GMI G e r m a n - M a l a y s i a n I n s t i t u t e SES 1462 PROBLEM BASED LEARNING 1 WIND ENERGY SYSTEM Problem Statement ArborWind is a leading company in design, manufacturing, sales and commissioning of highperformance stand alone and grid connected Vertical Axis Wind Turbine. ArborWind’s roots are in finding solutions to tough engineering problems. Your group have been selected by this company as consultant to develop new area to setup wind plant. You need to come up with proposal and presentation for the Board Directors for the new plant development. The proposal should conclude - Propose location Wind data (meteorology) Selected vertical axis wind turbine design Output power predicted for a year To develop the area, as consultant you need to suggest the company how to handle the local residents on the area of acceptance of the new development wind plant. Submission Part Your group should perform the following upon submission and present • Submit a proposal consisting of 1. 2. 3. 4. 5. Introduction on selected area Design of the wind turbine Wind data for the area Suggestion to local area residents Replica (3D printing) of selected vertical wind turbine GMI G e r m a n - M a l a y s i a n I n s t i t u t e 1. Sweep area of the turbine Before finding the wind power, you need to determine the swept area of the turbine according to the following equations: For HAWT: A=π×L2 For VAWT: A=D×H where: • • • L is the blade length - the radius of the horizontal-axis turbine; D is the diameter; and H is the turbine height. 2. Calculate the available wind power Once you know the sweep area, you can find the available wind power according to this formula: Pwind=0.5×ρ×v3×A where: • A is the sweep area; • ρ is the air density, assumed to be 1.225 kg/m³ by default (you can change it in advanced mode); • v is the wind speed - the typical usable range is approximately 3-25 m/s; and • Pwind is the available wind power.