Uploaded by Mix Up

Shameer Aboobacker

advertisement
SHAMEER ABOOBACKER
Sr. Structural / Infrastructural / Civil Draughtsman
Contact: +966 55 604 8724
Email: shemivty@gmail.com
PROFILE
•A qualified Structural /Civil and
Infrastructure AutoCAD & Civil3D
Draughtsman, possessing 16 years of
experience in AutoCAD designing and
drafting of Multi-storied buildings,
Shopping complexes, Palace, Luxury
Villas, Roads, Utilities, Railway Structures
Such as Viaducts, Abutments, Cut and
cover, Running Tunnels, Cross Cuts, Adits,
Culverts, Temporary traffic control plan
(TTCP) Trial trench details, Steel structure
bridges details, Preparing bar bending
schedule (BS8666), taking Earthwork
quantity of cutting and filling for the site
preparation, Taking coordinates for Pier
setting out for metro rail and
Infrastructure Utility Services drawing,
etc.
•Since 2014 to 2020, & 2021 to till date
associating FAST Metro railway project
Riyadh & NEOM Spain Mountain Running
tunnel
Saudi
Arabia
(Samsung
engineering), As a Structural and
Infrastructural, Civil Draughtsman
to
provide CADD & Civil3D support in
Structural
/
Infrastructural
Civil
Earthwork, Utility Services.
•Expert in all versions of AutoCAD and
proficient with graphic standards.
•Able to develop Earthwork Cut & Fill
Quantity by using Autodesk Civil 3D.
•Well versed with quality procedures,
manuals and implementation of projects
involving method engineering.

•Provide CAD technical support for project CAD users
•Develop the Earthwork Quantity Cut and Fill by Using Autodesk Civil3D.
•Training of CAD Coordinators on project.
•Setup of applications as required by the project.


1. NEOM SPINE RUNNING TUNNEL PROJECT TABUK-SAUDI
ARABIA-PROJECT VALUE 1.8B USD 2022 TO TILL DATED
2. FAST METRO RAILWAY PROJECT RIYADH-SAUDI ARABIA
PROJECT VALUE 7.9B USD
2014 TO 2020
DUTIES AND RESPONSIBILITIES
•
•
•
•
•
Provide the necessary Civil and Structural shop drawing for
Samsung engineers such as Site preparation plans, Earth work
detailing, Cut and Fill Quantity by using Autodesk civil 3D, under
ground stations, Elevated stations, Tunnels, Culverts, Cut and
Cover, Cross cuts, Adits, General arrangement details, Detailed
Rebar shop drawing & Bar bending schedule for construction or
site implementation.
Traffic, Infrastructure, Roads, Utilities, profile creation, and Survey
drawing preparation Experience as per Municipality standards.
Coordinate and execute the list of drawing needed to be
produced in accordance with the supervising manager.
Assist the engineers to their drawing needs for site
implementation.
Provide the shop drawing for the construction department and
tunnels including different type of normal pier, portal pier,
normal deck and widen deck etc.
CONTACT
SAUDI BINLADING GROUP
MOBILE:
+971556048724
3. Mohammed Bin Rashid Al Maktoum City – District
One, Dubai-UAE
2020-2022
LINKEDIN:
Mohammed Bin Rashid Al Maktoum City – District One, part
of the Meydan master development in Dubai, has awarded
a raft of contracts for the construction of 25 waterfront
residential buildings with a total of 1,464 apartments.
www.linkedin.com/in/shameeraboobacker-22281488
EMAIL:
shemivty@gmail.com
4.
EDUCATION
The King Abdullah Financial District will house the large
community of professionals working within the financial
sector and related industries, hosting the headquarters of
the Capital Market Authority, the Stock Exchange, banks,
financial institutions and other service providers such as
accountants, auditors, lawyers, analysts, rating agencies,
consultants, and IT providers.
AL NOOR ITI VATANAPPALLY-THRISSUR
• DIPLOMA IN CIVIL ENGINEERING (AITES)
• DRAUGHTSMAN CIVIL (NCVT)
• TECHNICAL DRAFTING (CIVIL)
5.
COMPUTER SKILLS
CIVIL 3D
MS OFFICE
PERSONAL INFORMATION
Nationality : Indian
Religion
: Muslim
Passport No: L4977368
Visa Status : Employment Visa (UAE)
Driving License: KSA (Valid License)
: India (Valid License)
BURJ DUBAI DEVELOPMENT BURJ VIEWS PLOT NO 85
Client: EMAAR
2006 TO 2008
The Project consists of construction of 3 Towers for
commercial and residential developments consisting of 3
underground basements 5 podium levels (having swimming
pools, gardens) and 33 Storey above podium level.
Auto CAD (All Version)
REVIT STRUCTURE
KING ABDULLAH FINANCIAL DISTRICT (KAFD) RIYADHSAUDI ARABIA.
2010 TO 2014
DUTIES AND RESPONSIBILITIES
•
•
•
•
•
•
Preparation & Submission of Structural drawings of General
Arrangement, Beams, Columns, PT Slabs, Walls, Construction
joints & Expansion joints, Ramps, Steel Structures, Tower crane,
setting out plan, providing coordinates as per site requirements
& Stair cases etc. as per consultant’s requirement by using Auto
CAD.
Preparation as well as checking of Bar Bending Schedule
(BS8666)
Study Construction drawings for high-rise building, Tower Project
(3-Nos 40 Story & KAFD ZONE-2, – 7 & high-rise building.
Make modification, alterations if required for drawings.
Co-ordinate with Project Manager, Technical Manager,
Construction Manager, Senior Structural Engineer of Consultants
for all issues of structural drawings.
Ensure all structural drawings are with compliance with the
consultant’s specifications.
ARKIPLAN CONSULTING ARCHEITECTS & ENGINEERS
DUBAI-UAE
2008 TO 2010
Arkiplan consulting architects and engineers is a member of
the RKM group of companies under the sponsorship of His
Highness Sheikh Rashid Bin Khalifa Al Maktoum
I hereby declare that the information furnished above is true to
the best of my knowledge and belief. I am also confident of my
ability to work in a team.
Shameer Aboobacker
Download