Appointment of an architect

advertisement
Comments answers
1) Route C- F3 – Ability to Formalise appointments between architect and
client and between the client and other consultants.
Client's Decision to Appoint:
Client enquiries can take many forms but usually come in the form of a call or email
requesting details of fees and conditions of engagement. In many cases, the inquiry is relatively
informal when the client is someone who does business on a continuous basis. The good practice is
always to arrange a meeting where the client can assess the architect, and the architect can decide
whether it is advisable to work with that client.
Following the initial enquiry, the architect and the client will look to formalise their agreement. The
Architect will be an agent, a central role in the project's design, and may also choose to appoint
various consultants based on the project’s complexity.
The architect needs to clarify to the client precisely what services are to be undertaken, and this
should be done before entering the appointment, making sure that the agreed services are reflected
in the agreement between the architect and the client. The typical services that the architect
provides break down into three categories are:
-
Roles and responsibilities.
Design services
Other services, which include what are termed special services.
The roles are:
-
Project lead.
Health & safety
Cost consultant
Contract administrator
Lead designer
Designer
Design Services :
-
Stage 0 ( Strategic Definition)
Stage 1 ( Preparation & Brief)
Stage 2 ( Concept Design
Stage 3 ( Developed Design)
Stage 4 ( Technical Design)
Stage 5 ( Construction)
Stage 6 ( Hand Over and Closeout)
Stage 7 ( In Use)
Procurement activities
Other Services:
-
Management services
Sites investigations
Buildings survey
Development of a building
Town planning appeals and advice
Interior Design
Financial planning services
Tendering
Negotiations
Legal advice
Contractor’s claims
Historic Buildings
Other consultants
Determination of the fee
The fee negotiation will depend upon many factors like the amount of work, the size of the office,
whether the project is a “one-off”, and whether the project is exciting to the architect. The basis of
fees is usually the percentage of the construction cost building, time charge or lump sum.
An architect and client can decide upon an entirely different fee calculation. There is no limit on the
ways in which fees can be calculated to suit particular circumstances.
At a project team, the client would be left to negotiate terms and fees with each consultant
individually, as recommended by the architect. Still, these disputes can arise from conflicts between
differing disciplines' approaches. The idea of a project team is that an integrated approach is
presented to the client consisting of all the consultants under the coordination of a lead consultant,
who may or may not be an architect.
If the work involves an existing building, a larger fee is usually necessary because the architect will be
involved in much more work due to the constraints of the original structure, planning, services, etc. If
it is a Historic building or in a conservation area, the client may also be paying for the architect’s
special skills in this area.
In case of termination, the amount that the architect can recover in respect of fees will depend on
whether formal conditions of engagement have been entered into the circumstances of termination.
The architect has to state precisely what he considers to be a reimbursable expense. Expenses and
disbursements are often confused, and disbursement is often wrongly used to mean expenses.
Ordinary expenses are postage or other means of delivery, hotel and travelling expenses, and
printing what is needed to produce the work.
Engagement Agreements:
Formal agreements are established between the client, architect, and consultants. These agreements
outline responsibilities, fees, and the scope of work.
The RIAI provides standard contract forms for various types of appointments. Using one of the RIAI
agreement forms to formalise the contract is highly advisable. The RIAI forms of appointment are:
-
RIAI Agreement between client and Architect for provision of Architectural Services ( 8
Stages)
RIAI Agreement between client and Architect for Domestic Works ( 4 Stages)
RIAI Agreement between client and Architect for Commercial Small Works
RIAI Agreement between Client and Architect For Private Sector Apartments and Estate
Housing.
When the basis on fees and payment schedule is agreed and recorded, using preferably one of the
RIAI agreements above, the client and Architect sign the document.
The client needs to be advised at the time of appointing the architect of the client’s statutory
obligation to appoint a Project Supervisor Design Process ( PSDP) under the Safety Health and
Welfare Legislation. The appointment of the PSDP has to be done in a separate appointment using
the RIAI Agreement between the Client and Architect for the Project Supervisor Design Process.
2) Route C- F6 – Ability to carry critical self-appraisal.
Introduction:
This self-appraisal assesses my performance and growth as an architect since I started work in
Ireland. It provides an opportunity to reflect on my achievements, challenges, and areas for
improvement in my professional journey.
Professional Goals:
At the start of this review period, my main aim was to improve my project management skills and my
knowledge of construction Regulations and legislation in Ireland. Furthermore, I sought to obtain my
professional registration in the country, thus being able to practice the profession legally and in
accordance with the country's laws.
I started to take my first steps towards sustainable design architecture, a subject I have always been
interested in becoming a specialised professional.
Achievements:
Over the years, working as a Part II architectural professional, I have gained extensive knowledge in
the areas mentioned above. Initially, my primary task was to create drawings, but as time
progressed, I took on more diverse responsibilities. My first client meeting involved a one-off house
project, and from there, my roles expanded to encompass tasks such as scheme design, detailed
design, planning, and tendering.
After a significant period of working on residential projects, I had the opportunity to venture into
commercial design, which was a rewarding experience. Currently, I'm engaged in public government
projects, with a particular focus on schools and BOI. I have been fortunate to receive positive
feedback from my directors in the various offices where I have worked.
I have successfully completed the first year of the Architectural Practice program. I am working
diligently to attain a high grade, a crucial step toward achieving one of my most significant goals:
becoming a member of the RIAI (Royal Institute of the Architects of Ireland).
Additionally, I have completed the first year of a master's program in EED (Energy-Efficient Design)
and have also become a certified BER assessor at SEAI (Sustainable Energy Authority of Ireland).
These accomplishments represent my initial strides toward realising my ambition of becoming a
specialist in architectural sustainable design.
Challenges:
One of the most significant challenges I encountered was grasping the intricacies of the architectural
process in Ireland, including the relevant legislation, work stages, and regulations. In terms of the
creative design process, I found it to be consistent with what I have been doing since my graduation.
However, the professional practice in Ireland significantly differs from that in my home country.
Studying, comprehending, and gaining practical experience in all these aspects during my years
working in architectural offices has proven invaluable learning experience.
Skills and Competencies:
My comprehension of architectural practice legislation, regulations, and stages has significantly
advanced, contributing to increased confidence in my professional role. Nonetheless, I acknowledge
the need to develop my project management skills further to manage complex projects effectively.
Professional Development:
I attended the RIAI CPD workshop on Site Inspection, which broadened my understanding of this
field. Additionally, I took part in the RIAI conference and completed the BER Dwelling Assessor
course, subsequently registering with SEAI. Moreover, I have completed the first year of my master's
degree in EED (Energy-Efficient Design).
Future Goals and Growth:
In the years ahead, I am committed to immersing myself in studies and professional endeavours
pertaining to sustainable architecture, retrofitting, and passive house design. Additionally, I plan to
tackle more intricate projects, enhance my project management abilities, and broaden my portfolio
in sustainable architecture.
Self-Critique:
Despite my enhanced understanding of legislation, design stages, and regulations, I acknowledge
that my time management and project coordination skills require refinement. I need to strike a more
effective balance between my academic pursuits and professional responsibilities to achieve a
healthier work-life equilibrium.
Action Plan:
Sign up for PSDP And PCSC Courses.
Sign up for an advanced project management course.
Implement a more structured time management system.
Get more involved in site inspections and the completion stage.
Conclusion:
This self-appraisal reveals areas for improvement, which I view as opportunities for growth. I am
committed to enhancing my skills and embracing new challenges in the coming years.
3) Route C- D3 – Knowledge of planning
The planning application process in Ireland is a structured and regulated procedure that individuals,
businesses, and developers must follow when seeking permission to carry out construction or
development projects.
The planning process is the responsibility of the Project Architect, Design Certifier and Technical staff.
Planning permission is required in all those cases:
A- Development -Construction of New Buildings: Planning permission is usually required for
new construction, including residential, commercial, and industrial buildings.
B- Alterations or Extensions: Significant alterations or extensions to an existing building need
planning permission. An extension which is more than 40 square metres (this includes new
and any existing extensions).
C- Change of Use: Changing the use of a building (e.g., from residential to commercial) often
requires planning permission.
D- Demolition: The demolition of a structure can require planning permission in certain cases,
especially if it's located in a protected or conservation area.
E- Signage and Advertising: Erecting signage or advertising structures often requires planning
permission, subject to local regulations.
F- Change in Access: If you want to change the access point to a property, such as creating a
new entrance onto a public road, you'll typically need planning permission.
G- Development in Special Areas: Special areas, such as designated architectural conservation
areas, heritage sites, or flood-prone areas, may have additional planning requirements.
H- Subdivision of Land: Subdividing a piece of land into smaller plots or creating new building
sites requires planning permission.
I- Outdoor Structures: Certain outdoor structures like sheds, garages, and fences may require
planning permission, depending on their size, location, and local regulations.
J- Change in Land Use: Changing land use (e.g., agricultural land to residential development)
may require planning permission.
K- Development in Protected Areas: If the proposed development is within an area designated
as a special protection zone, a particular area of conservation, or a national monument, it
will likely require planning permission.
Pre-Planning Application :
Before submitting a planning application, it's advisable to conduct thorough research. This includes
reviewing local development plans and zoning regulations and consulting with relevant planning
authorities.
Application Form:
Having decided whether or not a planning application is necessary, the next step is to decide what
sort of application to make (As described below ) and to be aware of the various regulations which
set out the procedures which must be followed. These forms are available from the local planning
authority or online.
Planning Application requirements:
-
-
Appropriate information (i.e. Drawings, Outline Specifications, etc.)
Appropriate Public notices ( i.e. Newspaper notice and Site notice (s)).
Planning fees appropriate to the type and size of application.
Environmental Impact Statements(Where required).
In the case of a Building which is a protected structure or a proposed protected structure,
additional information is required which describes the impact of the project on the character
of the building. Refer to the planning authority for its requirements.
Where applicable the specific requirements under the Regulations for Part 8 and Part 9
applications are noted and implemented as appropriate.
Planning Application timeline :
STAGE
Public Notices
Receipt of Application
TIMESCALE
2 weeks before lodging the
application
2 weeks
Validation
1-5 days
Submissions
5 weeks
Notice of Decision
8 weeks
ACTION
Notice published in Newspaper
and site notice erected
The application must be lodged
within 2 weeks of the publication
of newspaper notice.
The application is validated by the
planning authority as soon as
possible. The current timescale is
within 5 days.
Submissions/observations can be
submitted within the first 5 weeks
of receipt of the application.
Submissions/objections(submitted
in first 5 weeks) are considered.
Planning Authority issues notice
of its decision on the application
within 8 weeks of receipt of the
application. (Alternatively, it may
request further information)
Further Information
6 months
Notice of Decision
4 Weeks (8 Weeks for
Environmental Impact
Assessment)
Appeal
28 days
Final Grant Minimum
4 Weeks + 3 days
The Planning Authority may
request Further Information or
clarification of Further
Information, which must be
responded to within 6 months(
This can be extended by 3 Months
at the discretion of the Planning
Authority)
The Planning Authority issues
notice of its decision on the
application within 4 weeks of
receipt of the Further
Information( or 4 Weeks from the
receipt of the public notices if
Further Information is significant).
(The time period is extended to 8
weeks in case of an application
accompanied by an EIS).
A decision can be appealed to An
Bord Pleanala within 28 days of a
decision.
If the decision is not appealed to
An Bord Pleanala, then the
Planning Authority will issue a
final grant of permission.
Consultation:
The planning application is submitted to the local planning authority. The authority may then consult
with various bodies, such as the Environmental Protection Agency or the Department of Transport,
Tourism, and Sport if the project has potential implications for those areas.
Public Notification is required. This typically involves posting site notices, publishing notices in local
newspapers, and notifying neighbours or other stakeholders who may be affected by the proposed
development.
During a period of five weeks, the public and interested parties can make observations or
submissions to the planning authority regarding the application. The planning authority considers
these views as part of their evaluation.
Planning Authority Decision:
The local planning authority reviews the application, taking into account all relevant information,
observations, and submissions. They will either grant permission, refuse it, or request further
information. In some cases, the application may be deferred.
Appeals:
If the application is refused or conditions are attached to the permission, applicants have the right to
appeal to An Bord Pleanála, an independent planning appeals board.
Compliance with Conditions:
If planning permission is granted, the applicant must adhere to any conditions the planning authority
stipulates. Failure to do so can result in enforcement action.
Construction and Development:
Once planning permission is obtained, the construction or development work can proceed in
compliance with the approved plans and conditions.
It's important to note that planning application procedures and regulations can vary depending on
the type of development, its scale, and its location. Applicants should consult with the local planning
authority and seek professional guidance when preparing and submitting planning applications to
ensure a smooth and compliant process.
4) Route C- K3 – Ability to manage the design from conception etc.
Architects play a crucial role in managing construction projects from design to completion, subject
to regulations and procedures set by the Royal Institute of the Architects of Ireland (RIAI) and local
building codes.
Project Initiation:
-
Architects begin by understanding the client's needs, objectives, and budget. They work
closely with the client to define the project scope and goals.
Pre-Design Phase:
-
Site Analysis: Architects assess the site conditions, including environmental factors and any
local planning or zoning regulations that may affect the project.
Schematic Design Phase:
-
Conceptual Design: Architects present preliminary design concepts to the client. Feedback
and approval are obtained during this phase.
Design Development Phase:
-
Technical Refinement: Architects work on refining the design, incorporating technical details,
materials, and systems while ensuring compliance with Irish building regulations.
Planning and Regulatory Approval:
-
Architects assist the client in obtaining the necessary planning and building permits from the
local authorities. This involves preparing and submitting applications and addressing any
regulatory requirements.
Construction Documents Phase:
-
Architects produce detailed construction drawings and specifications that are essential for
the construction process and regulatory compliance.
Tendering and Contractor Selection:
-
Architects may help clients with the tendering process, which involves selecting contractors.
They may also be involved in contract negotiation.
Construction Phase:
-
Architects oversee the construction process, regularly visiting the site to ensure that the
project is built according to the plans and specifications and complies with Irish building
regulations.
Post-Construction Phase:
-
Architects perform final inspections and help ensure the project meets the required
standards and regulatory compliance.
Throughout these phases, architects ensure that the project aligns with sustainable and energyefficiency standards, which are increasingly important in modern construction. They liaise with local
authorities, contractors, and other stakeholders to manage the project successfully.
It's important to note that the role of architects in project management may vary based on the
project's complexity and the specific services outlined in the architect's contract with the client. The
RIAI governs the professional practice of architecture in Ireland, and architects are required to
adhere to their code of professional conduct and ethical standards.
5) Contract Management
Contract management is essential to the architectural process to ensure that construction projects
are completed successfully, on time, and within budget.
Selection of the Appropriate Contract:
Architects must select the most suitable contract for the specific project. It’s recommended to the
clients for domestic works to choose between the three most conventional standard form contracts:
The RIAI Yellow Form with quantities. The RIAI Blue Form without quantities. The RIAI “SF-88” Short
Form (Pink). The choice of contract will depend on factors like project complexity, size, and client
preferences.
Tendering Process:
Once the contract type is determined, architects assist clients in the tendering process. This involves
inviting contractors to submit bids or tenders for the project. Architects often draft the tender
documents, including the bill of quantities and specifications.
Contract Award:
After receiving and evaluating the tenders, architects, along with the client, select the contractor
based on various criteria, such as cost, experience, and capability. The chosen contractor is then
awarded the contract.
Contract Administration:
Architects play a significant role in the administration of the contract throughout the construction
phase. Their responsibilities typically include:
-
Conducting site visits to monitor progress and quality.
Ensuring compliance with contract documents and specifications.
Reviewing and approving variations or changes to the original contract.
Certifying payments to the contractor.
Resolving disputes or issues that may arise during construction.
Regular Reporting:
Architects are responsible for maintaining open and clear communication with the client,
contractors, and other stakeholders. Regular reporting on project progress, issues, and budget
adherence is crucial.
Managing Project Documentation:
Architects are responsible for maintaining proper project documentation, which includes records of
all contract-related correspondence, change orders, site reports, and drawings.
Dispute Resolution:
In case of disputes between the client and the contractor, architects may play a role in helping to
resolve these conflicts. They can assist in mediation or arbitration processes if required.
Completion and Handover:
Architects oversee the final stages of the construction project, including ensuring that all work is
completed to the client's satisfaction and within the agreed specifications. They are also involved in
the handover process, ensuring the building is suitable for its intended use.
Contract management involves adherence to the relevant legal and regulatory frameworks and
professional standards and ethics, such as those established by the RIAI. Architects also need to stay
updated on changes in contract law and best practices in construction management to handle
contracts in the evolving construction industry effectively.
6) Role of the Architect
The role of an architect is multifaceted and essential in the design and construction of buildings and
other structures. Architects are responsible for creating functional, aesthetically pleasing, safe, and
sustainable environments for people to live, work, and play. Their role encompasses various stages of
a project, from conception to completion, and involves a wide range of responsibilities. Architect's
role:
1- Conceptual Design:
Architects work with clients to understand their needs and desires and then develop a project design
concept. This involves creating initial sketches, layouts, and design proposals.
2- Site Analysis:
Architects assess the project site, considering factors like location, topography, climate, and legal
regulations, to inform the design process and ensure the project's compatibility with its
surroundings.
3- Design Development:
Architects refine the initial design concepts into more detailed plans and drawings. This phase
involves creating blueprints, 3D models, and specifications to guide construction.
4- Regulatory Compliance:
Architects must navigate complex building codes, zoning regulations, and permitting processes. They
ensure the design complies with local and national building standards and obtain approvals and
permits.
5- Budget Management:
Architects often work with clients to establish a budget for the project and must strive to design
within those financial constraints.
6- Project Coordination:
Architects collaborate with various professionals and stakeholders involved in the project, including
engineers, contractors, interior designers, and clients. They act as a central point of contact to ensure
all parties are aligned, and the project progresses smoothly.
7- Material and Technology Selection:
Architects research and select suitable materials and construction techniques that meet the project's
functional and aesthetic requirements while considering sustainability and environmental impact.
8- Environmental Sustainability:
Architects are increasingly responsible for integrating sustainable and eco-friendly design principles
into their projects, addressing energy efficiency, waste reduction, and using renewable resources.
9- Project Management:
Architects may take on a project management role, overseeing the construction process, ensuring
the design is executed correctly, and managing the project schedule and budget.
10- Quality Control:
Architects are responsible for ensuring that the final construction meets the design specifications,
quality standards, and safety requirements.
11- Client Communication:
Architects maintain open and effective communication with clients, informing them about the
project's progress and addressing their concerns and feedback.
12- Problem Solving:
Architects often encounter unexpected challenges during the design and construction phases and
must use their problem-solving skills to find creative solutions.
13- Legal and Ethical Considerations:
Architects must adhere to professional codes of ethics and legal requirements, including contract
law, to protect the interests of their clients and the public.
14- Post-Occupancy Evaluation:
After a project is completed, architects may conduct post-occupancy evaluations to assess how well
the building functions and make any necessary improvements.
Architects are responsible for transforming a client's vision into a built reality while ensuring the
project is safe, functional, sustainable, and aesthetically pleasing. The Architect role encompasses a
wide range of skills, from creative design to technical expertise and project management, and they
play a crucial part in the construction industry and the built environment.
7) Wider Design Team and Roles/Responsibilities
The wider design team for a construction project typically includes professionals collaborating with
the architect to bring a project from concept to completion. Each team member plays a crucial role in
ensuring the success of the project. Key roles and responsibilities within the wider design team:
Architect:
Responsible for the overall design and planning of the project.
Works closely with the client to understand their needs and desires.
Develops design concepts and creates detailed plans and drawings.
Ensures that the project complies with building codes and regulations.
Manages the project from start to finish and coordinates the work of all team members.
Structural Engineer:
Focuses on the structural integrity of the building.
Designs and analyses the load-bearing elements of the structure, such as beams, columns, and
foundations.
Ensures that the building can safely support its intended use.
Mechanical Engineer:
Designs the HVAC (heating, ventilation, and air conditioning) systems.
Plans for the building's plumbing and fire protection systems.
Ensures that the building has a comfortable and functional indoor environment.
Electrical Engineer:
Designs the electrical systems, including power distribution and lighting.
Plans for the integration of technologies like fire alarms, security systems, and data networks.
Ensures that the building has a reliable and efficient electrical supply.
Civil Engineer:
Focuses on site-related aspects, including grading, drainage, and utilities.
Ensures that the site is prepared for the construction of the building.
They may be responsible for infrastructure like roads and parking.
Interior Designer:
Focuses on the interior aesthetics and functionality of the building.
Selects materials, furnishings, and colour schemes.
Ensures the interior design aligns with the overall architectural concept and client's preferences.
Landscape Architect:
Specialises in the design of outdoor spaces, such as gardens, parks, and open areas.
Plans for landscaping, hardscaping, and the integration of natural elements.
Creates a harmonious transition between the built environment and the surrounding landscape.
Cost Estimator:
Prepares cost estimates for the project, including construction materials, labour, and other expenses.
Helps the client and design team establish and manage the project budget.
Environmental Consultant:
Focuses on environmental sustainability and compliance with regulations.
Advises on energy-efficient design, waste reduction, and sustainable materials.
Ensures that the project aligns with environmental laws and regulations.
Project Manager:
Oversees the project's overall execution, including scheduling and budget management.
Coordinates the activities of the design team and construction professionals.
Communicate with the client and manage any issues or changes that arise.
Contractor:
Responsible for the actual construction of the project.
Implements the design plans and manages construction activities on-site.
Ensures the project is built according to specifications, on time, and within budget.
Effective collaboration among these team members is essential for delivering a successful
construction project that meets the client's requirements, complies with regulations, and is
aesthetically pleasing and functional. The architect often serves as the central coordinator, facilitating
communication and ensuring the design and construction processes run smoothly.
8) Route C- A4 – Ability to identify, understand and Incorporate Applicable
Legislation, Regulations etc.
Legislation & Regulation Explanation
Legislation and regulations are related but distinct concepts, and they play a crucial role in governing
various aspects of architecture and construction. Difference between legislation and regulations:
Legislation:
Primary Legislation: Legislation refers to laws enacted by the Irish legislature, the Oireachtas
(comprising the Dáil Éireann and Seanad Éireann). Primary legislation in Ireland includes acts of the
Oireachtas, such as the Planning and Development Act 2000, the Safety, Health, and Welfare at Work
Act 2005, and the Building Control Act 1990.
Enabling Framework: Primary legislation establishes the legal framework and authority for regulating
various aspects of architecture and construction. It sets out broad principles, objectives, and general
provisions.
Amendment Process: Any changes to primary legislation require a formal legislative process
involving debate and approval by the Oireachtas. Amendments typically result from significant policy
changes or to address evolving needs in the construction and architectural sectors.
Regulations:
Secondary Legislation: Regulations, on the other hand, are subsidiary or secondary laws created
under the authority of primary legislation. They are also known as statutory instruments. Regulations
are more specific and provide detailed rules, requirements, and standards to implement the broader
principles outlined in primary legislation.
Detailed Requirements: Regulations in architecture and construction specify detailed technical
standards, procedures, and specific obligations that must be followed. They often outline practical
measures for ensuring safety, quality, and compliance in construction projects.
Faster Amendment Process: Unlike primary legislation, regulations can be amended more quickly
and with greater flexibility to keep up with changing industry standards or emerging issues. Relevant
government departments or agencies typically make these amendments within the framework of the
parent primary legislation.
In summary, primary legislation sets Ireland's overarching legal framework for architecture and
construction. At the same time, regulations are the more detailed, specific rules and standards that
derive their authority from primary legislation. Regulations are used to implement and
operationalise the broader principles outlined in primary legislation. Together, they create a legal
framework that governs and regulates the architectural and construction sectors, ensuring safety,
quality, and compliance with established standards. Architects, contractors, and other professionals
must be knowledgeable about both primary legislation and the applicable regulations to ensure that
they adhere to legal and technical requirements in their work.
Legislation in architecture and construction in Ireland is designed to regulate various aspects of the
built environment, ensuring the safety, quality, and sustainability of construction projects. Some of
the key legislation and regulations in Ireland that impact architecture and construction include:
Building Control Regulations:
Building Control Regulations are intended to ensure the safety and quality of building construction in
Ireland. They set out requirements for design, construction, materials, and workmanship.
The Building Control Regulations also specify the obligations of architects, engineers, and other
construction professionals.
Planning and Development Act 2000-2021:
This legislation governs the planning process in Ireland, including granting planning permissions. It
outlines the procedures for obtaining planning consent for construction projects.
Building Control (Amendment) Regulations 2014:
These regulations require the submission of compliance documentation at key stages of
construction. They introduced the role of the Assigned Certifier, who is responsible for ensuring
compliance with building regulations.
Fire Safety Regulations:
Regulations such as the Fire Services Act 1981 and the Fire Safety Certificate (Amendment)
Regulations 2017 pertain to fire safety in buildings.
They establish requirements for designing and constructing fire safety systems and measures in
buildings.
Disability Access Certificates (DAC):
The Disability Act 2005 and subsequent regulations relate to accessibility for people with disabilities.
A DAC is required to demonstrate that a building complies with accessibility and mobility standards.
Health and Safety Legislation:
Legislation such as the Safety, Health, and Welfare at Work Act 2005 governs health and safety in the
construction industry. It sets out responsibilities for ensuring the safety of construction workers and
the public during construction.
Sustainable Building Regulations:
Regulations related to energy performance and sustainability aim to reduce buildings' environmental
impact. These include requirements for energy efficiency, renewable energy use, and reduction of
greenhouse gas emissions.
Conservation Regulations:
In cases where historic or protected structures are involved, there are regulations related to the
conservation and protection of architectural heritage.
Construction Contracts Act 2013:
This act governs payment and dispute resolution in construction contracts. It provides mechanisms
for ensuring timely payment to contractors and addressing disputes.
Consumer Protection Legislation:
Various consumer protection laws, including the Sale of Goods and Supply of Services Act 1980, offer
protections to homeowners and consumers when dealing with construction contracts.
EU Directives and Regulations:
European Union directives and regulations influence many aspects of Irish construction law and
standards, particularly in areas like environmental protection, safety, and energy efficiency.
It's important for architects, contractors, and other professionals in the construction industry to be
well-versed in these regulations and to ensure that their projects are designed and built in
compliance with them. Failure to adhere to these regulations can lead to legal issues, project delays,
and safety concerns. Additionally, staying updated on changes in legislation and regulations is crucial,
as these can evolve over time.
9) Building Control + Certification process.
Ireland's building control and certification process is designed to ensure the safety and compliance of
construction projects with relevant regulations. The key aspects of this process include:
Building Control Regulations:
The Building Control Regulations set out the legal requirements for constructing and altering
buildings in Ireland. These regulations aim to ensure that buildings are safe, compliant, and built to
the required standards.
Assignment of Roles:
Under the Building Control Regulations, the key roles are the "Designer" (usually an architect) and
the "Builder" (the contractor). There is also the "Assigned Certifier" and the "Builder's Project
Supervisor."
Building Control (Amendment) Regulations 2014:
These regulations introduced significant changes to the building control system in Ireland. One of the
main changes is the requirement for an Assigned Certifier.
Assigned Certifier:
The Assigned Certifier is typically the architect or other qualified professional responsible for
ensuring the construction project complies with the building regulations. They are appointed by the
building owner (typically the client) to oversee the project.
7-Day Notice:
The owner or developer must submit a "7-Day Notice" to the Building Control Authority before
construction work begins. This notice includes details about the project, the designer, and the
assigned certifier.
Pre-Construction Stage:
During the pre-construction stage, the designer (architect) prepares the Preliminary Inspection Plan,
which outlines how the building will be inspected during construction. The assigned certifier is
responsible for this plan.
Design and Compliance:
The designer, typically an architect, is responsible for ensuring that the design complies with building
regulations and other relevant standards. They must sign the documentation that confirms this
compliance.
Inspections During Construction:
The Assigned Certifier is responsible for inspecting and certifying the work during construction,
making sure that it complies with the approved plans and relevant regulations.
Completion Documentation:
Once construction is complete, the builder and the Assigned Certifier compile the required
documentation, which includes the Certificate of Compliance (Design) and the Certificate of
Compliance (Completion). These documents confirm that the project complies with building
regulations.
Completion Certificate:
The Assigned Certifier submits the Certificate of Compliance (Completion) to the Building Control
Authority to confirm that the construction project complies with regulations and standards.
Building Control Authority:
The local Building Control Authority oversees and enforces compliance with the regulations. They
review the documentation and may carry out inspections.
Building Control Inspection:
The Building Control Authority may conduct inspections during or after construction to verify
compliance.
Ireland's building control and certification process is designed to enhance the quality and safety of
construction projects by ensuring that they meet established regulations. The role of the Assigned
Certifier, typically an architect or engineer, is crucial in overseeing the compliance process and
ensuring that the project adheres to the requirements of the law. Building owners, designers,
contractors, and the local Building Control Authority all play essential roles in this process to achieve
successful and compliant construction projects.
10)
Health & Safety at the Design and Construction
Various regulations and best practices govern health and safety in architecture and construction
processes in Ireland to ensure the safety and well-being of workers, the public, and the environment.
Here is an overview of the key components of health and safety in the architecture and construction
industry in Ireland:
Legal Framework:
Ireland's construction industry's primary legislation governing health and safety is the Safety, Health,
and Welfare at Work Act 2005. This act places legal responsibilities on employers, employees,
designers, and others involved in construction projects.
Duty Holders:
Various parties involved in construction have specific responsibilities under the law. These include
employers, employees, the self-employed, designers, contractors, and others. Architects, as part of
the design team, have a duty to consider safety in their designs and to coordinate with other duty
holders.
Construction Regulations:
The Safety, Health, and Welfare at Work (Construction) Regulations 2013 and the Safety, Health, and
Welfare at Work (General Application) Regulations 2007 set out specific requirements for health and
safety in construction projects.
Safety Plans:
Construction projects in Ireland must have a written safety and health plan that identifies hazards,
assesses risks, and outlines safety measures to be implemented during the project.
Design Considerations:
Architects are required to consider safety in their designs. This includes aspects such as safe access,
egress, structural stability, fire safety, and the prevention of falls from height.
Risk Assessment:
Risk assessments are a fundamental part of health and safety in construction. Architects should
assess risks related to their designs and communicate these risks to the rest of the project team.
Safe Work Practices:
Safe work practices should be established and adhered to on construction sites. This includes the use
of personal protective equipment (PPE) and safe methods for manual handling, working at heights,
and other activities.
Construction Site Safety Management:
Contractors are responsible for ensuring that construction sites are managed safely. This includes site
setup, traffic management, safety training, and supervision of workers.
Health and Safety Documentation:
Comprehensive health and safety documentation, including risk assessments, method statements,
and safety data sheets for hazardous substances, should be maintained and accessible to all
personnel on-site.
Inspections and Audits:
Regular inspections and audits should be conducted to monitor and enforce safety standards on
construction sites. This may be carried out by the Health and Safety Authority (HSA) or other
competent persons.
Emergency Procedures:
Effective emergency procedures, such as first aid provisions and evacuation plans, must be in place
on construction sites.
Training and Certification:
Workers and professionals involved in construction projects should receive relevant health and safety
training and certification. This includes Safe Pass certification, which is mandatory for access to
construction sites in Ireland.
Reporting and Investigation:
Accidents, incidents, and near-misses should be reported and investigated to prevent similar
occurrences in the future.
Environmental Health and Safety:
Environmental health and safety considerations are increasingly important, and projects should aim
to minimise environmental impact.
Client and Principal Designer Duties:
Clients have specific duties to ensure that health and safety is managed effectively during the
project, appointing the PSDP at the early stage. The Principal Designer (often an architect) is
responsible for coordinating safety in the design phase.
Ensuring compliance with these regulations and best practices is crucial for architects, contractors,
and all parties involved in construction projects in Ireland. A commitment to safety protects
individuals and the environment and helps avoid legal and financial liabilities associated with safety
breaches. Architects play a vital role in integrating safety considerations into the design phase of
construction projects.
12) Limited Knowledge of Stages 1-4 and very limited beyond.
The Royal Institute of the Architects of Ireland (RIAI) defines a structured project management
process that consists of 8 stages. These stages guide architects and other professionals through the
lifecycle of a construction project. Here is a resume of each stage:
Stage 1: Inception
This stage involves establishing the project's feasibility and defining its objectives. The architect
works closely with clients to understand their needs, budget, and goals.
Key tasks include a project brief, initial site analysis, and regulatory assessment.
Stage 2: Feasibility Study
During this stage, architects conduct a more detailed assessment of the project's feasibility, including
examining site conditions, cost estimates, and potential challenges.
The outcome is a feasibility study report that helps the client make informed decisions about
proceeding with the project.
Stage 3: Design Brief
In this stage, the architect and client collaborate to develop a detailed design brief that outlines the
project's requirements, constraints, and priorities.
The brief serves as a foundation for the subsequent design phases.
Stage 4: Design and Specification
This stage involves developing the project's architectural design and technical specifications.
Architects create conceptual sketches, plans, and models to convey the design intent and detailed
specifications that outline materials, finishes, and construction methods.
Stage 5: Tender Action
During this stage, architects assist the client in preparing and issuing tender documents to potential
contractors.
These documents include detailed drawings and specifications, and they invite contractors to submit
competitive bids for the construction work.
Stage 6: Construction
Once a contractor is selected, the project moves into the construction phase.
The architect oversees the construction process, ensuring that the work is carried out in accordance
with the design, specifications, and building regulations.
Stage 7: Handover and Closeout
At this stage, the project is nearing completion. The architect conducts inspections and ensures that
the work is finished to the required standards.
The project is handed over to the client upon successful completion, including all relevant
documentation, keys, and manuals.
Stage 8: Use and Aftercare
The final stage involves post-construction support and aftercare.
The architect may assist with addressing any defects or issues that arise after the project's
completion and ensuring the building functions as intended.
Throughout these stages, the architect plays a central role in managing the project, coordinating with
other professionals, and ensuring the client's goals are met. It's important to note that the specific
tasks and responsibilities within each stage may vary depending on the project's size, complexity, and
the contractual arrangements between the parties involved. These 8 stages provide a structured
framework for architects and clients to follow when undertaking a building project, helping to ensure
a successful outcome.