ETCS Level 1 Project
REQUEST FOR INFORMATION (RFI)
Of:
Contract No: PEG-1193
RFI No: PEG-1193-24/75-CN-SI-RFI-0022
To: Mr. Jesus Emilio Martinez
Team Leader/Project & Contract Management –
Hill Intl -Transurb SA JV
Subject: Static Speed Profile
Package No: 24/75
Date: 01 August 2024
From: Siemens Mobility GmbH
DISCIPLINE:
REFERENCE:
SPECIFICATION:
BOQ ref:
DRAWING:
Location/Zone:
Information Requested:

Please provide the complete ETCS Static speed profile. For points it is requested to have the
speed also in diverging directions. Besides that the speed for the tracks after the diverging point
is not available and herewith requested.

Speed of all point machines for normal and diverging direction
Existing information’s as example:
Point Machine Type: The Type of some point machine is missing in the plan.
Needed information’s as example:
Request For Information (RFI) Procedures
ETCS level 1 Project
Document No: PEG-1193-PP-09-02-FM Rev.0
Revision Date: Nov 2023
ETCS Level 1 Project
Point Machine Speed: The speed of all points machine is missing.
Point
P01
P02
P03
P04
P05
Speed
L
?
?
?
?
?
Speed
R
?
?
?
?
?
Point
P06
P07
P08
P09
P10
Speed
L
?
?
?
?
?
Speed
R
?
?
?
?
?
Point
P11
P12
P13
P14
P15

The missing information about speed L/R [km/h] should be fulfilled.

Does the siding track have the same speed limit as the point?
Speed
L
?
?
?
?
?
Speed
R
?
?
?
?
?
Static speed profile (SSP) - table of the permanent restricted speed:
Cairo/ Shubra
Km2.500
Km5.500
Up/ Dawn
50
Curves
According to the table of the permanent restricted speed from Cairo to Shubra, we have a speed limit of
50km/h for 3km due to curves.
 due what there is a speed restriction of 3km?
 Is the restriction applicable for all tracks or only main tracks?
 Is the speed of the main line (outside this restriction from table) 160km/h?
Gradient Profile (GP)
Is the following gradient profile applicable of all tracks?
Request For Information (RFI) Procedures
ETCS level 1 Project
Document No: PEG-1193-PP-09-02-FM Rev.0
Revision Date: Nov 2023
ETCS Level 1 Project
Reason Requested:
The PoE creation needs to be created for ETCS Trackside purpose based on gradient profile (GP) and
static speed profile (SSP) for all areas, tracks, points (incl. diverging direction/turn out) on the plan,
where it is possible to go with the train. GP & SSP profile shall be provided completely for all stations in
whole line (main line, siding tracks) without missing data for some areas, tracks, points (incl. diverging
direction/turn out), otherwise can lead to dangerous/safety moments on the track because assumed
speed will be too high.
01.08.2024 ....................
Jan Birka ................
RFI DATE
REQUESTED BY
Hill-Transurb JV Receive:
Moebes
Hans
.............................................
Digitally signed by Moebes Hans
DN: cn=Moebes Hans, c=DE,
o=Siemens,
email=hans.moebes@siemens.com
Date: 2024.08.01 11:04:31 +02'00'
CONTRACTOR’S AUTHORISED REP.
Contractor Receive:
RESPONSE TO CONTRACTOR
Response…………………………………………………………………………………………….……………
…………………………………………………………………………………………………………………………
………………………………
REVIEWER
………………
DATE
………………………………….
PROJECT MANAGER
……………..
DATE
NOTE: This is not a variation document. If the CONTRACTOR considers any part of this response a variation to its
cost or time of performance, the CONTRACTOR is required to give notice in accordance with the terms of the
General Conditions of Contract.
Request For Information (RFI) Procedures