Wiring Check 100% Inspection Report W R R R 2. Connection Check 100% Inspection Report W R R R 3. Continuity Check 100% Inspection Report W R R R 4. Sealer at cable inlet 100% Inspection Report W R R R 1. Operability Check 100% Test Record W W, R W, R W, R 2. Insulation Resistance Test 100% Test Record W W, R W, R W, R 3. Calibration Check 100% Test Record W W, R W, R W, R 4. ACB & VSD Testing 100% Test Record W W, R W, R W, R 5. Busbar Testing 100% Test Record W W, R W, R W, R 6. Local-Remote Control Testing 100% Test Record W W, R W, R W, R 7. Grounding resistance test 100% Test Record W W, R W, R W, R 1. Visual Check 100% MRR W R W, R 2. Quality Check 100% MRR W R W, R 1. Alignment Check 100% Alignment Record W R R 2. Center Line Check 100% Installation Record W R R 3. Continuity Check 100% Tightening Report W R R 1. Visual Check 100% Inspection Report W R R 2. Dimension Check 100% Inspection Report W R R 1. Wiring Check 100% Inspection Report W R R R 2. Connection Check 100% Inspection Report W R R R 3. Continuity Check 100% Inspection Report W R R R 1. Operability Check 100% Test Record W W, R W, R W, R Shop Drawing Packing List Installation Drawing : Hold : Witness : Partial Witness : Review Document Technical Specification 5. Termination 6. Testing 5 DCS Panel as standard Instrument Panel requirement 1. Material Check 2. Insulation (Battery Charger) 3. Cabling Drawing & Technical Spec. Test Specification Code & Shop Drawing Packing List Installation Drawing Technical Specification 4. Termination Detail 5. Testing Drawing & Technical Spec. Test Specification 3 of 7 T INSPECTION AND TEST PLAN (ITP) ERECTION OF ELECTRICAL SYSTEM Discipline : Electrical Title : ITP Electrical NO 6 7 ITEM KKS NO. Cable Tray System Cable and Wires LEGEND : KSO/ Contractor A : PMC B : Owner / GDE C : Other (Disnaker, etc) D : WORK STEP FREQUENCY OF INSPECTION APPLICABLE CODE AND STANDARD 2. Insulation Resistance Test 100% 1. Visual Check 100% 2. Quantity Check 100% & TestCode Specification Shop Drawing Packing List Shop Drawing Packing List 2. Supporting 1. Visual Check 100% Installation Drawing 3. Assembly & Installation 1. Alignment Check 100% 2. Center Line Check 100% 3. Bolting Check 100% 1. Visual Check 100% 1. Material Check as standard INSPECTION & TEST ITEM 1. Material Check requirement 2. Quality Check 100% 2. Supporting 1. Visual Check 100% 3. Pulling Cable 1. Visual Check 100% 2. Dimension Check 100% 1. Wiring Check 100% 2. Connection Check 100% Installation Drawing Code & Shop Drawing Packing List INSPECTION RECORD H W PW R CONFIRMATION OF INSPECTION REMARKS A B C D Test Record W W, R W, R W, R MRR W R W, R MRR W R W, R Inspection Report W R R Alignment Record W R R Installation Record W R R Tightening Record W R W, R MRR W R W, R MRR W R W, R Installation Record W R R Inspection Report W R R Inspection Report W R R Inspection Report W R R R Inspection Report W R R R Inspection Report W R R R Test Record W W, R W, R W, R Test Record W W, R W, R W, R T T Technical Specification 4. Termination 5. Testing 3. Continuity Check 100% 1. Insulation Resistance Test 100% 2. High potential test for MV & 100% Drawing & Technical Spec. Drawing & Technical Spec. Test Specification HV Cables 8 9 Detail Conduit and Embedded Conduit and Fitting 1. Material Check as standard 1. Visual Check 100% Installation Drawing Installation Record W R R 2. Quality Check 100% Installation Drawing Installation Record W R R 2. Elevation Check 1. Visual Check 100% Installation Drawing Installation Record W R R 3. Installation 1. Visual Check 100% Installation Drawing Installation Record W R R 2 Leveling Check 100% Installation Drawing Installation Record W R R 1. Visual Check 100% W R W, R 100% Shop Drawing Packing List MRR 2. Quality Check MRR W R W, R 2 Supporting 1. Visual Check 100% Installation Drawing Installation Record W R R 3 Insulation 1. Leveling Check 100% Installation Record W R R 1 Material Check requirement Installation Drawing 4 of 7 : Hold : Witness : Partial Witness : Review Document INSPECTION AND TEST PLAN (ITP) ERECTION OF ELECTRICAL SYSTEM Discipline : Electrical Title : ITP Electrical NO 10 ITEM LEGEND : KSO/ Contractor A : PMC B : Owner / GDE C : Other (Disnaker, etc) D : KKS NO. Underground Grounding as standard Mesh and Risers requirement WORK STEP INSPECTION & TEST ITEM FREQUENCY OF INSPECTION APPLICABLE CODE AND STANDARD Above ground Grounding foras standard Equip. and Structures 12 as standard ( Equipment ) requirement B C Tightening Record W R R MRR W R W, R MRR W R W, R 1. Visual Check 100% 2. Quality Check 100% Code &Drawing Installation Shop Drawing Packing List Code & Shop Drawing Packing List 2. Elevation and poin check 1. Visual Check 100% Installation Drawing Installation Record W R R 3. Cable Laying 1. Visual Check 100% Installation Drawing Installation Record W R R 4. Termination 1. Wiring Check 100% Inspection Report W R W, R 2. Connection Check 100% Drawing & Technical Spec. Inspection Report W R W, R Inspection Report W R W, R Test Specification Inspection Report W W, R W, R MRR W R W, R MRR W R W, R Inspection Record W R R Inspection Record W R R Inspection Record W R R 5. Testing 1. Grounding resistance test 100% 1. Material Check 1. Visual Check 100% 2. Quality Check 100% Shop Drawing Packing List 2. Cable Laying 1. Visual Check 100% Installation Drawing 3. Termination 1. Wiring Check 100% 2. Connection Check 100% requirement Lighting System REMARKS A 100% 1. Material Check Drawing & Technical Spec. 3. Continuity Check 100% Inspection Record W R R 1. Grounding Resistance Test 100% Test Specification Test Record W W, R W, R 1. Material Check 1. Visual Check 100% MRR W R W, R 2. Quality Check 100% Shop Drawing Packing List MRR W R W, R 2. Supporting 1. Visual Check 100% Installation Drawing Installation Record W R R 3. Installation 1. Alignment Check 100% Alignment Record W R R 2. Center Line Check 100% Installation Record W R R 3. Bolting Check 100% Tightening Record W R R 1. Visual Check 100% Inspection Report W R R 4. Cabling Installation Drawing Technical Specification Detail 5. Termination 2. Dimension Check 100% Inspection Report W R R 1. Wiring Check 100% Inspection Report W R R Inspection Report W R R Inspection Report W R R 2. Connection Check 100% 3. Continuity Check 100% 5 of 7 Drawing & Technical Spec. Code & D T 4. Testing Code & : Hold : Witness : Partial Witness : Review Document CONFIRMATION OF INSPECTION 2. Tightness Check 3. Continuity Check 11 INSPECTION RECORD H W PW R T T INSPECTION AND TEST PLAN (ITP) ERECTION OF ELECTRICAL SYSTEM Discipline : Electrical Title : ITP Electrical NO 13 ITEM LEGEND : KSO/ Contractor A : PMC B : Owner / GDE C : Other (Disnaker, etc) D : KKS NO. Lighting System as standard ( Indoor & Outdoor ) requirement WORK STEP INSPECTION & TEST ITEM FREQUENCY OF INSPECTION 6. Testing 1. Operability Check 100% 1. Material Check 1. Visual Check 100% 2. Quality Check 2. Supporting 3. Installation 4. Cabling APPLICABLE CODE AND STANDARD INSPECTION RECORD H W PW R CONFIRMATION OF INSPECTION REMARKS A B C D Code & T Test Record W W, R W, R MRR W R W, R 100% Test ShopSpecification Drawing Packing List Shop Drawing Packing List MRR W R W, R 1. Visual Check 100% Installation Drawing Installation Record W R R 1. Alignment Check 100% Alignment Record W R R 2. Center Line Check 100% Installation Record W R R 3. Bolting Check 100% Tightening Record W R R 1. Visual Check 100% Inspection Report W R R 2. Dimension Check 100% Inspection Report W R R 1. Wiring Check 100% Inspection Report W R R Inspection Report W R R Inspection Report W R R Test Specification Test Record W W, R W, R Shop Drawing Packing List MRR W R W, R MRR W R W, R Installation Record W R R Installation Drawing Technical Specification 5. Termination 14 Underground Electrical as standard Cable Tunnel & Trench requirement 2. Connection Check 100% 3. Continuity Check 100% 6. Testing 1. Operability Check 100% 1. Material Check 1. Visual Check 100% 2. Quality Check 100% 1. Visual Check 100% 2. Supporting Drawing & Technical Spec. Installation Drawing 3. Pulling Cable 2. Leveling Check 100% Alignment Record W R R 1. Visual Check 100% Installation Record W R R Technical Specification 4. Termination 5. Testing 2. Dimension Check 100% Inspection Record W R R 1. Wiring Check 100% Inspection Report W R R R 2. Connection Check 100% Inspection Report W R R R 3. Continuity Check 100% Inspection Report W R R R 1. Insulation Resistance Test 100% Test Record W W, R W, R W, R 2. High Potential test for MV & 100% Test Record W W, R W, R W, R W W, R W, R W, R MRR W R W, R MRR W R W, R Drawing & Technical Spec. Code & Test Specification HV Cables Detail 15 Transformer as standard requirement 1. Material Check 1. Visual Check 100% 2. Quality Check 100% 6 of 7 Shop Drawing Packing List : Hold : Witness : Partial Witness : Review Document INSPECTION AND TEST PLAN (ITP) ERECTION OF ELECTRICAL SYSTEM Discipline : Electrical Title : ITP Electrical NO ITEM LEGEND : KSO/ Contractor A : PMC B : Owner / GDE C : Other (Disnaker, etc) D : KKS NO. WORK STEP 2. Lifting & on base 3. Assembly & Installation 4. Cabling INSPECTION & TEST ITEM FREQUENCY OF INSPECTION APPLICABLE CODE AND STANDARD INSPECTION RECORD H W PW R CONFIRMATION OF INSPECTION REMARKS A B C D Installation Record W R R Installation Record W R R Alignment Record W R R Installation Record W R R Tightening Record W R R Inspection Report W R R Inspection Report W R R Inspection Report W R R R Inspection Report W R R R Code & T 1. Position Check 100% 2. Level Check 100% 1. Alignment Check 100% 2. Center Line Check 100% 3. Bolting Check 100% 1. Visual Check 100% 2. Dimension Check 100% 1. Wiring Check 100% 2. Connection Check 100% 3. Continuity Check 100% Inspection Report W R R R 1. Insulation Resistance Test 100% Test Record W W, R W, R W, R 2. High Potential Test 100% Test Record W W, R W, R W, R 2. Operability Check 100% Test Record W W, R W, R W, R 2. Oil level Test 100% Test Record W W, R W, R W, R 3. Temperature Alarm Test 100% Test Record W W, R W, R W, R Shop Drawing Packing Erection Drawing List Installation Drawing Technical Specification 5. Termination 6. Testing (FAT/SAT) Detail 7 of 7 Drawing & Technical Spec. Test Specification : Hold : Witness : Partial Witness : Review Document
0
You can add this document to your study collection(s)
Sign in Available only to authorized usersYou can add this document to your saved list
Sign in Available only to authorized users(For complaints, use another form )